Line 1: |
Line 1: |
| {{Adams | | {{Adams |
| | number = ML093200664 | | | number = ML091310493 |
| | issue date = 11/16/2009 | | | issue date = 05/08/2009 |
| | title = Er 05000382-09-301 on 10/05/2009 - 10/27/09 for Waterford Steam Electric Station, Unit 3 | | | title = Waterford Unit 3 - Notification of NRC Initial Operator Licensing Examination 05000382/2009301 |
| | author name = Garchow S M | | | author name = Lantz R E |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
| | addressee name = Kowalewski J | | | addressee name = Kowalewski J A |
| | addressee affiliation = Entergy Operations, Inc | | | addressee affiliation = Entergy Operations, Inc |
| | docket = 05000382 | | | docket = 05000382 |
| | license number = NPF-038 | | | license number = NPF-038 |
| | contact person = | | | contact person = |
| | document report number = 50-382/09-301 | | | case reference number = 50-382/09-301 |
| | document type = Letter, License-Operator Examination Report | | | document type = License-Operator, Part 55 Examination Related Material |
| | page count = 9 | | | page count = 5 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::November 16, 2009]] | | [[Issue date::May 8, 2009]] |
|
| |
|
| Joseph Kowalewski, Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 | | Joseph Kowalewski, Vice President, Operations Entergy Operations, Inc. |
|
| |
|
| SUBJECT: WATERFORD STEAM ELECTRIC STATION, UNIT 3 - NRC EXAMINATION REPORT 05000382/2009301 | | Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093 |
| | |
| | SUBJECT: WATERFORD UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2009301 |
|
| |
|
| ==Dear Mr. Kowalewski:== | | ==Dear Mr. Kowalewski:== |
| On October 14, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Waterford Steam Electric Station, Unit 3. The enclosed report documents the examination findings and licensing decisions. The preliminary examination findings were discussed on October 8, 2009, with you and other members of your staff. A telephonic exit meeting was conducted on October 27, 2009, with Mr. Horace J. Lewis, Superintendent, Operations Training, who was provided the NRC licensing decisions.
| | In a telephone conversation on May 5, 2009 between Messrs. Horace J. Lewis, Operations Training Superintendent, and Brian Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Unit 3, during the week of October 5, 2009. |
| | |
| The examination included the evaluation of five applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses and two applicants for upgrade senior reactor operator licenses. The license examiners determined that nine of the ten applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff. The enclosure to this letter contains the details of this report.
| |
| | |
| No findings of significance were identified during this examination.
| |
| | |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| |
| | |
| Sincerely,/RA/
| |
| Stephen M. Garchow, Acting Chief Operations Branch Division of Reactor Safety Entergy Operations, Inc - 2 -Docket: 50-382 License: NPF-38
| |
| | |
| ===Enclosure:===
| |
| NRC Examination Report 05000382/2009301 cc w/enclosure: Senior Vice President Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995
| |
| | |
| Senior Vice President and Chief Operating Officer Entergy Operations, Inc. P. O. Box 31995 Jackson, MS 39286-1995
| |
| | |
| Vice President, Operations Support Entergy Services, Inc. P. O. Box 31995 Jackson, MS 39286-1995
| |
| | |
| Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc. P. O. Box 31995 Jackson, MS 39286-1995
| |
| | |
| Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751 Director Nuclear Safety Assurance Entergy Operations, Inc.
