ML16257A118: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16257A118 | | number = ML16257A118 | ||
| issue date = 08/25/2016 | | issue date = 08/25/2016 | ||
| title = | | title = Revision 309 to Final Safety Analysis Report, Chapter 14, Initial Test Program, Table of Contents | ||
| author name = | | author name = | ||
| author affiliation = Entergy Operations, Inc | | author affiliation = Entergy Operations, Inc | ||
Line 15: | Line 15: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iTABLE OF CONTENTSSectionTitle Page14.0INITIAL TEST PROGRAM14.2-114.1SPECIFIC INFORMATION TO BE INCLUDED IN PSAR14.2-114.2SPECIFIC INFORMATION TO BE INCLUDED IN FSAR14.2-114.2.1 | |||
==SUMMARY== | |||
OF TEST PROGRAM AND OBJECTIVES14.2-114.2.2ORGANIZATION AND STAFFING14.2-314.2.3TEST PROCEDURES14.2-1714.2.4CONDUCT OF TEST PROGRAM14.2-19 14.2.5REVIEW, EVALUATION, AND APPROVAL OF TEST RESULTS14.2-2014.2.6TEST RECORDS14.2-2114.2.7COMPARISON OF TEST PROGRAM WITH REGULATORY GUIDES 14.2-21AND IEEE STANDARDS14.2.8UTILIZATION OF REACTOR OPERATING AND TESTING14.2-26EXPERIENCES IN DEVELOPMENT OF TEST PROGRAM14.2.9TRIAL USE OF PLANT PROCEDURES14.2-26 14.2.10INITIAL FUEL LOADING AND INITIAL CRITICALITY14.2-27 14.2.11TEST PROGRAM SCHEDULE14.2-3114.2.12INDIVIDUAL TEST DESCRIPTION14.2-31 WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iiLIST OF TABLESTableTitle14.2-1PHASE II TESTS14.2-2PHASE III TESTS 14.2-3PHASE II TEST FORMAT14.2-4PHASE III TEST FORMAT14.2-5POWER ASCENSION TESTING SEQUENCE WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iiiLIST OF FIGURESFigureTitle14.2-1WATERFORD STARTUP GROUP 14.2-2NUCLEAR OPERATIONS FUNCTIONAL ORGANIZATION CHART14.2-3JOINT TEST GROUP14.2-4PHASE III ORGANIZATIONAL CHART WSES-FSAR-UNIT-3 14-iv Revision 306 (05/12) | |||
UPDATE REFERENCE LIST Chapter 14 Section Cross References | |||
Revision 14-A | |||
Section 14.2.12.3.32.4 ER-W3-2004-0331-000/DRN 05-1545 | |||
Revision 305 | |||
Section 14.2.12. | |||
2.18.3 EC-14270 | |||
Revision 306 | |||
Section 14.2.10.1 EC-12329 | |||
Section 14.2.12. | |||
2.68.3 EC-34060}} |
Latest revision as of 19:25, 6 February 2019
ML16257A118 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 08/25/2016 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML16256A115 | List:
|
References | |
W3F1-2016-0053 | |
Download: ML16257A118 (4) | |
Text
WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iTABLE OF CONTENTSSectionTitle Page14.0INITIAL TEST PROGRAM14.2-114.1SPECIFIC INFORMATION TO BE INCLUDED IN PSAR14.2-114.2SPECIFIC INFORMATION TO BE INCLUDED IN FSAR14.2-114.2.1
SUMMARY
OF TEST PROGRAM AND OBJECTIVES14.2-114.2.2ORGANIZATION AND STAFFING14.2-314.2.3TEST PROCEDURES14.2-1714.2.4CONDUCT OF TEST PROGRAM14.2-19 14.2.5REVIEW, EVALUATION, AND APPROVAL OF TEST RESULTS14.2-2014.2.6TEST RECORDS14.2-2114.2.7COMPARISON OF TEST PROGRAM WITH REGULATORY GUIDES 14.2-21AND IEEE STANDARDS14.2.8UTILIZATION OF REACTOR OPERATING AND TESTING14.2-26EXPERIENCES IN DEVELOPMENT OF TEST PROGRAM14.2.9TRIAL USE OF PLANT PROCEDURES14.2-26 14.2.10INITIAL FUEL LOADING AND INITIAL CRITICALITY14.2-27 14.2.11TEST PROGRAM SCHEDULE14.2-3114.2.12INDIVIDUAL TEST DESCRIPTION14.2-31 WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iiLIST OF TABLESTableTitle14.2-1PHASE II TESTS14.2-2PHASE III TESTS 14.2-3PHASE II TEST FORMAT14.2-4PHASE III TEST FORMAT14.2-5POWER ASCENSION TESTING SEQUENCE WSES-FSAR-UNIT-3CHAPTER 14INITIAL TEST PROGRAM 14-iiiLIST OF FIGURESFigureTitle14.2-1WATERFORD STARTUP GROUP 14.2-2NUCLEAR OPERATIONS FUNCTIONAL ORGANIZATION CHART14.2-3JOINT TEST GROUP14.2-4PHASE III ORGANIZATIONAL CHART WSES-FSAR-UNIT-3 14-iv Revision 306 (05/12)
UPDATE REFERENCE LIST Chapter 14 Section Cross References
Revision 14-A
Section 14.2.12.3.32.4 ER-W3-2004-0331-000/DRN 05-1545
Revision 305
Section 14.2.12.
2.18.3 EC-14270
Revision 306
Section 14.2.10.1 EC-12329
Section 14.2.12.
2.68.3 EC-34060