ML20140F134

From kanterella
Jump to navigation Jump to search
Rev 2 to Procedure QI-QP-11.4-23, Reinsp of Coated Steel Substrates for Which Documentation Is Missing or Discrepant
ML20140F134
Person / Time
Site: Comanche Peak  
Issue date: 12/17/1981
From: Cummings R, Scott B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20140F059 List:
References
FOIA-84-487 QI-QP-11.4-23, NUDOCS 8507080158
Download: ML20140F134 (6)


Text

r y

~~

G

-.~ --~ - -

1 W

7

~

~

'l INSTRUCTION l I

ISSUE l

I PAGc

' gTEXAS UT11.! TIES GENERATING CO.

NUMBER

. REVISION j CATE l

{

CPSES QI-QP-11.4-23 j 2

i i

i IDEC 1" 1981 1 of 6 l

c j

i PREPARED BY:

a

/2 'S 81,

4 REINSPECTION Or f

f

. 7

/

COATED STEEL SUBSTRATES r

~

M

! 'i FOR WHICH DOCUMENTATION APPROVED BY.

DATE '

IS MISSING OR DISCREPANT

/

APPROVED BY:

b

~

y:\\ q DATE

1.0 REFERENCES

6 i ? O'M' 6a D.

  • t 1-A Nanconfomance Report Numbe7s 'C-81-013f0 through C-81-01373 I

and C-81-01567

[-

i f 'L "

/

1-B CP-QP-18.0, I6spe'ation. Reports" W ty 1-C CCP-30, gjf[' eel Substrates Inside Reactor Buildings and,Radiat eas" 1-0 CCP-30A, " Coating Steel Substrates Inside ' Reactor Buildings and Radiation Areas" 1-E QI-QP-11.4-1,

" Inspection of Steel Substrate Surface

~

3!

V.

Preparation and Primer Application" 1-F QI-QP-11.4-5, " Inspection of Steel Substrate Primer Repair and Seal and Finish Coat Application and Repair" 2.0 GENERAL e

2.1 PURPOSE AND -SCOPE

\\

This instruction shall describe methods utilized by Quality Control in the measurement of the dry film thickness (DFT) 3 and adhesion to steel substrates of existing coating applica-tions described in Reference 1-A using the Mark II Tooke Gage and the E1cometer 106 Adhesion Tester respectively.

~

The above tests are destructive in nature which will necessitate a repair of the coating ' system at each spot test location.

3.0 INSTRUCTION For each area of 100 square feet or less of coated surface i

for which documentation is missing or discrepant the tests discussed in Paragraphs 3.1 and 3.2 and the visual inspection I

in Paragraph 3.3. shall be performed.

l

  • g.,

V 8507080158 850311 PDR FOIA HUGE 84-487 PDR

~

d WGCC CA

7_

.y

.y. _

-w..."--"

m -. u.w

- :-- e- - c= -" *

r.

h ih

~

~

.j

'j u

j INSTRUCTION ISSUE REVISION PAGE NUMBER DATE TEXAS UTILITIES GENERATING CC.

,@l CPSES gI_qp_11,4_23 2

I

}cy 2.,of 6 peg y 7 w

3.1 TOOKE TEST (SCRATCH TEST)

' The scratch test shall be perfomed by using a Mark II Tooke Inspection Gage using a 2X tip.

Each test made with the Tooke gage shall be compared *w a reading' of the total system obtained using a calibrated E1cometer Inspection DFT gage or equivalent.

The reading

?

obtained with the 2X tip of the Tooke gage shall not vary by more than 0.5 mils from the reading obtained with the Elcometer Inspection DFT gage. Any Tooke gage reading which is not within 20.5 mils of the corresponding DFT gage reading shall be discarded.

Five separate readings shall be taken for each 100 square feet area or less.

Dry film thickness shall be as follows:

Average ~

Any Sincle Readino of Five a

,s CZ 11 Primer 1.5 - 5.5 2.0 - 4.5

-G D6 1.5 - 5 1,

2.0 - 5.0 Total Coating System 7.0 - 11.5 7.0 - 11.0 In the event that any reading (s) is found to be outside of the acceptable primer thickness range, additional readings shall be taken to determine the extent of the unacceptable area.

