#REDIRECT [[IR 05000289/2010001]]
{{Adams
| number = ML100621304
| issue date = 03/03/2010
| title = Annual Performance Review and Inspection Plan Three Mile Island 2009 EOC Letter and Report 22 (05000289-10-001)
| author name = Bellamy R R
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name = Pardee C G
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000289
| license number = DPR-050
| contact person = BELLAMY RR
| case reference number = IR-10-001
| document type = Inspection Plan, Letter
| page count = 4
}}
See also: [[followed by::IR 05000289/2010001]]
 
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY
REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA
March 3, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation
Company, LLC President
and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd Warrenville, IL 60555
ANNUAL PERFORMANCE*REVIEWAND
INSPECTION THREE MILE ISLAND NUCLEAR GENERATING
STATION (05000289/2010001 Dear Mr. Pardee, On February 12,2010, the NRC staff completed
its performance
review of the Three Mile Island Nuclear Generating
Station (Three Mile Island) Unit 1. Our technical
staff reviewed performance
indicators (Pis) for the most recent quarter and inspection
results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment
of your safety performance
during this period and our plans for future inspections
at your facility.
This performance
review and enclosed inspection
plan do not include security information.
A separate letter designated
and marked as "Official
Use Only -Security Information" will include the security cornerstone
review and resultant
inspection
plan. Overall, Three Mile Island Unit 1 operated in a manner that preserved
public health and safety and fully met all cornerstone
objectives.
Plant performance
for the most recent quarter, as well as for the first three quarters of the assessment
cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection
findings being classified
as having very low safety significance (Green) and all Pis indicating
performance
at a level requiring
no additional
NRC oversight (Green). Therefore, we plan to conduct reactor oversight
process (ROP) baseline inspections
at your facility.
The enclosed inspection
plan details the inspections, less those related to physical protection, scheduled
through June 30, 2011. The inspection
plan is provided to allow for the resolution
of any scheduling
conflicts
and personnel
availability
issues well in advance of inspector
arrival onsite. Routine resident inspections
are not listed due to their ongoing and continuous
nature. The inspections
in the last nine months of the inspection
plan are tentative
and may be revised at the mid*cycle
review. 
C. 2 In accordance
with 10 CFR 2.390 of the NRC's "Rules of Practice,*
a copy of this letter and its enclosure
will be made available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the
Public Electronic
Reading Room). If circumstances
arise which cause us to change this inspection
plan, we will contact you to discuss the change as soon as possible.
Please contact me at 610-337-5200
with any questions
you may have regarding
this letter or the inspection
plan. Sincerely, Ronald R. Belfamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-289 License Nos: DPR-50 cc
Distribution
via ListServ Three Mile Island Inspectionl
Activity Plan 
C. Pardee 3 In accordance
with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure
will be made available
electronically
for public inspection
in the NRC Public Document Room or from the Publicly Available
Records (PARS) component
of NRC's document system (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rmfadams.html(the
Public Electronic
Reading Room). If circumstances
arise which cause us to change this inspection
plan, we will contact you to discuss the change as soon as possible.
Please contact me at 610-337-5200
with any questions
you may have regarding
this letter or the inspection
plan. Sincerely. (RAJ Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution
w/enel: N. McNamara, RI S. Collins, RA D. Tifft, RI M. Dapas, DRA D. Serenei, RI D. Lew, DRP N. Sheehan, RI J. Clifford, DRP John Thompson, NRR DRS Directors
D. Kern, DRP. SRI DRS Branch Chjefs (6) J. Brand, DRP, RI R. Bellamy, DRP C. La Regina, DRP, Resident OA G. Barber, DRP RidSNrrPMThreeMilelsland
Resource C.Newport,DRP
RidsNrrDirslpab@nrc.gov
J. Grejves, DRP ROPReportsResource@nrc.gov
L. Trocine, RI OEDO SUNSI REVIEW COMPLETE:
ALB (Reviewer's
Initials)
ML 100621304
DOCUMENT NAME: S:\ROP-10
EOC Review\Branch
6\TMI\TMI
ROP10 EOC letter. doc After declaring
