WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station

From kanterella
(Redirected from WO 02-0061)
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Wolf Creek Generating Station
ML023520040
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/10/2002
From: Jacobs D
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
WO 02-0061
Download: ML023520040 (3)


Text

W@LF CREEK

-'NUCLEAR OPERATING CORPORATION Donna Jacobs Plant Manager l-..

"WO 02-0061 U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk Washington, DC 20555

Subject:

Docket No. 50-482: November 2002 Monthly Operating Report Gentlemen:

Attached to this' letter is the Ndverfiber,'2002, Monthly Operating Report for the Wolf

"-Creek Generating -Station., This submittal s-being made in ' accordance with the requirements of Wolf Creek Generating Station Technical -Specification 5.6.4)-"Monthly Operating Reports." This submittal also follows-the guidance*oftGeneric Letter 97-02, "Revised Contents of the MonthlyOperating Report." If you have questions regarding this report, please contact me at (620) 364.4246, or Mr.oTdn, H'arrii at (620) 364-4038, Very trly yours

-Donna Jacobs DJ~rlg Attachment cc:

J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a E. W. Merschoff (NRC), w/a Senior Resident Inspector (NRC), wla.

P.O. Box 411 /Burlington, KS 66839 I Phone. (620) 364.-8831 An Equal Opportunty Employer M/F/HC/VET-

Attachment to WO 02-0061 Page 1 of 2 OPERATING DATA REPORT Report Number: 213 DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station December 6, 2002 J. L. Yunk (620) 364-4272 REPORT MONTH: November 2002 I1.

IDesign Electrical Rating (MWe - Net):

I 1170

2.

Maximum Dependable Capacity (MWe - Net:

1170 This Month Year to Date Cumulative 3..

Number of Hours Reactor Critical:

720.0 7,027.1 129,391.8

4.

Number of Hours Generator On-Line:

720.0 6,951.6 128,201.8

.5.

Unit Reserve Shutdown Hours:

0.0 0.0 339.8 6.-- Net Electrical*Energy Generated (MWH) 858,367 8,154,031 145,191,033 Wolf Creek Generating Station Monthly Operating Report November 2002 Page 1 of 2

Attachment to WO 02-0061 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-482 Wolf Creek Generating Station December 6, 2002 J. L. Yunk (620) 364-4272 The unit operated in Mode 1, 100% power, from November 1, 2002, through November 30, 2002.

A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINTENANCE OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD: 1. MANUAL

2. MANUAL SCRAM
3. AUTOMATIC SCRAM
4. CONTINUATION
5. OTHER Wolf Creek Generating Station Monthly Operating Report November 2002 Page 2 of 2

SUMMARY

Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No.

Date S: SCHEDULED (Hours)

(1)

(2)

.1

£

.1 a ________________________________ a (1) REASON: