ML16257A158: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16257A158
| number = ML16257A158
| issue date = 08/25/2016
| issue date = 08/25/2016
| title = Waterford Steam Electric Station, Unit 3, Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
| title = Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
| author name =  
| author name =  
| author affiliation = Entergy Operations, Inc
| author affiliation = Entergy Operations, Inc
Line 14: Line 14:
| document type = Final Safety Analysis Report (FSAR)
| document type = Final Safety Analysis Report (FSAR)
| page count = 3
| page count = 3
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTSSectionTitle Page17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-3 17.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR.
WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.}}

Latest revision as of 20:23, 6 February 2019

Revision 309 to Final Safety Analysis Report, Chapter 17, Quality Assurance
ML16257A158
Person / Time
Site: Waterford Entergy icon.png
Issue date: 08/25/2016
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16256A115 List: ... further results
References
W3F1-2016-0053
Download: ML16257A158 (3)


Text

WSES-FSAR-UNIT-3 17-i CHAPTER 17 QUALITY ASSURANCE TABLE OF CONTENTSSectionTitle Page17.0QUALITY ASSURANCE17.1-1 17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-1 17.2QUALITY ASSURANCE DURING OPERATIONS17.2-1 WSES-FSAR-UNIT-3 17.1-117.0QUALITY ASSURANCE17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to FSAR.

WSES-FSAR-UNIT-3 17.2-117.2QUALITY ASSURANCE DURING OPERATIONS This section is covered in a separate Quality Assurance Program Manual which has been submitted to the NRC.