Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Updates Status of Remaining Unimplemented GSIs Identified in NRC". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • B12289, Updates Status of Evaluation,Within Context of Isap,Of Proposed Plant Mod to Reduce Oxygen in Demineralized Water Storage Tank. Failure of Breather Valves on Sys Could Cause Unavailability of Feedwater Sys & Raise Core Melt Frequency  + (Updates Status of Evaluation,Within Context of Isap,Of Proposed Plant Mod to Reduce Oxygen in Demineralized Water Storage Tank. Failure of Breather Valves on Sys Could Cause Unavailability of Feedwater Sys & Raise Core Melt Frequency)
  • ML19330A489  + (Updates Status of Fire Protection Mods Identified in 790727 Safety Evaluation.Requests Expeditious Review of Previously Submitted Items in Table 3)
  • ML20078K696  + (Updates Status of Full Core Reserve at Facility.Full Core Reserve Will Be Lost During Outage Scheduled for Early 1986 If Fuel Performs Properly During Future Operating Cycles)
  • ML20096B371  + (Updates Status of GDC 17 Analysis Per 840417 Request. Completion of All Regulatory Commitments & Mods Except Motor Control Ctr Contactor Coils Scheduled for End of Present Refueling Outages.Final Rept on Coils Expected by Jan 1985)
  • ML20081L138  + (Updates Status of Generic Ltr 89-13, Svc Water Sys Problems Affecting Safety-Related Equipment)
  • ML18057A490  + (Updates Status of Implementation Schedule,Per NRC Comments Re EOP Insp Rept 50-255/89-19.Longer Implementation Schedule Required for Items Not Completed by 900801 Due to Scope of Work)
  • 3F1092-09, Updates Status of Implementation of Station Blackout Rule (10CFR50.63) & Discusses Issues Raised in Supplemental SE for Station Blackout Rule.Only Required Plant Mod Is Addition of Compressed Gas Bottles to Steam Dump Valves  + (Updates Status of Implementation of Station Blackout Rule (10CFR50.63) & Discusses Issues Raised in Supplemental SE for Station Blackout Rule.Only Required Plant Mod Is Addition of Compressed Gas Bottles to Steam Dump Valves)
  • ML17262A188  + (Updates Status of Inoperable Fire Damper I-411-21-P.Mfg of Dampers Will Submit Design to Underwriters Lab for Review, Comment & Approval.Established Hourly Fire Watch Remains in Effect)
  • ML19260D142  + (Updates Status of Insps Required by IE Bulletin 79-14.All Insps Completed for Accessible Areas Except Four Deficiency Repts for Auxiliary Bldg Piping.Seeks Re Deferral of Completion Until 791231,after Receipt of New Fuel)
  • ML18086B024  + (Updates Status of Installation & Testing of Prompt Alerting & Notification Sys.Siren Sys & Ebs Radio Sys Will Be Tested on 820107 & 820415 Respectively.Revised Milestone Encl)
  • ML19259C695  + (Updates Status of Installation of Security Sys Hardware. Vikonics Equipment Repaired & Reinstalled.Testing in Progress.Until Sys Is Fully Operable,Compensatory Measures Extended)
  • ML20236J935  + (Updates Status of Issues Re Plant Design Calculations Review Discussed in SA White to Jg Keppler,Reflecting Info Discussed in 870521 Meeting.Reasons That Certain Issues Remain Open Discussed)
  • B17306, Updates Status of Items Related to Requirements of NUREG- 0737, Clarification of TMI Action Plan Requirements. Compliance Is Restored Except Where Noted in Encl 1.Table of Regulatory Commitments in Encl 2  + (Updates Status of Items Related to Requirements of NUREG- 0737, Clarification of TMI Action Plan Requirements. Compliance Is Restored Except Where Noted in Encl 1.Table of Regulatory Commitments in Encl 2)
  • ML20206T063  + (Updates Status of Items Reported in to NRC Re Expired Nuclecel Ionizer Being Lost.Missing Item Located at Being Returned This Wk to Nrc,In Same Shipment with More Recently Expired Devices,Subj of C Clancy)
  • ML20055D040  + (Updates Status of Items from Past Insps for Cp.Efforts to Reasonably Complete Items within Constraints of No Matl License Complete)
  • ML20148L178  + (Updates Status of Lehigh Portland Cement Cos Responses to NRC Staffs Interrogs & Request for Production of Documents. Interrogs M1-M4,L1-L11 & 01-011 Have Been Answered & Proposed Answers to H1-H11 Have Been Submitted to Bd)
  • ML20211E339  + (Updates Status of Major Cleanup Issues at TMI-2.CY86 Cleanup Progress Discussed.Licensee Current Schedule Provided.Delays in Refueling Have Not Resulted in Significant Safety Consequences.Related Info Encl)
  • ML19341D371  + (Updates Status of Mark I Containment long-term Program for Facility,Re Schedule for Submittal of plant-unique Analysis. Util Will Use Alternate NUREG-0661 Criteria for Assessment of Safety Relief Loads)
  • ML19345C466  + (Updates Status of Model Super Tiger.Two Shipping Packages Were Inspected Per Certificate of Compliance 6400,Revision 8.Findings Encl.Repair & Refurbishing of Units Will Address Five Basic Areas)
  • ML20028F950  + (Updates Status of NUREG-0737,Item II.E.4.2.7, Containment Isolation Dependability. Installation of Automatic Isolation Features for Purge Valves Not Warranted Based on Low Site Boundary Dose)
  • ML20154M147  + (Updates Status of Ongoing Insps of Westinghouse Type DS-206 & DS-416 Pole Shaft Welds,Per NRC Bulletin 88-001, Defects in Westinghouse Circuit Breakers. Util Developing Repair Procedure to Upgrade Welds.Results of Insp Encl)
  • ML20024A520  + (Updates Status of Plant Mods to Resolve in-plant Communication Sys Deficiencies Identified in Response to IE Bulletin 79-18, Audibility Problem Encountered on Evacuation of Personnel from High - Noise Areas)
  • ML20199J792  + (Updates Status of Proposed Advanced Reactor Policy Statement & Interaction W/Doe & Industry on Advanced Reactor Designs. Issuance of Policy Statement Expected in Jul 1986.Receipt of Ack)
  • ML18095A871  + (Updates Status of Radiation Monitoring Sys Upgrade Project, Per Util .Due to Financial Magnitude of Installation of New Computerized Radiation Monitoring Sys, Next Update Delayed Until June 1991)
  • ML20079P438  + (Updates Status of Reactor Operators Licenses at Facility. Lists Operators,Mostly Students,That Have Left Facility & Not Expected to Return to Active Operator Status in Future)