ULNRC-05987, Callaway Nuclear Plant, Unit 1, 2012 Annual Radiological Environmental Operating Report

From kanterella
Jump to navigation Jump to search
Callaway Nuclear Plant, Unit 1, 2012 Annual Radiological Environmental Operating Report
ML13119A139
Person / Time
Site: Callaway Ameren icon.png
Issue date: 04/27/2013
From: Smith C D
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML131190244 List:
References
ULNRC-05987
Download: ML13119A139 (3)


Text

WAmeren MISSOURI Callaway Plant :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

April27, 2013 ULNRC-05987 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 2012 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Please find the 2012 Annual Radiological Environmental Operating Report for Callaway Plant. This report is submitted in accordance with Section 5.6.2 of the Callaway Plant Technical Specifications and Appendix B to the Callaway Plant Operating License. This letter does not contain new commitments.

lfthere are any questions, please contact Curtis Smith at (314) 225-1482.

Sincerely, Curtis D. Smith Radiation Protection Manager EMP/nls Enclosed:

2012 Annual Radiological Environmental Operating Report ************************************************************************************************************************

PO Box 620 Fulton, MD 65251 AmerenMissouri.com ULNRC-05987 April27, 2013 Page 2 cc: Mr. Arthur T. Howell Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Fred Lyon Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 ULNRC-05987 April27, 2013 Page 3 Index and send hardcopy to QA File Al60.076l Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III L. H. Graessle S. A. Maglio T. B. Elwood R. Holmes-Bobo NSRB Secretary Mr. Ryan Nichols, Director (SEMA) Mr. Thomas Mohr, Senior REP Planner (SEMA) Mr. Tom Masso, REP Planner (SEMA) STARS RA Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Mr. Chris Weiberg (DNR)