ULNRC-04901, Response to NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Jump to navigation Jump to search
Response to NRC Regulatory Issue Summary 2003-14, Preparation and Scheduling of Operator Licensing Examinations.
ML032690294
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/15/2003
From: Keith Young
AmerenUE
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-04901
Download: ML032690294 (3)


Text

Union Electric One Ameren Plaza 1901 Chouteau Avenue PO Box 66149 St. Louis, MO 63166-6149 314.621322 September 15, 2003 U. S. Nuclear Regulatory Commission Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Ladies and Gentlemen: ULNRC-04901 wAmeren UE DOCKET NUMBER 50-483 CALLAWAY PLANT UNION ELECTRIC COMPANY RESPONSE TO NRC REGULATORY ISSUE

SUMMARY

2003-14, "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" Attached is the Callaway Plant response to NRC Regulatory Issue Summary (RIS) 2003-14, "Preparation and Scheduling of Operator Licensing Examinations,"

dated August 27, 2003 RIS 2003-14 requested updated information on projected site-specific operator licensing examinations schedules and estimated number of applicants planning to take operator licensing examinations and the NRC's generic fundamentals examinations. A copy of this response is being forward to the Region IV offices as requested.

If you have any questions regarding this submittal, please contact us.

Very truly yours, D. Young Manager - Regulatory Affairs BFH/mlo Attachment

"(oo)3 a aubsidiaryof Ameren Corportion

ULNRC-04901 Page 2 September 15, 2003 cc: U. S. Nuclear Regulatory Commission (Original and 1 copy)

Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Thomas P. Gwynn Acting Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)

Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 Jefferson City, MO 65102

NRC FORM 535 U.. NUCLEAR REGULATORY COMMISSION APPnWO SY0Ms: NO. 3`1Cf131 4EER 07)ltrA" S~~~~~ > hbhd b y h1om OPERATOR LICENSING . mWas;flee

. i0N1 4bjtia=&fiiir EXANMNATION DATA iO. Ofter. Coe* of bhematn W

= c ,DC =. ph go w*o S lb I p d tpoego eddcot dasoescmujiy esawayvddlGAB oeet avro.111 i swc C

sot Sede c aid pirs Ismetreqire4lo m~end .ti

-xt¢y Callaway Plant Docket Number 50-483 iV Facility Operating License NPF - 30 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CtQ04 CY 2005 CYt 2006 Cl 2007 WETIlE0 NUM8ER OFI UCEN4SUPREPAREO 1 0 1 OCA~TIONS ESfMTEDNUMtBEROF 0 NRC-PREPARED 0 0 0 B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2004 CY 2005 CY 2006 CY 2007 NUMBER OF REACTOR 4 6 0 6 OPERTORS NUME£R OF SE"R REACTOR 4 4 0 4 OPERATORS- STANT NUMBER OF 8QJOR REACTOR 3 2 0 2 OPERATORS -UPGRADE NUMBER OF EOR REACTOR 0 0 0 0 OPERATORS-IUUITEO PROPOSED DATES 03104 08105 - 03107 PRIUMA DE 03101104 08122105 03118107 ALTERNATE CATE 03108104 08129105 _ 03126107 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION Iac PWidSW 04"I) V*NWDd4tH>fft