| |
| | |
| 17265 River Road Killona, LA 70057-0751 General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751
| |
| | |
| Entergy Operations, Inc - 3 -Manager, Licensing Entergy Operations, Inc. 17265 River Road Killona, LA 70057-3093 Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA 70821-9154 Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 Director, Nuclear Safety & Licensing Entergy, Operations, Inc. 440 Hamilton Avenue White Plains, NY 10601 Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312 Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209
| |
| | |
| Entergy Operations, Inc - 4 -Electronic distribution by RIV: Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) DRP Director (Dwight.Chamberlain@nrc.gov) DRP Deputy Director (Anton.Vegel@nrc.gov) DRS Director (Roy.Caniano@nrc.gov)
| |
| DRS Deputy Director (Troy.Pruett@nrc.gov) Senior Resident Inspector (Mark.Haire@nrc.gov) Resident Inspector (Dean.Overland@nrc.gov) Branch Chief, DRP/E (Jeff.Clark@nrc.gov) Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)
| |
| WAT Site Secretary (Linda.Dufrene@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Branch Chief, DRS/TSB (Michael.Hay@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) OEMail Resource ROPreports DRS STA (Dale.Powers@nrc.gov) OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)
| |
| | |
| SUNSI Review Completed: __BTL__ ADAMS: Yes No Initials: __BTL__ Publicly Available Non-Publicly Available Sensitive Non-Sensitive
| |
| | |
| SOE:OB OE:OB SES: ACES C:PBE C:OB BLarson GApger MHaire GReplogle S. Garchow /RA/ /RA/ /RA//RA/ J. Clark /RA/ 11/ 3 /09 11/3/09 10/28/09 11/5/09 11/16/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
| |
| | |
| 1 Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 50-382 License: NPF-38 Report: 05000382/2009301 Licensee: Entergy Operations, Inc Facility: Waterford Steam Electric Station, Unit 3 Location: Hwy. 18 Killona, Louisiana Dates: October 5 - 27, 2009 Inspectors: Brian Larson, Senior Operations Engineer Mark Haire, Senior Enforcement Specialist Gabriel Apger, Operations Engineer Approved by: Steven M. Garchow, Acting Chief Operations Branch Division of Reactor Safety
| |
| | |
| 2 Enclosure
| |
| | |
| =SUMMARY OF FINDINGS=
| |
| ER05000382/2009301; October 5, 2009; Waterford Steam Electric Station, Unit 3; Initial Operator Licensing Examination Report.
| |
|
| |
|
| NRC examiners evaluated the competency of five applicants for reactor operator licenses, three applicants for instant senior reactor operator licenses and two applicants for upgrade senior reactor operator licenses at Waterford Steam Electric Station, Unit 3.
| | As agreed during the telephone conversation, your staff will prepare the examinat ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, S upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The U.S. Nuclear Regulatory |
|
| |
|
| The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the licensee on October 14, 2009. NRC examiners administered the operating tests on October 5-9, 2009.
| | Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered. |
|
| |
|
| The examiners determined that nine of the ten applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued. | | To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 20, 2009. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by A ugust 17, 2009. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. |
|
| |
|
| ===A. NRC-Identified and Self-Revealing Findings===
| | In addition, your support for on-site validation of the examinations is required during the week of September 14, 2009. |
|
| |
|
| No findings of significance were identified.
| | In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, Entergy Operations, Inc. - 2 -temperatures, and levels) generated during the dynamic operating tests until the examination results are final. |
|
| |
|
| ===B. Licensee-Identified Violations===
| | Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
|
| |
|
| None.
| | To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
|
| |
|
| =REPORT DETAILS=
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. |
|
| |
|
| ==OTHER ACTIVITIES (OA)==
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| {{a|4OA5}}
| |
| ==4OA5 Other Activities (Initial Operator License Examination)==
| |
|
| |
|
| ===.1 License Applications===
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC' |
| | s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. |
|
| |
|
| ====a. Scope====
| | Thank you for your cooperation in this matter. Mr. Lewis has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself at 817-860- |
| NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. The examiners also audited three of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
| | 8159. |
|
| |
|
| ====b. Findings====
| | Sincerely,/RA/ |
| No findings of significance were identified.
| |
|
| |
|
| ===.2 Examination Development===
| | Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Entergy Operations, Inc. - 3 - |
| | Docket: 50-382 License: NPF-38 |
|
| |
|
| ====a. Scope====
| | DISTRIBUTION: |
| NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an onsite validation of the operating tests.
