ML16257A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML16257A158
| number = ML16257A158
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
| title = Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc

Latest revision as of 20:23, 6 February 2019

Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16257A158
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A158 (3)


Text

WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTSSectionTitle Page17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-3 17.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR.

WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.