(7 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15022A165 | | | number = ML15022A165 |
| | issue date = 01/09/2015 | | | issue date = 01/09/2015 |
| | title = Monticello - License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions | | | title = License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions |
| | author name = Fili K D | | | author name = Fili K D |
| | author affiliation = Northern States Power Co, Xcel Energy | | | author affiliation = Northern States Power Co, Xcel Energy |
Line 14: |
Line 14: |
| | document type = Letter | | | document type = Letter |
| | page count = 3 | | | page count = 3 |
| | | project = TAC:MF5002 |
| | | stage = Supplement |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:ENCLOSURES 1, 3,4, 5 CONTAIN PROPRIETARY INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390 XcelEnergy Monticello Nuclear Generating Plant 2807 W County Rd 75 Monticello, MN 55362 January 9, 2015 L-MT-14-103 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 License Amendment Request for AREVA Extended Flow Window Supplement to Respond to NRC Staff Questions (TAC No. MF5002) |
| | |
| | ==References:== |
| | : 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window," L-MT-14-044, dated October 3, 2014. (ADAMS Accession No.ML14283A125) |
| | : 2) Email T. Beltz (NRC) to G. Adams (NSPM), "Monticello Nuclear Generating Plant -Acceptance Review (Opportunity to Supplement) re: AREVA Extended Flow Window License Amendment Request (TAC No. MF5002)," dated December 10, 2014.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would revise TS and would approve certain analytical methods that together would support operation in the expanded power-flow operating domain described as the Extended Flow Window (EFW). The purpose of the requested amendment is to transition from the General Electric methodology called Maximum Extended Load Line Limit Analysis Plus (MELLLA+) |
| | to-the AREVA methodology called EFW.In Reference 2, NRC Staff identified further information that was required to support their acceptance review. The correspondence stated that the submitted LAR could be supplemented to provide the required information. |
| | The purpose of this supplement is to provide the required information. |
| | The general approach to this supplement was discussed with NRC Staff in a telephone conference on December 2, 2014.I)A_( |
| | Document Control Desk Page 2 Enclosure 1 provides AREVA Report ANP-3376P, Revision 0, which provides reply to the questions posed in Reference |
| | : 2. Enclosure 1 is proprietary to AREVA.Enclosure 2 provides the non-proprietary AREVA Report ANP-3376NP, Revision 0.The nonproprietary report is being provided based on the NRC's expectation that the submitter of the proprietary information should provide, if.possible, a nonproprietary version of the document with brackets showing where the proprietary information has been deleted.Enclosure 3 provides AREVA FS1 -0008928, FSQA-07-AISHA User and Programmer's Manual for BWR Transient Analysis Including Large Oscillations, Revision 2.0. This manual is proprietary in its entirety.Enclosure 4 provides AREVA FS1-0008916, FSQA-07-SINANO User's and Programmer's Manual, Revision 2.0. This manual is proprietary in its entirety.Enclosure 5 provides AREVA Report EMF-2279(P), Revision 0, STAIF: A Computer Program for BWR Stability in the Frequency Domain -Theory Manual, dated September 2001. This manual is proprietary in its entirety.Enclosure 6 provides affidavits executed to support withholding Enclosures 1, 3, 4, and 5 from public disclosure. |
| | These Enclosures contain proprietary information as defined by 10 CFR 2.390. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in 10 CFR 2.390(b)(4). |
| | Accordingly, NSPM respectfully requests that the AREVA proprietary information in Enclosures 1, 3, 4, and 5 be withheld from public disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of the AREVA information in Enclosure 4 or the supporting AREVA affidavits in Enclosure 6 should be addressed to Mr. Alan Meginnis, Manager- Product Licensing, AREVA Inc., 2101 Horn Rapids Road, Richland, Washington 99354.The information offered herein does not affect the conclusions of the Significant Hazards Consideration and the Environmental Consideration evaluations provided in the Reference 1 LAR.In accordance with 10 CFR 50.91(b), a copy of this application supplement is being provided to the designated Minnesota Official without enclosures. |
| | If there are any questions or if additional information is needed, please contact Glenn Adams at 612-330-6777. |
| | Document Control Desk Page 3 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments. |
