ULNRC-04957, Response to Order EA-03-009, Revision 1, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.

From kanterella
Jump to navigation Jump to search
Response to Order EA-03-009, Revision 1, Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors.
ML040760795
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/05/2004
From: Keith Young
AmerenUE, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
EA-03-009, Rev 01, ULNRC-04957
Download: ML040760795 (3)


Text

Union Electric PO Box 620 Callaway Plant Fulton, MO 65251 March 5, 2004 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen: ULNRC-04957 wAmeren DOCKET NUMBER 50-483 UE CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF-30 RESPONSE TO ORDER EA-03-009, REVISION 1, "ESTABLISHING INTERIM INSPECTION REQUIREMENTS FOR REACTOR PRESSURE VESSEL HEADS AT PRESSURIZED WATER REACTORS" AmerenUE has received the February 20, 2004, revised NRC Order Establishing Interim Inspection Requirements for Reactor Pressure Vessel Heads at Pressurized Water Reactors. The Order requires an answer within twenty days. AmerenUE files this answer consenting to the revised NRC Order for the Callaway Plant, and indicating its decision to not request a hearing.

This response is submitted in accordance with 10CFR2.202 and the specific requirements contained within the revised order. If you have any questions regarding this submittal, please contact me at (573) 676-8659 or Mr. Dave Shafer, Superintendent -

Licensing at (314) 554-3104.

Sincerely, Keith D. Young Manager - Regulatory Affairs BFH/mlo A.C) a subsidiary efAmeren Corporation

ULNRC-04957 March 5, 2004 Page 2 cc: U.S. Nuclear Regulatory Commission (Original and 1 copy)

Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360

I . 1!

ULNRC-04957 March 5, 2004 Page 4 STATE OF MISSOURI )

) SS COUNTY OF CALLAWAY )

Keith D. Young, of lawful age, being first duly sworn upon oath says that he is Manager, Regulatory Affairs, for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

Keith D. You Manager, Regulatory Affairs SUBSCRIBED and sworn to before me this 5 day of o rc R. , 2004.

< NOTArfrh +t S.Ai PUSLC

~40 7

p-L- Cc%