WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station
| ML023520040 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/10/2002 |
| From: | Jacobs D Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| WO 02-0061 | |
| Download: ML023520040 (3) | |
Text
W@LF CREEK
-'NUCLEAR OPERATING CORPORATION Donna Jacobs Plant Manager l-..
"WO 02-0061 U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk Washington, DC 20555
Subject:
Docket No. 50-482: November 2002 Monthly Operating Report Gentlemen:
Attached to this' letter is the Ndverfiber,'2002, Monthly Operating Report for the Wolf
"-Creek Generating -Station., This submittal s-being made in ' accordance with the requirements of Wolf Creek Generating Station Technical -Specification 5.6.4)-"Monthly Operating Reports." This submittal also follows-the guidance*oftGeneric Letter 97-02, "Revised Contents of the MonthlyOperating Report." If you have questions regarding this report, please contact me at (620) 364.4246, or Mr.oTdn, H'arrii at (620) 364-4038, Very trly yours
-Donna Jacobs DJ~rlg Attachment cc:
J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), wla.
P.O. Box 411 /Burlington, KS 66839 I Phone. (620) 364.-8831 An Equal Opportunty Employer M/F/HC/VET-
Attachment to WO 02-0061 Page 1 of 2 OPERATING DATA REPORT Report Number: 213 DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station December 6, 2002 J. L. Yunk (620) 364-4272 REPORT MONTH: November 2002 I1.
IDesign Electrical Rating (MWe - Net):
I 1170
- 2.
Maximum Dependable Capacity (MWe - Net:
1170 This Month Year to Date Cumulative 3..
Number of Hours Reactor Critical:
720.0 7,027.1 129,391.8
- 4.
Number of Hours Generator On-Line:
720.0 6,951.6 128,201.8
.5.
Unit Reserve Shutdown Hours:
0.0 0.0 339.8 6.-- Net Electrical*Energy Generated (MWH) 858,367 8,154,031 145,191,033 Wolf Creek Generating Station Monthly Operating Report November 2002 Page 1 of 2
Attachment to WO 02-0061 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-482 Wolf Creek Generating Station December 6, 2002 J. L. Yunk (620) 364-4272 The unit operated in Mode 1, 100% power, from November 1, 2002, through November 30, 2002.
A: EQUIPMENT FAILURE (EXPLAIN)
B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
H: OTHER (EXPLAIN)
(2) METHOD: 1. MANUAL
- 2. MANUAL SCRAM
- 3. AUTOMATIC SCRAM
- 4. CONTINUATION
- 5. OTHER Wolf Creek Generating Station Monthly Operating Report November 2002 Page 2 of 2
SUMMARY
Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.
Date S: SCHEDULED (Hours)
(1)
(2)
.1
£
.1 a ________________________________ a (1) REASON: