IR 05000416/2017302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML17135A426
| number = ML18075A019
| issue date = 05/12/2017
| issue date = 11/30/2017
| title = Grand Gulf Nuclear Station - Notification of NRC Initial Operator Licensing Examination 05000416/2017302
| title = Grand Gulf - NRC Initial Operator Licensing Examination Approval 05000416/2017302
| author name = Gaddy V G
| author name = Gaddy V G
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
Line 9: Line 9:
| docket = 05000416
| docket = 05000416
| license number = NPF-029
| license number = NPF-029
| contact person =  
| contact person = Gaddy V G
| document type = Letter, License-Operator, Part 55 Examination Related Material
| document report number = 50-416/2017302
| page count = 3
| document type = Letter, License-Operator, Other HQ and Regional Correspondence
| page count = 2
}}
}}


Line 18: Line 19:
=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:
[[Issue date::May 12, 2017]]
Mr. Eric Larson, Site Vice President Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000416/2017302
==Dear Mr. Larson:==
In a telephone conversation on April 26, 2017, between Messrs. S. Purdon, Superintendent, Initial Exam, and B. Larson, Chief Examiner, a rrangements were made for the administration of licensing examinations at Grand Gulf Nuclear Station during the week of December 4, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 11, and NUREG-1123, "Knowledge and Abilities Catalog for Nuclear Power
Plant Operators," Revision 2, Supplement 1.
The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test examination outlines by July 7, 2017. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by September 8, 2017.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of October 30, 2017.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff shall retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) by November 6, 2017. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted by November 20, 2017.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501, et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2019. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to BJS1@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affair s, NEOB-10202 (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Purdon has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact M at 817-200-1171 or myself at
817-200-1159.
Sincerely,/RA/
Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety
Docket No. 50-416 License No. NPF-29
cc: Electronic Distribution
ML17135A426 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: BLarson Yes No Publicly Available Sensitive NRC-002 OFFICE SOE:OB C:OB NAME BLarson VGaddy SIGNATURE /RA/ /RA/ DATE 5/11/2017 5/12/2017
}}
}}

Revision as of 01:59, 18 October 2018

Grand Gulf - NRC Initial Operator Licensing Examination Approval 05000416/2017302
ML18075A019
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 11/30/2017
From: Vincent Gaddy
Operations Branch IV
To: Emily Larson
Entergy Operations
Gaddy V G
References
50-416/2017302
Download: ML18075A019 (2)


Text