Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17054A213 + (Rev 2 to Procedure N1-RAP-6, Post-Reactor Scram Analysis & Evaluation. Related Info Encl)
- ML20058L337 + (Rev 2 to Procedure Nragp 101-1, Nuclear Review & Audit Group Charter)
- ML20204H547 + (Rev 2 to Procedure OI-67, Operation of AMF Waste Evaporator & Waste Condensate Sys)
- ML20149E032 + (Rev 2 to Procedure OPGP05-ZA-0002, 10CFR50.59 Evaluations, Form 1)
- ML20235S600 + (Rev 2 to Procedure PDP-3. Direct Reading Dosimeter Calibr)
- ML20206T207 + (Rev 2 to Procedure PI-03, Design Verification of Cable Tray Supports)
- ML20206T220 + (Rev 2 to Procedure PI-07, Design Verification of Base Plates,Base Angle & Embedment Plate. Related Info Encl)
- ML17251A632 + (Rev 2 to Procedure PT-32.5, Reactor Trip Breaker a & B Train Response Time Testing)
- ML20092G782 + (Rev 2 to Procedure PTDB-1 Tab 8.0, Pictorial Aids. Supporting Documentation Encl)
- ML20236J055 + (Rev 2 to Procedure PV 361 E, Basic Test Procedure Leak Tests Pressure-Change Procedures)
- ML20087N995 + (Rev 2 to Procedure QC-3-380, Qualification & Certification of Insp & Testing Personnel. Related Info Encl)
- ML20199A657 + (Rev 2 to Procedure QI-QAP-11.1-31, Installation Insp of Mechanical Joints)
- ML20211K067 + (Rev 2 to Procedure QI-QAP-11.1-40, Insulation Installation Insp. Related Info Encl)
- ML20199A570 + (Rev 2 to Procedure QI-QAP-16.1-2, Documenting Base Metal Repairs to Piping,Min Wall Violations & Arc Strike Repairs)
- ML20137H233 + (Rev 2 to Procedure QI-QP-11.0-11, Insp of Cold Weather Concrete Operations)
- ML20137H934 + (Rev 2 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates)
- ML20137J067 + (Rev 2 to Procedure QI-QP-11.0-15, Verification of Base Plates for Grouting)
- ML20137H181 + (Rev 2 to Procedure QI-QP-11.0-2, Reinforcing Steel, Miscellaneous Steel & Embedded Item Placement Insp)
- ML20137H159 + (Rev 2 to Procedure QI-QP-11.0-3, Concrete or Mortar Placement Insp)
- ML20137G975 + (Rev 2 to Procedure QI-QP-11.0-4, Summer Concrete or Mortar Curing Insp)
- ML20137H013 + (Rev 2 to Procedure QI-QP-11.0-5, Insp of Concrete Repair. Related Info Encl)
- ML20137G901 + (Rev 2 to Procedure QI-QP-11.0-6, Insp of Grouting)
- ML20137J260 + (Rev 2 to Procedure QI-QP-11.0-8, Concrete Production Insp)
- ML20137J214 + (Rev 2 to Procedure QI-QP-11.0-9, Soil Backfill Insp)
- ML20199D983 + (Rev 2 to Procedure QI-QP-11.3-16, Class 1E Cable Terminations)
- ML20199D928 + (Rev 2 to Procedure QI-QP-11.3-25.4, Verify Terminations & Splices)
- ML20140F134 + (Rev 2 to Procedure QI-QP-11.4-23, Reinsp of Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
- ML20140F179 + (Rev 2 to Procedure QI-QP-11.4-24, Reinsp of Protective Coatings on Concrete Substrates for Which Documentation Is Missing or Discrepant)
- ML17215A849 + (Rev 2 to Procedure Qi 5-PR/PSL-2, Writers Guide for Emergency Operating Procedures)
- ML20211C895 + (Rev 2 to Procedure Qqap 16, Corrective Action)
- ML20204H596 + (Rev 2 to Procedure RDW 3.2, Disposal of Radwaste in 55 Gallon Drums)
- ML20204H606 + (Rev 2 to Procedure RDW 3.3, Procedure to Absorb Oil W/Hi Dri for Shipment to Richland,Wa Burial Site)
- ML20204H661 + (Rev 2 to Procedure RDW 3.7, Preparation of Radwaste Wood Boxes)
- ML20204H711 + (Rev 2 to Procedure RDW 4.1, Receipt of Radioactive Matl)
- ML20204H837 + (Rev 2 to Procedure RDW 5.10, Selecting Packages for Radioactive Matl Shipments)
- ML20204H728 + (Rev 2 to Procedure RDW 5.2, Shipment of Limited Quantities of Radioactive Matls)
- ML20204H776 + (Rev 2 to Procedure RDW 5.6, Marking & Labeling Requirements for Shipments of Radioactive Matl Packages)
- ML093431237 + (Rev 2 to Procedure RE-CS-012, Routine Chemistry Specs & Frequency)
- ML20083N900 + (Rev 2 to Procedure RTP-34, Contamination Radiation Monitoring - Post-Accident)
- ML20114B731 + (Rev 2 to Procedure RWS-0207, Radwaste Shipping Criteria)
- ML20147B149 + (Rev 2 to Procedure S1.OP-SO.CW-0001(Z), Circulating Water Pump Operation)
- ML20129F414 + (Rev 2 to Procedure SA-AP-ZZ-004(Q), Station Operations Review Committee)
- ML20074A503 + (Rev 2 to Procedure SOP-SG-2, Secondary Plant Chemistry Control)
- ML20210E829 + (Rev 2 to Procedure SP-505, Bisco Flexible Boots. Boot Clamp Chart Encl)
- ML20202A821 + (Rev 2 to Procedure STA-901, Personnel Screening Program. Related Info Encl)
- ML20138F718 + (Rev 2 to Procedure STS IC-275B, Analog Channel Operational Test Containment Purge Sys Radiation Monitor GTRE33)
- ML20151D155 + (Rev 2 to Procedure St-3-097-350-0, Annual Inventory of Snm)
- ML20151D147 + (Rev 2 to Procedure St-3-097-350-0, Annual Inventory of Snm)
- ML20129F716 + (Rev 2 to Procedure T-FND-90-15, Method Visual)
- ML20080P501 + (Rev 2 to Procedure TDR 406, Steam Generator Tube Rupture Procedure Guidelines)
- ML20151J105 + (Rev 2 to Procedure TDR 494, TMI-1,Post-Accident Sampling Radiological Analysis)