|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0505500542005-02-15015 February 2005 January 2005 Monthly Operating Report for the Wolf Creek Generating Station ML0501902192005-01-0707 January 2005 December 2004 Monthly Operating Report for Wolf Creek Generating Station ML0435101612004-12-0909 December 2004 November 2004 Monthly Operating Report for Wolf Creek Generating Station ML0432305722004-11-11011 November 2004 October 2004 Monthly Operating Report for Wolf Creek Generating Station ML0420300372004-07-12012 July 2004 June 2004 Monthly Operating Report for the Wolf Creek Generating Station ML0414000112004-05-12012 May 2004 April 2004 Monthly Operating Report for Wolf Creek Generating Station ML0332303142003-11-11011 November 2003 October 2003 Monthly Operating Report for Wolf Creek ML0329405602003-10-13013 October 2003 September 2003 Monthly Operating Report for Wolf Creek Generating Station ML0326008922003-09-0909 September 2003 August 2003 Monthly Operating Report for Wolf Creek ML0319704762003-07-0808 July 2003 June 2003 Monthly Operating Report for Wolf Creek Generating Station ML0316205022003-06-0505 June 2003 May 2003 Monthly Operating Report for Wolf Creek Generating Station ML0302204632003-01-14014 January 2003 December 2002 Monthly Operating Report for Wolf Creek WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station2002-12-10010 December 2002 November 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0057, October 2002 Monthly Operating Report for Wolf Creek Generating Station2002-11-0707 November 2002 October 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0052, September 2002 Monthly Operating Report for Wolf Creek2002-10-11011 October 2002 September 2002 Monthly Operating Report for Wolf Creek WO 02-0050, August 2002 Monthly Operating Report for Wolf Creek2002-09-12012 September 2002 August 2002 Monthly Operating Report for Wolf Creek WO 02-0045, July 2002 Monthly Operating Report for Wolf Creek Generating Station2002-08-13013 August 2002 July 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0038, June 2002 Monthly Operating Report for Wolf Creek Generating Station2002-07-10010 July 2002 June 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0033, May 2002 Monthly Operating Report for Wolf Creek Generating Station2002-06-13013 June 2002 May 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0027, April 2002 Monthly Operating Report for Wolf Creek Generating Station2002-05-15015 May 2002 April 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0021, March 2002 Monthly Operating Report for Wolf Creek Generating Station2002-04-0808 April 2002 March 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0015, February 2002 Monthly Operating Report for Wolf Creek2002-03-13013 March 2002 February 2002 Monthly Operating Report for Wolf Creek WO 02-0010, January 2002 Monthly Operating Report for Wolf Creek Generating Station2002-02-15015 February 2002 January 2002 Monthly Operating Report for Wolf Creek Generating Station WO 02-0001, December 2001 Monthly Operating Report for Wolf Creek Generating Station2002-01-10010 January 2002 December 2001 Monthly Operating Report for Wolf Creek Generating Station 2005-02-15
[Table view] |
Text
Kevin J. Moles
-WEiL& CREEK NUCLEAR OPERATING CORPORATION Manager Regulatory Affairs January 7, 2005 RA 05-0004 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Docket No. 50-482: December 2004 Monthly Operating Report Gentlemen:-
Attached to this letter is the December'2004, 'Monthly Operating Report for the Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of.Wolf Creek Generating :Station Technical Spbcification 5.6.4, "Monthly Operating Reports." If you have any questions re6arding this repbrt,'please contact me:'
at (620) 3644126, or Ms. Diane Hooper at (620) 364-4041 Very truly YOYrFP, Kevin J. Ies KJM/rlg Attachment cc: J. N. Donohew (NRC), w/a D. N. Graves (NRC), w/a B. S. Mallett (NRC), w/a Senior Resident Inspector (NRC), w/a PO. Box 411 Burlington. KS 66839 Phone: (620) 364-8831 An Equal Opportunity Employer MIF/HCANET
Attachment to RA 05-0004 Page 1 of 1 OPERATING DATA REPORT Report Number: 239 DOCKET NO. 50 -482 UNIT NAME W olf Creek I DATE U-a3nuary 07, 2005 COMPLETED BY a M. Hooper TELEPHONE __ U0364-404T REPORTING PERIOD: December 2004
- 1. Design Electrical Rating
- 2. Maximum Dependable Capacity (MWe-Net) 1,166 This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was Critical 744.00 8,681.00 146,457.67
- 4. Number of Hours Generator On-line 744.00 8,650.67 145,192.52
- 5. Reserve Shutdown Hours 0.00 0.00 339.80
- 6. Net Electrical Energy Generated (MWHrs) 885,291.00 10,132,736.00 165,113,897.00 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date S: Scheduled (Hours) Reason i Down 2 Comments
SUMMARY
- The unit operated in Mode 1, at or near 100% power, from December 1, 2004, through December 31, 2004.
I 2 Reason: Method:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Wolf Creek Generating Station Monthly Operating Report December 2004 Page 1 of 1