ML032940560

From kanterella
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Wolf Creek Generating Station
ML032940560
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/13/2003
From: Moles K
Wolf Creek
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA 03-0131
Download: ML032940560 (3)


Text

LFLFCREEKK--W-

'NUCLEAR OPERATING CORPORATION Kevin J. Moles Manager Regulatory Affairs O-CT 13 2003 RA 03-0131 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk.

Washington, DC 20555

Subject:

Docket No. 50-482: September 2003 Monthly Operating Report Gentlemen:

Attached to-this letter is-the September 2003, Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Wolf Creek Generating Station Technical Specification 5.6.4, Monthly Operating Reports." This submittal also follows the guidance of Generic Letter 97-02, "Revised Contents of the Monthly Operating Report." If you have any questions regarding this report, please contact me at (620) 364-4126, or Ms. Jennifer Yunk at (620) 364-4272.-

Very truly your KJM/rlg Attachment -- --

cc: J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a B. S. Mallett (NRC), w/a Senior Resident Inspector (NRC), w/a P.O. Box 411 / Burlington, KS 66839 Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HC/VET

Attachment to RA 03-0131 Page 1 of 2 OPERATING DATA REPORT Report Number: 223 DOCKET NO.: 50482 UNIT NAME: Wolf Creek Generating Station DATE: October 13, 2003 COMPLETED BY: J. L. Yunk TELEPHONE: (620) 364-4272 REPORT MONTH: September 2003 I 1. I Design Electrical Rating (MWe - Net): l 1170

2. l Maximum Dependable Capacity (MWe - Net): I 1167 l This Month Year to Date Cumulative
3. Number of Hours Reactor Critical: 720.0 6,495.3 136,631.1
4. Number of Hours Generator On-Line: 720.0 6,482.7 135,428.5
5. Unit Reserve Shutdown Hours: 0.0 0.0 339.8
6. Net Electrical Energy Generated MWH) 848,540.0 7,631,886.0 153,710,590.0 Wolf Creek Generating Station Monthly Operating Report September 2003 Page 1 of 2

I)

Attachment to RA 03-0131 Page 2 of 2 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.: 50-482 UNIT NAME: Wolf Creek Generating Station DATE: October 13, 2003 COMPLETED BY: J. L. Yunk TELEPHONE: (620) 364-4272 Type METHOD OF SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS/COMMENTS No. Date S: SCHEDULED (Hours) (1) (2)

SUMMARY

The unit operated in Mode 1, at or near 100% power from September 1, 2003, through September 30, 2003.

(1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2)METHOD: 1. MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2. MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3. AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4. CONTINUATION

5. OTHER Wolf Creek Generating Station Monthly Operating Report September 2003 Page 2 of 2