this document "An Official Agency Record" it will be released to the Public. To receive a copy of IhIs document, Indicate in the box: "C"" Copy
attac!'IIneo!lenciosure
'e"" Copy with aIt.a::tYnenUenclosure
ON"" No copy RIIORP RI/DRP OKernl OK SBarberl 02124/10 02/25/10 OFFICIAL RECORD COPY 
Page 1 of2 Three Mile Island 02/2412010
.:11;19:57
Iruspection
/ Activity Plan '. Report 22 01/01/2010
-06/30/2011
Planned Dates Start End Title 50001 -SG REPLACENENT
INSP CONTINUED
2 01/04/2010
02/1212010
IP 50001 Steam Generator
Replacement
Inspection
01/11/2010
01/1312010
IP 50001 Steam Generator
Replacement
Inspection
71124 -ACCESS/ALARAIDOSEIINSTRUMENTS
03115/2010
03119/2010
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls 03/15/2010
03119/2010
IP 71124.02 Occupational
ALARA Planning and Controls 03/15/2010
0311912010
IP 71124.03 In-Plant Airborne Radioactivity
Control and Mitigation
03115/2010
03/19/2010
IP 71124.04 Occupational
Dose Assessment
03/15/2010
03/19/2010
IP 71124.05 Radiation
Monitoring
Instrumentation
TI*177 -MANAGING GAS ACCUMULATION
IN ECCS 3 1 03/22/2010
0312612010
IP 2515/177 Managing Gas Accumulation
In Emergency
Core Cooling, Decay Heat Removal & Containment
Spray System EP PROGR -EP PROGRAM INSPECTION
1 03/29/2010
04/0212010
IP 7111402 Radiological
Environmental
Monitoring
Program 03129/2010
04102/2010
IP 7111403 Emergency
Response Organization
Augmentation
Testing 03/2912010
04/02/2010
IP 7111404 Emergency
Action Level and Emergency
Plan Changes 1 03129/2010
0410212010
IP 7111405 Correction
of Emergency
Preparedness
Weaknesses
and Deficiencies
1 03/29/2010
04/02/2010
lP 71151-EP01
DrllilExercise
Performance
03/29i2010
04(02/2010
IP 71151*EP02
ERO Drill Participation
03/2912010
04/02/2010
IP 71151*EP03
Alert & Notification
System MODS -PERMANENT
PLANT MODIFICATIONS
4 0411212010
04/16/2010
IP 7111117T Evaluations
of Changes, Tests, or Experiments
and Permanent
Plant Modlflcations
04126/2010
04f3OJ2010
IP 7111117T Evaluations
of Changes, Tests, or Experiments
and Permanent Plant
Modifications
71124 -INSTRUMENTSfEFFLUENTS
05110/2010
05/14/2010
IP 71124.05 Radiation
MonitOring
Instrumentation
0511012010
0511412010
IP 71124.06 Radioactive
Gaseous and liquid Effluent Treatment
TI*173 * GROUND WATER TI 05/1012010
OSf14f2010
IP 25151173 Review of the Implementation
of the Industry Ground Water Protection
Voluntary
Initiative
711528 -PI&R 4 07f12/2010
07/16/2010
IP 711528 Identification
and Resolution
of Problems 07/26/2010
07/30/2010
IP 711528 Identification
and Resolution
of Problems 7111107T * TRIENNIAL
HEAT SINK 1 08/23/2010
08/27/2010
IP 711110IT Heat Sink Performance
HP*71124 * ACCESS/ALARAlAIRJDOSEIINSTRUMENTS/PI
1111512010
11/19/2010
IP 71124.01 Radiological
Hazard Assessment
and Exposure Controls 11f15/2010
11/1912010
IP 71124.02 Occupational
ALARA Planning and Controls his report does not include INPO and OUTAGE activities.
This report shows only on-site and announced
inspection
procedures, 
Page 20f2 02/241:2010
Report 22 1 1 1 1 1 11:19:57 Planned Dates Start End emMM&.ljjt&&A .fuN 11/1512010
1111912010
11/15/2010
11/19/2010
11/15/2010
11/19/2010
11/15/2010
11/1912010
11115/2010
11/19/2010
11/1512010
11{19/2010
0311412011
03/18/2011
01/24/2011
01/28/2011
02/07/2011
02111/2011
04/11/2011
04/15/2011
04/1112011
04115/2011
04/11/2011
04/15/2011
04/11/2011
0411512011
04/1112011
04/15/2011
05109/2011
05/13/2011
05f23/2011
05t27{2011
05/23/2011
05/27/2011
Three Mile Island Inspection
I Activity Plan 01/01/2010
-06130/2011
Title HP-71124 * ACCESSJALARAlAIRJDOSEIINSTRUMENTSJPI
1 IP 71124.03 In-Plant Airborne Radioactivity
Control and Mitigation
tP 71124.03 In-Plant Airborne Radioactivity
Control and Mitigation
IP 71124.04 Occupational
Dose Assessment
IP 71124.05 Radiation
Monitoring
Instrumentation
IP 71151-OR01
Occupational
Exposure Control Effectiveness
IP 71151-PR01
RETS/ODCM
Radiological
Effluent 711111 B -TMI REQUAL INSP WI P/F RESULTS 3 IP 7111111 B Licensed Operator Requalification
Program TRI FIRE -TRIENNIAL
FIRE PROTECTION
INSPECTION
3 IP 7111105T Fire Protection
[Triennial]
IP 7111105T Fire Protection
[Triennial}
EPEX -EP EXERCISE EVALUATION
4 IP 7111401 Exercise Evaluation
IP 7111404 Emergency
Action Level and Emergency
Plan Changes IP 71151-EP01
Drill/Exercise
Performance
IP 71151-EP02
ERO Drill Participation
IP 71151-EPD3
Alert & Notification
System HP-71124 * RADWASTE IP 71124.08 Radioactive
Solid Waste Processing
and Radioactive
Material Handling.
Storage, and Transportation
HP-71124 -INSTRUMENTS/REMP
IP 71124.05 Radiation
Monitoring
InstrUmentation
IP 71124.07 Public Radiation
Safety his report does not include INPO and OUTAGE This report shows only on-site and announced
inspection
}}

Revision as of 17:27, 30 January 2019

Annual Performance Review and Inspection Plan Three Mile Island 2009 EOC Letter and Report 22 (05000289-10-001)
ML100621304
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 03/03/2010
From: Bellamy R R
NRC/RGN-I/DRP/PB6
To: Pardee C G
Exelon Generation Co, Exelon Nuclear
BELLAMY RR
References
IR-10-001
Download: ML100621304 (4)


See also: IR 05000289/2010001

Text

UNITED NUCLEAR REGULATORY

REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA

March 3, 2010 Mr. Charles G. Pardee Senior Vice President, Exelon Generation

Company, LLC President

and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd Warrenville, IL 60555

ANNUAL PERFORMANCE*REVIEWAND

INSPECTION THREE MILE ISLAND NUCLEAR GENERATING

STATION (05000289/2010001 Dear Mr. Pardee, On February 12,2010, the NRC staff completed

its performance

review of the Three Mile Island Nuclear Generating

Station (Three Mile Island) Unit 1. Our technical

staff reviewed performance

indicators (Pis) for the most recent quarter and inspection

results for the period from January 1 through December 31, 2009. The purpose of this letter is to inform you of our assessment

of your safety performance

during this period and our plans for future inspections

at your facility.

This performance

review and enclosed inspection

plan do not include security information.

A separate letter designated

and marked as "Official

Use Only -Security Information" will include the security cornerstone

review and resultant

inspection

plan. Overall, Three Mile Island Unit 1 operated in a manner that preserved

public health and safety and fully met all cornerstone

objectives.

Plant performance

for the most recent quarter, as well as for the first three quarters of the assessment

cycle, was within the Licensee Response column of the NRC's Action Matrix, based on all inspection

findings being classified

as having very low safety significance (Green) and all Pis indicating

performance

at a level requiring

no additional

NRC oversight (Green). Therefore, we plan to conduct reactor oversight

process (ROP) baseline inspections

at your facility.

The enclosed inspection

plan details the inspections, less those related to physical protection, scheduled

through June 30, 2011. The inspection

plan is provided to allow for the resolution

of any scheduling

conflicts

and personnel

availability

issues well in advance of inspector

arrival onsite. Routine resident inspections

are not listed due to their ongoing and continuous

nature. The inspections

in the last nine months of the inspection

plan are tentative

and may be revised at the mid*cycle

review.

C. 2 In accordance

with 10 CFR 2.390 of the NRC's "Rules of Practice,*

a copy of this letter and its enclosure

will be made available

electronically

for public inspection

in the NRC Public Document Room or from the Publicly Available

Records (PARS) component

of NRC's document system (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(the

Public Electronic

Reading Room). If circumstances

arise which cause us to change this inspection

plan, we will contact you to discuss the change as soon as possible.

Please contact me at 610-337-5200

with any questions

you may have regarding

this letter or the inspection

plan. Sincerely, Ronald R. Belfamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-289 License Nos: DPR-50 cc

Distribution

via ListServ Three Mile Island Inspectionl

Activity Plan

C. Pardee 3 In accordance

with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure

will be made available

electronically

for public inspection

in the NRC Public Document Room or from the Publicly Available

Records (PARS) component

of NRC's document system (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rmfadams.html(the

Public Electronic

Reading Room). If circumstances

arise which cause us to change this inspection

plan, we will contact you to discuss the change as soon as possible.

Please contact me at 610-337-5200

with any questions

you may have regarding

this letter or the inspection

plan. Sincerely. (RAJ Ronald R. Bellamy, Ph.D., Chief Projects Branch 6 Division of Reactor Projects Distribution

w/enel: N. McNamara, RI S. Collins, RA D. Tifft, RI M. Dapas, DRA D. Serenei, RI D. Lew, DRP N. Sheehan, RI J. Clifford, DRP John Thompson, NRR DRS Directors

D. Kern, DRP. SRI DRS Branch Chjefs (6) J. Brand, DRP, RI R. Bellamy, DRP C. La Regina, DRP, Resident OA G. Barber, DRP RidSNrrPMThreeMilelsland

Resource C.Newport,DRP

RidsNrrDirslpab@nrc.gov

J. Grejves, DRP ROPReportsResource@nrc.gov

L. Trocine, RI OEDO SUNSI REVIEW COMPLETE:

ALB (Reviewer's

Initials)

ML 100621304

DOCUMENT NAME: S:\ROP-10

EOC Review\Branch

6\TMI\TMI

ROP10 EOC letter. doc After declaring

this document "An Official Agency Record" it will be released to the Public. To receive a copy of IhIs document, Indicate in the box: "C"" Copy

attac!'IIneo!lenciosure

'e"" Copy with aIt.a::tYnenUenclosure

ON"" No copy RIIORP RI/DRP OKernl OK SBarberl 02124/10 02/25/10 OFFICIAL RECORD COPY

