Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00826 December 2023Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008Cyber Security
Fire Watch
WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations17 May 2023Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations
WO 23-0009, Financial Protection Levels31 March 2023Financial Protection Levels
WO 22-0056, Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00819 December 2022Operating Corporations Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008Cyber Security
Fire Watch
WO 22-0021, Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report29 August 2022Technical Specification 5.6.8 - Post Accident Monitoring (PAM) ReportPost Accident Monitoring
WO 22-0015, Generation Station - Guarantee of Payment of Deferred Premiums6 May 2022Generation Station - Guarantee of Payment of Deferred Premiums
WO 22-0011, Operating Corp., Financial Protection Levels29 March 2022Operating Corp., Financial Protection Levels
WO 22-0007, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations9 March 2022Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations
WO 21-0064, Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00829 December 2021Operating Corporation, Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008Cyber Security
Fire Watch
WO 21-0031, (Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency Preparedness12 August 2021(Wcgs), Supplement to One-Time Request for Exemption from the Biennial Emergency PreparednessPandemic
Coronavirus
WO 21-0027, One-Time Request for Exemption from the Biennial Emergency Preparedness29 July 2021One-Time Request for Exemption from the Biennial Emergency PreparednessExemption Request
Pandemic
Coronavirus
COVID-19
WO 21-0015, License Amendment Request (LAR) for Revision to the Emergency Plan25 May 2021License Amendment Request (LAR) for Revision to the Emergency PlanSafe Shutdown
Boric Acid
Health Physics Network
Shutdown Margin
High Radiation Area
Time to boil
Fire Protection Program
Grace period
Coast down
Siren
WO 21-0020, Operating Corp - Guarantee of Payment of Deferred Premiums7 May 2021Operating Corp - Guarantee of Payment of Deferred Premiums
WO 21-0019, Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations14 April 2021Operating Corp Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations
WO 21-0014, Financial Protection Levels30 March 2021Financial Protection Levels
WO 21-0010, Submittal of Revision 34 to Updated Safety Analysis Report11 March 2021Submittal of Revision 34 to Updated Safety Analysis ReportIncorporated by reference
Aging Management
License Renewal
Grace period
WO 21-0002, Notification of Readiness for Supplemental Inspection 9272328 January 2021Notification of Readiness for Supplemental Inspection 92723
WO 20-0058, Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00823 December 2020Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008Cyber Security
Fire Watch
WO 20-0050, License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind Flange10 November 2020License Amendment Request to Revise Technical Specification 3.6.3 and Surveillance Requirement 3.6.3.1 to Allow Use of a Blind FlangeHigh Radiation Area
Stroke time
Safe Shutdown Earthquake
Earthquake
Power Operated Valves
WO 20-0040, Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis Report23 July 2020Corrected Revision 33 of the Wolf Creek Generating Station Updated Safety Analysis ReportTemporary Modification
Incorporated by reference
Condition Adverse to Quality
Aging Management
License Renewal
WO 20-0048, Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - Operating30 June 2020Request for Notice of Enforcement Discretion for Technical Specifications 3.8.1, AC Sources - OperatingSafe Shutdown
Enforcement Discretion
Probabilistic Risk Assessment
FLEX
Large early release frequency
Fire Protection Program
WO 20-0047, Guarantee of Payment of Deferred Premiums7 May 2020Guarantee of Payment of Deferred Premiums
WO 20-0029, License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies20 April 2020License Amendment Request to Revise Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test FrequenciesHigh winds
Tornado Missile
Internal Flooding
Past operability
Probabilistic Risk Assessment
Coatings
Nondestructive Examination
Aging Management
Missed surveillance
Local Leak Rate Testing
Foreign Material Exclusion
Large early release frequency
Moisture barrier
Flooding Focused Evaluation
License Renewal
Fuel cladding
Power Uprate
WO 20-0024, Financial Protection Levels31 March 2020Financial Protection Levels
WO 19-0059, Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-00823 December 2019Docket No. 50-482: Wolf Creek Nuclear Operating Corporation'S Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008
WO 19-0033, License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System29 August 2019License Amendment Request for Revision to Technical Specification 3.7.5, Auxiliary Feedwater (AFW) System
WO 19-0031, Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 48 August 2019Supplement 1 to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4Time of Discovery
WO 19-0011, Financial Protection Levels27 March 2019Financial Protection Levels
WO 19-0013, Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 411 March 2019Supplement to Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision 4Time of Discovery
Missed surveillance
WO 18-0045, Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan19 November 2018Submittal of Response to Requests for Additional Information (RAI) Regarding License Amendment Request (LAR) for Revision to the Emergency Plan
WO 18-0047, Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term15 November 2018Timeline for Response to RAI for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
WO 18-0044, Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term15 November 2018Clean Revised Technical Specification Pages for License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source TermShutdown Margin
Pressure Boundary Leakage
Power change
WO 18-0036, Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection15 August 2018Operating Corporation (WCNOC) - Notification of Readiness for Supplemental Inspection
WO 18-0034, Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term9 August 2018Operating Corp., Additional Supplement to License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of Alternative Source Term
WO 18-0031, Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 123 July 2018Inservice Inspection (ISI) Program Relief Request from the Requirements of American Society of Mechanical Engineers (ASME) Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1Weld Overlay
WO 18-0016, License Amendment Request for Revision to the Emergency Plan9 May 2018License Amendment Request for Revision to the Emergency PlanFLEX
WO 18-0014, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations16 April 2018Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations
WO 18-0015, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)5 April 2018Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
WO 18-0004, Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...15 January 2018Response to Request for Additional Information Re License Amendment Request to Revise Technical Specifications to Transition to Westinghouse Core Design and Safety Analysis Including Adoption of ...Unanalyzed Condition
Fire Barrier
Coatings
Earthquake
Fuel cladding
Affidavit
WO 17-0093, License Amendment Request (LAR) for Revision to the Emergency Plan19 December 2017License Amendment Request (LAR) for Revision to the Emergency PlanFLEX
WO 17-0092, Request for Regulatory Conference (EA-17-149)8 November 2017Request for Regulatory Conference (EA-17-149)
WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary10 October 2017Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area BoundaryContraband
WO 17-0042, Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme26 April 2017Operating Corporation Supplement to RAI Response Regarding Adopting New EAL Scheme
WO 17-0041, Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report20 April 2017Supplement to Technical Specification 5.6.8 - Post Accident Monitoring (PAM) ReportPost Accident Monitoring
WO 17-0033, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.17 April 2017Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report27 March 2017Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) ReportPost Accident Monitoring
WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses22 March 2017Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme16 March 2017Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level SchemeSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
WO 17-0009, Revision 30 to Updated Safety Analysis Report9 March 2017Revision 30 to Updated Safety Analysis ReportSafe Shutdown
Tornado Missile
Hydrostatic
Temporary Modification
Incorporated by reference
FLEX
Aging Management
Offsite Circuit
Fire Protection Program
WO 16-0068, Docket No. 50-482: Request for Regulatory Conference21 December 2016Docket No. 50-482: Request for Regulatory Conference