| | I declare under penalty of perjury that the foregoing is true and correct.Executed on: January 9, 2015 Kar4- D. Fili Site Vice-President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Enclosures (6)cc: Administrator, Region III, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC Minnesota Department of Commerce (w/o enclosures)}} |
Letter Sequence Supplement |
---|
|
|
MONTHYEARML15022A1652015-01-0909 January 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15030A0092015-01-28028 January 2015 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance Review for License Amendment Request Transition to Areva Extended Flow Window Methodology Project stage: Acceptance Review ML15195A4472015-08-0505 August 2015 Summary of Public Meeting with Xcel Energy and Areva to Discuss Changes to the Proposed Technical Specifications and COLR in Support of the Areva Extended Flow Window License Amendment Request Project stage: Meeting L-MT-15-057, License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions2015-08-26026 August 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement ML15140A1242015-09-28028 September 2015 Request for Withholding Information from Public Disclosure from Areva Inc. Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15140A1472015-09-28028 September 2015 Request for Withholding Information from Public Disclosure (GE-Hitachi LLC) Associated with the Areva Extended Flow Window License Amendment Request Project stage: Withholding Request Acceptance ML15274A4732015-09-29029 September 2015 License Amendment Request for Areva Extended Flow Window Supplement to Respond to NRC Staff Questions Project stage: Supplement L-MT-15-065, Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits2015-09-29029 September 2015 Enclosure 8, Areva Report ANP-3424NP, Revision 1 to Areva Responses to RAI from Scvb on MNGP EFW LAR (Non-Proprietary) and Enclosure 9, Areva Affidavits Project stage: Response to RAI ML15274A4752015-09-29029 September 2015 Enclosure 6, Areva Report ANP-3435NP, Revision 0 to Are VA Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW LAR (Non-Proprietary) Project stage: Response to RAI ML15274A4742015-09-29029 September 2015 Enclosure 4, Engineering Evaluation, EC 25987, Calculation Framework for the Extended Flow Window Stability (Efws) Setpoints Project stage: Other L-MT-15-081, ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar.2015-12-0808 December 2015 ANP-3435NP, Revision 1, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI ML15345A4072015-12-0808 December 2015 License Amendment Request for Areva Extended Flow Window, Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement ML16063A0332016-02-29029 February 2016 License Amendment Request for Areva Extended Flow Window Supplement to Disposition Changes to Non-Limiting Transient Analyses Project stage: Supplement L-MT-16-017, Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology2016-04-29029 April 2016 Revised Commitment to Reconcile Analysis of Bypass Voiding for Transition to Areva Analysis Methodology Project stage: Other ML16221A2742016-07-31031 July 2016 ANP-3435NP, Revision 2, Areva Responses to RAI-8 and RAI-32 from Srxb and Snpb on MNGP EFW Lar. Project stage: Response to RAI L-MT-16-037, ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I.2016-07-31031 July 2016 ANP-3284NP, Revision 1, Results of Analysis and Benchmarking of Methods for Monticello ATWS-I. Project stage: Other ML16221A2752016-07-31031 July 2016 ANP-3274NP, Revision 2, Analytical Methods for Monticello ATWS-I. Project stage: Other ML16221A2732016-08-0404 August 2016 License Amendment Request for Areva Extended Flow Window Supplement to Provide Revised Analysis of Anticipated Transient Without Scram Instability Project stage: Supplement L-MT-16-041, License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties2016-09-14014 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Address Power Distribution Uncertainties Project stage: Supplement L-MT-16-049, License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation2016-09-28028 September 2016 License Amendment Request for Areva Extended Flow Window Supplement to Revise the Applicability of a Topical Report Limitation Project stage: Supplement 2015-09-29
[Table View] |
|
---|
Category:Letter
MONTHYEARML24025A9362024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection IR 05000263/20230102023-09-0707 September 2023 Commercial Grade Dedication Inspection Report 05000263/2023010 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 ML23241A9732023-08-21021 August 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence ML23215A1312023-08-0909 August 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000263/20230022023-08-0707 August 2023 Plantintegrated Inspection Report 05000263/2023002 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 ML23198A0412023-07-28028 July 2023 LRA Availability Letter ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23201A0352023-07-24024 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan IR 05000263/20235012023-07-13013 July 2023 Emergency Preparedness Inspection Report 05000263/2023501 2024-01-31
[Table view] |
Text
ENCLOSURES 1, 3,4, 5 CONTAIN PROPRIETARY INFORMATION WITHHOLD FROM PUBLIC DISCLOSURE IN ACCORDANCE WITH 10 CFR 2.390 XcelEnergy Monticello Nuclear Generating Plant 2807 W County Rd 75 Monticello, MN 55362 January 9, 2015 L-MT-14-103 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 License Amendment Request for AREVA Extended Flow Window Supplement to Respond to NRC Staff Questions (TAC No. MF5002)
References:
- 1) Letter from Karen D. Fili (NSPM), to Document Control Desk (NRC),"License Amendment Request for AREVA Extended Flow Window," L-MT-14-044, dated October 3, 2014. (ADAMS Accession No.ML14283A125)
- 2) Email T. Beltz (NRC) to G. Adams (NSPM), "Monticello Nuclear Generating Plant -Acceptance Review (Opportunity to Supplement) re: AREVA Extended Flow Window License Amendment Request (TAC No. MF5002)," dated December 10, 2014.In Reference 1, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested approval of an amendment to the Monticello Nuclear Generating Plant (MNGP) Renewed Operating License (OL) and Technical Specifications (TS). The proposed change would revise TS and would approve certain analytical methods that together would support operation in the expanded power-flow operating domain described as the Extended Flow Window (EFW). The purpose of the requested amendment is to transition from the General Electric methodology called Maximum Extended Load Line Limit Analysis Plus (MELLLA+)
to-the AREVA methodology called EFW.In Reference 2, NRC Staff identified further information that was required to support their acceptance review. The correspondence stated that the submitted LAR could be supplemented to provide the required information.
The purpose of this supplement is to provide the required information.
The general approach to this supplement was discussed with NRC Staff in a telephone conference on December 2, 2014.I)A_(
Document Control Desk Page 2 Enclosure 1 provides AREVA Report ANP-3376P, Revision 0, which provides reply to the questions posed in Reference
- 2. Enclosure 1 is proprietary to AREVA.Enclosure 2 provides the non-proprietary AREVA Report ANP-3376NP, Revision 0.The nonproprietary report is being provided based on the NRC's expectation that the submitter of the proprietary information should provide, if.possible, a nonproprietary version of the document with brackets showing where the proprietary information has been deleted.Enclosure 3 provides AREVA FS1 -0008928, FSQA-07-AISHA User and Programmer's Manual for BWR Transient Analysis Including Large Oscillations, Revision 2.0. This manual is proprietary in its entirety.Enclosure 4 provides AREVA FS1-0008916, FSQA-07-SINANO User's and Programmer's Manual, Revision 2.0. This manual is proprietary in its entirety.Enclosure 5 provides AREVA Report EMF-2279(P), Revision 0, STAIF: A Computer Program for BWR Stability in the Frequency Domain -Theory Manual, dated September 2001. This manual is proprietary in its entirety.Enclosure 6 provides affidavits executed to support withholding Enclosures 1, 3, 4, and 5 from public disclosure.
These Enclosures contain proprietary information as defined by 10 CFR 2.390. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the NRC and addresses with specificity the considerations listed in 10 CFR 2.390(b)(4).
Accordingly, NSPM respectfully requests that the AREVA proprietary information in Enclosures 1, 3, 4, and 5 be withheld from public disclosure in accordance with 10 CFR 2.390(a)4, as authorized by 10 CFR 9.17(a)4.Correspondence with respect to the copyright or proprietary aspects of the AREVA information in Enclosure 4 or the supporting AREVA affidavits in Enclosure 6 should be addressed to Mr. Alan Meginnis, Manager- Product Licensing, AREVA Inc., 2101 Horn Rapids Road, Richland, Washington 99354.The information offered herein does not affect the conclusions of the Significant Hazards Consideration and the Environmental Consideration evaluations provided in the Reference 1 LAR.In accordance with 10 CFR 50.91(b), a copy of this application supplement is being provided to the designated Minnesota Official without enclosures.
If there are any questions or if additional information is needed, please contact Glenn Adams at 612-330-6777.
Document Control Desk Page 3 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.Executed on: January 9, 2015 Kar4- D. Fili Site Vice-President Monticello Nuclear Generating Plant Northern States Power Company-Minnesota Enclosures (6)cc: Administrator, Region III, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC Minnesota Department of Commerce (w/o enclosures)