WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 26 December 2023 | Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | Cyber Security Fire Watch |
WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | 17 May 2023 | Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations | |
WO 23-0009, Financial Protection Levels | 31 March 2023 | Financial Protection Levels | |
WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 19 December 2022 | Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | Cyber Security Fire Watch |
WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | 29 August 2022 | Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums | 6 May 2022 | Generation Station - Guarantee of Payment of Deferred Premiums | |
WO 22-0011, Operating Corp., Financial Protection Levels | 29 March 2022 | Operating Corp., Financial Protection Levels | |
WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | 9 March 2022 | Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations | |
WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 29 December 2021 | Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | Cyber Security Fire Watch |
WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness | 12 August 2021 | (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness | Pandemic Coronavirus |
WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness | 29 July 2021 | One-Time Request for Exemption from the Biennial Emergency Preparedness | Exemption Request Pandemic Coronavirus COVID-19 |
WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan | 25 May 2021 | License Amendment Request (LAR) for Revision to the Emergency Plan | Safe Shutdown Boric Acid Health Physics Network Shutdown Margin High Radiation Area Time to boil Fire Protection Program Grace period Coast down Siren |
WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums | 7 May 2021 | Operating Corp - Guarantee of Payment of Deferred Premiums | |
WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations | 14 April 2021 | Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations | |
WO 21-0014, Financial Protection Levels | 30 March 2021 | Financial Protection Levels | |
WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report | 11 March 2021 | Submittal of Revision 34 to Updated Safety Analysis Report | Incorporated by reference Aging Management License Renewal Grace period |
WO 21-0002, Notification of Readiness for Supplemental Inspection 92723 | 28 January 2021 | Notification of Readiness for Supplemental Inspection 92723 | |
WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 23 December 2020 | Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | Cyber Security Fire Watch |
WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange | 10 November 2020 | License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange | High Radiation Area Stroke time Safe Shutdown Earthquake Earthquake Power Operated Valves |
WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report | 23 July 2020 | Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report | Temporary Modification Incorporated by reference Condition Adverse to Quality Aging Management License Renewal |
WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating | 30 June 2020 | Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment FLEX Large early release frequency Fire Protection Program |
WO 20-0047, Guarantee of Payment of Deferred Premiums | 7 May 2020 | Guarantee of Payment of Deferred Premiums | |
WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 20 April 2020 | License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | High winds Tornado Missile Internal Flooding Past operability Probabilistic Risk Assessment Coatings Nondestructive Examination Aging Management Missed surveillance Local Leak Rate Testing Foreign Material Exclusion Large early release frequency Moisture barrier Flooding Focused Evaluation License Renewal Fuel cladding Power Uprate |
WO 20-0024, Financial Protection Levels | 31 March 2020 | Financial Protection Levels | |
WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | 23 December 2019 | Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 | |
WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System | 29 August 2019 | License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System | |
WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | 8 August 2019 | Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | Time of Discovery |
WO 19-0011, Financial Protection Levels | 27 March 2019 | Financial Protection Levels | |
WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | 11 March 2019 | Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4 | Time of Discovery Missed surveillance |
WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan | 19 November 2018 | Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan | |
WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | 15 November 2018 | Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | |
WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | 15 November 2018 | Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | Shutdown Margin Pressure Boundary Leakage Power change |
WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection | 15 August 2018 | Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection | |
WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | 9 August 2018 | Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term | |
WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 | 23 July 2018 | Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 | Weld Overlay |
WO 18-0016, License Amendment Request for Revision to the Emergency Plan | 9 May 2018 | License Amendment Request for Revision to the Emergency Plan | FLEX |
WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | 16 April 2018 | Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations | |
WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | 5 April 2018 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | |
WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... | 15 January 2018 | Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ... | Unanalyzed Condition Fire Barrier Coatings Earthquake Fuel cladding Affidavit |
WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan | 19 December 2017 | License Amendment Request (LAR) for Revision to the Emergency Plan | FLEX |
WO 17-0092, Request for Regulatory Conference (EA-17-149) | 8 November 2017 | Request for Regulatory Conference (EA-17-149) | |
WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary | 10 October 2017 | Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary | Contraband |
WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme | 26 April 2017 | Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme | |
WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | 20 April 2017 | Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. | 17 April 2017 | Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |
WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | 27 March 2017 | Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses | 22 March 2017 | Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses | |
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme | 16 March 2017 | Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
WO 17-0009, Revision 30 to Updated Safety Analysis Report | 9 March 2017 | Revision 30 to Updated Safety Analysis Report | Safe Shutdown Tornado Missile Hydrostatic Temporary Modification Incorporated by reference FLEX Aging Management Offsite Circuit Fire Protection Program |
WO 16-0068, Docket No. 50-482: Request for Regulatory Conference | 21 December 2016 | Docket No. 50-482: Request for Regulatory Conference | |