| | Senior Vice President Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995 |
|
| |
|
| ====b. Findings====
| | Senior Vice President and Chief Operating Officer Entergy Operations, Inc. |
| NRC examiners provided outline, draft examination and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
| |
|
| |
|
| NRC examiners determined that the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
| | P. O. Box 31995 Jackson, MS 39286-1995 |
|
| |
|
| ===.3 Operator Knowledge and Performance===
| | Vice President, Operations Support Entergy Services, Inc. |
|
| |
|
| ====a. Scope====
| | P. O. Box 31995 Jackson, MS 39286-1995 |
| On October 14, 2009, the licensee proctored the administration of the written examinations to all ten applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on October 19, 2009.
| |
|
| |
|
| The NRC examination team administered the various portions of the operating tests to all ten applicants on October 5 - 9, 2009.
| | Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc. |
|
| |
|
| ====b. Findings====
| | P. O. Box 31995 Jackson, MS 39286-1995 |
| No findings of significance were identified.
| |
|
| |
|
| Nine applicants passed all parts of the operating test. One of the applicants failed the walk-through portion of the operating test. All of the applicants passed the written examination. The final written examinations and post-examination analysis may be accessed in the ADAMS system under the accession numbers noted in the attachment. There were no post-examination comments as indicated in the licensee submittal.
| | Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc. |
|
| |
|
| ===.4 Simulation Facility Performance===
| | 17265 River Road Killona, LA 70057-0751 |
|
| |
|
| ====a. Scope====
| | Director Nuclear Safety Assurance Entergy Operations, Inc. |
| The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
| |
|
| |
|
| ====b. Findings====
| | 17265 River Road Killona, LA 70057-0751 |
| No findings of significance were identified.
| |
|
| |
|
| ===.5 Examination Security===
| | General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc. |
|
| |
|
| ====a. Scope====
| | 17265 River Road Killona, LA 70057-0751 |
| The NRC examiners reviewed examination security during both the onsite preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
| |
|
| |
|
| ====b. Findings====
| | Entergy Operations, Inc. - 4 -Manager, Licensing Entergy Operations, Inc. |
| No findings of significance were identified.
| |
|
| |
|
| {{a|4OA6}}
| | 17265 River Road Killona, LA 70057-3093 |
| ==4OA6 Meetings, Including Exit==
| |
|
| |
|
| The chief examiner presented the preliminary examination results to Mr. Joseph Kowalewski, Vice President, Operations, Ms. Kimberly Cook, Operations Manager, Mr. Mark Schaible, Manager, Training and Development, and other members of the staff on October 8, 2009. A telephonic exit was conducted on October 27, 2009, between Messrs. Brian Larson, Chief Examiner, and Horace J. Lewis, Superintendent, Operations Training.
| | Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA 70821-9154 |
|
| |
|
| The licensee did not identify any information or materials used during the examination as proprietary.
| | Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057 |
|
| |
|
| ATTACHMENT:
| | Director, Nuclear Safety & Licensing Entergy, Operations, Inc. |
|
| |
|
| =SUPPLEMENTAL INFORMATION=
| | 440 Hamilton Avenue White Plains, NY 10601 |
|
| |
|
| ==KEY POINTS OF CONTACT==
| | Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312 |
|
| |
|
| ===Licensee Personnel===
| | Entergy Operations, Inc. - 5 -Electronic distribution by RIV: |
| John Signorelli, Examination Developer
| | Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov) |
| Bruce Proctor, Assistant Operations Manager, Training Horace
| | DRP Director (Dwight.Chamberlain@nrc.gov) |
| : [[contact::J. Lewis]], Superintendent, Operations Training
| | DRP Deputy Director (Anton.Vegel@nrc.gov) |
| ===NRC Personnel===
| | DRS Director (Roy.Caniano@nrc.gov) |
| Dean Overland, Senior Resident Inspector | | DRS Deputy Director (Troy.Pruett@nrc.gov) |
| | Senior Resident Inspector (Ray.Azua@nrc.gov) |
| | Resident Inspector (Dean.Overland@nrc.gov) |
| | Branch Chief, DRP/E (Jeff.Clark@nrc.gov) |
| | Senior Project Engineer, DRP/E (George.Replogle@nrc.gov) |
| | WAT Site Secretary (Linda.Dufrene@nrc.gov) |
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| | Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
|
| |
|
| ==ADAMS DOCUMENTS REFERENCED==
| | ML SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials BTL Publicly Avail Yes No Sensitive Yes No Sens. Type Initials BTL SOE:OB C:OB BTLarson RELantz /RA/ /RA/ 05/7/09 05/8/09 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| Accession No. ML093000575 - FINAL WRITTEN EXAMS Accession No. ML093000580 - POST EXAM ANALYSIS
| |
| }} | | }} |
|
---|
Category:License-Operator
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19011A3712019-01-10010 January 2019 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2019 ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML17013A5482017-01-13013 January 2017 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines 2023-08-15
[Table view] Category:Part 55 Examination Related Material
MONTHYEARIR 05000382/20233012023-08-15015 August 2023 NRC Initial Operator Licensing Examination Approval 05000382/2023301 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML22075A3442022-03-16016 March 2022 Response to Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22108A2662022-03-0909 March 2022 WAT-2022-02 Public Forms W3F1-2022-0019, WAT-2022-02 Post Exam Analysis2022-03-0909 March 2022 WAT-2022-02 Post Exam Analysis ML21117A2932021-04-28028 April 2021 Notification of NRC Initial Operator Licensing Examination 05000382/2022301 ML21106A1512021-04-16016 April 2021 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations W3F1-2020-0056, 08 Post Exam Analysis2020-09-10010 September 2020 08 Post Exam Analysis IR 05000382/20200082020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Outlines ML20294A1372020-08-26026 August 2020 08 Public Forms ML20267A2132020-08-26026 August 2020 08 Final Operating Test ML20267A2122020-08-26026 August 2020 Examination Inspection Report 05000382/2020008 Final Written Exam ML20267A2052020-08-26026 August 2020 08 Draft Outlines ML20267A2072020-08-26026 August 2020 08 Draft Written Exam ML20267A2082020-08-26026 August 2020 08 Draft Written Exam Comments ES-401-9 ML20267A2102020-08-26026 August 2020 08 Draft Operating Test Comments ML20267A2092020-08-26026 August 2020 08 Draft Operating Test.Pdf ML20267A2062020-08-26026 August 2020 05000382/202008 Draft Outline Comments ML20307A1742020-08-10010 August 2020 08 Exam Approval Letter ML20219A292 ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations ML20307A1732020-01-0707 January 2020 05000382/2020008 Corporate Notification Letter ML20007E607 ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18304A4862018-10-30030 October 2018 NRC Initial Operator Licensing Examination Approval 05000382/2018301 ML18089A0412018-03-29029 March 2018 Notification of NRC Initial Operator Licensing Examination 05000382/2018301 ML18009A9852018-01-0808 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17122A0502017-04-10010 April 2017 2017-03 Post Exam Comments ML17137A1862017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Examination - Do Not Release Until 4-30-19 ML17137A1882017-04-0505 April 2017 WATERFORD-2017-03 Draft Operating Test - Do Not Release Until 4-30-19 ML17137A1902017-04-0505 April 2017 2017-03 Final Outlines ML17137A1872017-04-0505 April 2017 WATERFORD-2017-03 Draft Written Exam Comments - Do Not Release Until 4-30-19 ML17137A1892017-04-0505 April 2017 2017-03 Draft Operting Test Comments - Do Not Release Until 04/30/2019 ML17122A0482017-04-0505 April 2017 2017-03 Final Written Examination ML17137A1912017-04-0505 April 2017 WATERFORD-2017-03 Public Forms ML17137A1842017-04-0505 April 2017 2017-03 Draft Outlines - Do Not Release Until 04/30/2019 ML17137A1852017-04-0505 April 2017 WATERFORD-2017-03 Draft Outline Comments - Do Not Release Until 4-30-19 ML17122A0492017-03-27027 March 2017 2017-03 Final Operating Test - Do Not Release Until 4-30-19.pdf ML17075A3402017-03-14014 March 2017 NRC Initial Operator Licensing Examination Approval 05000382/2017301 ML15351A0282015-12-17017 December 2015 Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2016 ML15273A3322015-09-30030 September 2015 Generic Fundamentals Examination Results Sept 2015 ML15308A3802015-09-14014 September 2015 2015-09 Public Forms ML15278A2442015-09-14014 September 2015 WT-2015-09 Draft Written Exam Comments ML15278A2402015-09-14014 September 2015 WT - 2015 - 09 Draft Operating Test Comments ML15278A2372015-09-14014 September 2015 2015-09 Draft Outline Comments ML15278A2312015-09-14014 September 2015 2015-09 Final Operating Test ML15278A2282015-09-14014 September 2015 2015-09 Final Written Examination ML15278A2222015-09-14014 September 2015 2015-09-FINAL Outlines ML15273A4332015-09-14014 September 2015 2015-09 Post Exam Comments ML15225A5642015-09-14014 September 2015 2015-09 Draft Operating Test and Revised Outlines ML15225A5222015-09-14014 September 2015 2015-09 Draft Written Exam and Revised Outlines ML15225A4902015-09-14014 September 2015 2015-09-DRAFT Outlines 2023-08-15
[Table view] |
Text
May 8, 2009
Joseph Kowalewski, Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-3093
SUBJECT: WATERFORD UNIT 3 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000382/2009301
Dear Mr. Kowalewski:
In a telephone conversation on May 5, 2009 between Messrs. Horace J. Lewis, Operations Training Superintendent, and Brian Larson, Chief Examiner, arrangements were made for the administration of licensing examinations at Waterford Unit 3, during the week of October 5, 2009.
As agreed during the telephone conversation, your staff will prepare the examinat ions based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, S upplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by July 20, 2009. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by A ugust 17, 2009. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In addition, your support for on-site validation of the examinations is required during the week of September 14, 2009.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, Entergy Operations, Inc. - 2 -temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC'
s Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Lewis has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larson at 817-860-8172, or myself at 817-860-
8159.
Sincerely,/RA/
Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Entergy Operations, Inc. - 3 -
Docket: 50-382 License: NPF-38
DISTRIBUTION:
Senior Vice President Entergy Nuclear Operations P. O. Box 31995 Jackson, MS 39286-1995
Senior Vice President and Chief Operating Officer Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995
Vice President, Operations Support Entergy Services, Inc.
P. O. Box 31995 Jackson, MS 39286-1995
Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc.
P. O. Box 31995 Jackson, MS 39286-1995
Site Vice President Waterford Steam Electric Station, Unit 3 Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
Director Nuclear Safety Assurance Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751
Entergy Operations, Inc. - 4 -Manager, Licensing Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093
Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA 70821-9154
Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057
Director, Nuclear Safety & Licensing Entergy, Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
Louisiana Department of Environmental Quality, Radiological Emergency Planning and Response Division P. O. Box 4312 Baton Rouge, LA 70821-4312
Entergy Operations, Inc. - 5 -Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov) Deputy Regional Administrator (Chuck.Casto@nrc.gov)
DRP Director (Dwight.Chamberlain@nrc.gov)
DRP Deputy Director (Anton.Vegel@nrc.gov)
DRS Director (Roy.Caniano@nrc.gov)
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Ray.Azua@nrc.gov)
Resident Inspector (Dean.Overland@nrc.gov)
Branch Chief, DRP/E (Jeff.Clark@nrc.gov)
Senior Project Engineer, DRP/E (George.Replogle@nrc.gov)
WAT Site Secretary (Linda.Dufrene@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)