ULNRC-06281, Notice of Organization Change

From kanterella
Jump to navigation Jump to search
Notice of Organization Change
ML16055A525
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/24/2016
From: Maglio S
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06281
Download: ML16055A525 (3)


Text

~~

~Ameren Callaway Plant MISSOURI February 24, 2016 ULNRC-06281 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 NOTICE OF ORGANIZATION CHANGE This is to inform you of a change in senior management within Union Electric Company (dba Ameren Missouri) for Callaway Plant. Specifically, Mr. Timothy E. Herrmann, formerly the Vice President, Engineering, has been promoted to Site Vice President. In that position, Mr. Herrmann replaces Mr. David Neterer who is retiring. (The position of Vice President, Engineering has been eliminated.)

Mr. Fadi Diya remains in his position as Senior Vice President and Chief Nuclear Officer.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at 573-676-8719.

Sincerely, Scott Maglio Manager, Regulatory Affairs TBE/sls

, ........................................................................................................................... PO Box 620 Fulton, MD 65251 AmerenMissouri.com ..............

                                                                                                                                                                                                                                                      • STARS ~ Alliance

ULNRC-06281 February 24, 2016 Page2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08H4 Washington, DC 20555-0001

ULNRC February 24, 2016 Page 3 Index and send hardcopy to QA File Al60.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

F. M. Diya T. E. Herrmann D. W. Neterer L. H. Graessle M.A. McLachlan B. L. Cox S. A. Maglio T. B. Elwood Corporate Communications Corporate Oversight NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission

~~

~Ameren Callaway Plant MISSOURI February 24, 2016 ULNRC-06281 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 NOTICE OF ORGANIZATION CHANGE This is to inform you of a change in senior management within Union Electric Company (dba Ameren Missouri) for Callaway Plant. Specifically, Mr. Timothy E. Herrmann, formerly the Vice President, Engineering, has been promoted to Site Vice President. In that position, Mr. Herrmann replaces Mr. David Neterer who is retiring. (The position of Vice President, Engineering has been eliminated.)

Mr. Fadi Diya remains in his position as Senior Vice President and Chief Nuclear Officer.

This letter does not contain new commitments.

If there are any questions, please contact Scott Maglio at 573-676-8719.

Sincerely, Scott Maglio Manager, Regulatory Affairs TBE/sls

, ........................................................................................................................... PO Box 620 Fulton, MD 65251 AmerenMissouri.com ..............

                                                                                                                                                                                                                                                      • STARS ~ Alliance

ULNRC-06281 February 24, 2016 Page2 cc: Mr. Marc L. Dapas Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08H4 Washington, DC 20555-0001

ULNRC February 24, 2016 Page 3 Index and send hardcopy to QA File Al60.0761 Hardcopy:

Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Other Situations ULNRC Distribution:

F. M. Diya T. E. Herrmann D. W. Neterer L. H. Graessle M.A. McLachlan B. L. Cox S. A. Maglio T. B. Elwood Corporate Communications Corporate Oversight NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission