Callaway Plant, Unit 1, Responses to RAI Set 5 and Amendment 7 to the Callaway LRA (with Updates to Previous RAI Responses)
ML12235A467
Person / Time
Site: Callaway Ameren icon.png
Issue date: 08/21/2012
From: Kanuckel L H
Ameren Missouri
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML122350582 List:
References
ULNRC-05892
Download: ML12235A467 (4)


Text

WAmeren MISSOURI Callaway Plant :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::

August 21,2012 ULNRC-05892 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO. FACILITY OPERATING LICENSE NPF-30 RESPONSES TO RAI SET #5 AND AMENDMENT 7 TO THE CALLAWAY LRA (WITH UPDATES TO PREVIOUS RAI RESPONSES)

References:

1) ULNRC-05830 dated December 15, 2011 2) NRC Letter, "Request for Additional Information for the Review of the Callaway Plant, Unit 1 License Renewal Application, Set 5 (TAC No. ME7708)," dated July 18, 2012. 3) ULNRC-05886 dated August 6, 2012 By the Reference 1 letter, Union Electric Company (Arneren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated July 18, 2012 transmitted the fifth Request for Additional Information (RAI) related to our application.

Enclosure 1 hereby contains Arneren Missouri's responses to the individual requests contained in the July 18, 2012 RAI. As discussed with the NRC LRA Project Manager on August 20, we have delayed submittal of our RAI our response until today to ensure our responses are complete and accurate.

Enclosure 2 contains LRA Amendment 7 to reflect changes made as a result of the RAI responses.

It should be noted that changes to one commitment (Item #6) are reflected in Table A4-1 (within Enclosure 2). ************************************************************************************************************************

........................................................................................................................

PO Box 620 Fulton, MD 65251 AmerenMissouri.com ULNRC-05892 August 21, 2012 Page 2 Enclosure 3 is included with this transmittal and provides updates to three (3) previous RAI responses transmitted by Reference

3. The updates are provided in "Track Changes." If you have any questions with regard to these RAI responses or Amendment 7, please contact me at (573) 823-9286 or Ms. Sarah Kovaleski at (314) 225-1134.

I declare under penalty of perjury that the foregoing is true and correct. Sincerely, Executed on:

\ASt 2 J) 2 012 Les H. Kanuckel Manager, Engineering Design DS/SGK/nls

Enclosures:

1) Request for Additional Information (RAI) Set #5 Responses
2) Amendment 7, LRA Changes from RAI Responses
3) Updates to Previous RAI Responses ULNRC-05892 August 21, 2012 Page 3 cc: U.S. Nuclear Regulatory Commission (Original)

Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Senior Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 0-8G 14 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 ULNRC-05892 August 21, 2012 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB) Mr. Bill Muilenburg (WCNOC) Mr. Tim Hope (Lurninant Power) Mr. Ron Barnes (APS) Mr. Tom Baldwin (PG&E) Mr. Mike Murray (STPNOC) Ms. Linda Conklin (SCE) Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP) Missouri Public Service Commission Mr. Dru Buntin (DNR)