Page 1 of2 Three Mile Island 02/2412010

.:11;19:57

Iruspection

/ Activity Plan '. Report 22 01/01/2010

-06/30/2011

Planned Dates Start End Title 50001 -SG REPLACENENT

INSP CONTINUED

2 01/04/2010

02/1212010

IP 50001 Steam Generator

Replacement

Inspection

01/11/2010

01/1312010

IP 50001 Steam Generator

Replacement

Inspection

71124 -ACCESS/ALARAIDOSEIINSTRUMENTS

03115/2010

03119/2010

IP 71124.01 Radiological

Hazard Assessment

and Exposure Controls 03/15/2010

03119/2010

IP 71124.02 Occupational

ALARA Planning and Controls 03/15/2010

0311912010

IP 71124.03 In-Plant Airborne Radioactivity

Control and Mitigation

03115/2010

03/19/2010

IP 71124.04 Occupational

Dose Assessment

03/15/2010

03/19/2010

IP 71124.05 Radiation

Monitoring

Instrumentation

TI*177 -MANAGING GAS ACCUMULATION

IN ECCS 3 1 03/22/2010

0312612010

IP 2515/177 Managing Gas Accumulation

In Emergency

Core Cooling, Decay Heat Removal & Containment

Spray System EP PROGR -EP PROGRAM INSPECTION

1 03/29/2010

04/0212010

IP 7111402 Radiological

Environmental

Monitoring

Program 03129/2010

04102/2010

IP 7111403 Emergency

Response Organization

Augmentation

Testing 03/2912010

04/02/2010

IP 7111404 Emergency

Action Level and Emergency

Plan Changes 1 03129/2010

0410212010

IP 7111405 Correction

of Emergency

Preparedness

Weaknesses

and Deficiencies

1 03/29/2010

04/02/2010

lP 71151-EP01

DrllilExercise

Performance

03/29i2010

04(02/2010

IP 71151*EP02

ERO Drill Participation

03/2912010

04/02/2010

IP 71151*EP03

Alert & Notification

System MODS -PERMANENT

PLANT MODIFICATIONS

4 0411212010

04/16/2010

IP 7111117T Evaluations

of Changes, Tests, or Experiments

and Permanent

Plant Modlflcations

04126/2010

04f3OJ2010

IP 7111117T Evaluations

of Changes, Tests, or Experiments

and Permanent Plant

Modifications

71124 -INSTRUMENTSfEFFLUENTS

05110/2010

05/14/2010

IP 71124.05 Radiation

MonitOring

Instrumentation

0511012010

0511412010

IP 71124.06 Radioactive

Gaseous and liquid Effluent Treatment

TI*173 * GROUND WATER TI 05/1012010

OSf14f2010

IP 25151173 Review of the Implementation

of the Industry Ground Water Protection

Voluntary

Initiative

711528 -PI&R 4 07f12/2010

07/16/2010

IP 711528 Identification

and Resolution

of Problems 07/26/2010

07/30/2010

IP 711528 Identification

and Resolution

of Problems 7111107T * TRIENNIAL

HEAT SINK 1 08/23/2010

08/27/2010

IP 711110IT Heat Sink Performance

HP*71124 * ACCESS/ALARAlAIRJDOSEIINSTRUMENTS/PI

1111512010

11/19/2010

IP 71124.01 Radiological

Hazard Assessment

and Exposure Controls 11f15/2010

11/1912010

IP 71124.02 Occupational

ALARA Planning and Controls his report does not include INPO and OUTAGE activities.

This report shows only on-site and announced

inspection

procedures,

Page 20f2 02/241:2010

Report 22 1 1 1 1 1 11:19:57 Planned Dates Start End emMM&.ljjt&&A .fuN 11/1512010

1111912010

11/15/2010

11/19/2010

11/15/2010

11/19/2010

11/15/2010

11/1912010

11115/2010

11/19/2010

11/1512010

11{19/2010

0311412011

03/18/2011

01/24/2011

01/28/2011

02/07/2011

02111/2011

04/11/2011

04/15/2011

04/1112011

04115/2011

04/11/2011

04/15/2011

04/11/2011

0411512011

04/1112011

04/15/2011

05109/2011

05/13/2011

05f23/2011

05t27{2011

05/23/2011

05/27/2011

Three Mile Island Inspection

I Activity Plan 01/01/2010

-06130/2011

Title HP-71124 * ACCESSJALARAlAIRJDOSEIINSTRUMENTSJPI

1 IP 71124.03 In-Plant Airborne Radioactivity

Control and Mitigation

tP 71124.03 In-Plant Airborne Radioactivity

Control and Mitigation

IP 71124.04 Occupational

Dose Assessment

IP 71124.05 Radiation

Monitoring

Instrumentation

IP 71151-OR01

Occupational

Exposure Control Effectiveness

IP 71151-PR01

RETS/ODCM

Radiological

Effluent 711111 B -TMI REQUAL INSP WI P/F RESULTS 3 IP 7111111 B Licensed Operator Requalification

Program TRI FIRE -TRIENNIAL

FIRE PROTECTION

INSPECTION

3 IP 7111105T Fire Protection

[Triennial]

IP 7111105T Fire Protection

[Triennial}

EPEX -EP EXERCISE EVALUATION

4 IP 7111401 Exercise Evaluation

IP 7111404 Emergency

Action Level and Emergency

Plan Changes IP 71151-EP01

Drill/Exercise

Performance

IP 71151-EP02

ERO Drill Participation

IP 71151-EPD3

Alert & Notification

System HP-71124 * RADWASTE IP 71124.08 Radioactive

Solid Waste Processing

and Radioactive

Material Handling.

Storage, and Transportation

HP-71124 -INSTRUMENTS/REMP

IP 71124.05 Radiation

Monitoring

InstrUmentation

IP 71124.07 Public Radiation

Safety his report does not include INPO and OUTAGE This report shows only on-site and announced

inspection