Such additional testing shall be documented in the

" Remarks" section of Attac.*unent 1.

a NOTE 1:

Steel substrates identified in Reference 1-A on which only the primer coat has been applied (no seal or topcoat) shall be inspected ' for DFT per Reference 1-F.

However, these surfaces must still be inspected per Paragraph 3.2.

3.2 ADHESION (PATCH) TEST The OC inspector shall perfom an Adhesion (Patch) Test on each area of 100 square feet or less which is scratch tested per Paragraph 3.1.

A calibrated Elcometer 106 Adhesion Tester - shall be used to measure the tensile strength of adhesion of the coating system to the steel substrate.

Each test shall consist of three individual dollies tested to failure.

Rt TUGCC CA 4'

+

e se

._ _. i __...

-N

_g

.e w'

..F.

^

INSTRUCTION ISSUE REVISION PAGE TEXAS UTILITIES GENERATING CO.

CPSES lDEC 17 (j

QI-0P-11.4-23 2

tgg1 3 f6

+

Criteria:

The minimum acceptable strength per dolly shall be 200 psi.

For any dolly failing the minimum strength criteria, four additional dollies shall be adhesion tested at approximately one foot from the failing dolly and spaced radially at approximately 90 degree intervals.

If any of the additional A

four dollies should fail the minimum strength criteria, the test results shall be promptly reported to Civil Engineering for evaluation and resolution.

Test results on the four additicaal dollies shall be documented in the " Remarks" section of the IR.

NOTE 2:

In the case in which all four of the additional dollies pass the minimum strength criteria, test failures on any of the original three dollies shall still be documented as " unsatisfactory" on

]

the IR.

S 3.3 VISUAL 'EFECTS INSPECTION O

SS i

In addition to the tests in Para. 3.1 and 3.2 the Inspector shall perfonn a visual inspection of each area of 100 square feet or less in accordance with the following:

a)

Runs / sags - Runs or sags in which the DFT of the total coating system is 11.5 mils or less thick, which show no evidence of mudcracking, are acceptable. Those greater than 11.5 mils shall be repaired in accordance with Reference 1-C or 1-0.

4 b)

Skips / damaged areas / gross discontinuities such as holidays, voids, and bubbles are not acceptable.

c)

Pinholes acceptable to the extent allowed by d)

Contamination Embedded foreign materials f

unacceptable.

3.4 CONTINUITY INSPECTION d

The Inspector shall test the continuity of the coated. surface

~

of each 100 square foot area using a Tinker and Rasor Model M1 (67.5 volt) holiday detector.

1007, of the finish coated surface area shall be tested.

f:8 s

TUGCC CA

,[

..__[..._,,,,

,,, i_ ~

.l _,..., j.,.a.,.

~

,,.,,s..y,,,_,

n,$

fW@)

y' q.

9 w ~..

I~

INSTRUCTION ISSUE REVISION PAGE NUMBER DATE TEXAS UTILmES GENE.4ATING CO.,

O CPSES D

QI-QP-11.4-23 2

ggC17 E 4 of 6 i

The applied film snall contain only a minor number of points of discontinuity.

No more than two points of discontinuity sh'ould occur within an area having a radius of 6 inches as measured from a point of discontinuity (pinholes). No more than 40% of the total number of. allowable points of discontinuity should occur within any one area equal to 25% of the total area being coated.

The total number of pinhole discontinuities allowed is defined in Attachment 2.

No gross discontinuities are allowed.

NOTE 3:

The discontinuity inspection shall not be performed unless all results of. the inspections in Paragraphs 3.1 through 3.3 are detamined to be satisfactory 7

(i.e., no repairs are required).

3.5 DOCUMENTATION Results of inspections per Paragraphs 3.1 through 3.4 shall be documented on Inspection Report, ' Attachment 1,

in accordance with Reference 1-8.

The completed IR shall be

< O,.

forwarded to the PPRV for retention.

s.

4 3.5 REPAIRS Repairs of each coating area either scratch-tested or adhesion tested shall be perfomed in accordance with Reference 1-C or 1-D and reinspection of repaired coatings shall be in accordance with Reference 1-F.

i s

e 5

g.

3 e

I Tucco cA Pems NE 1 1

s,_

- ~ *

  • F y

~

....--a--s-1'-

l-p-

.Q

...t.~..

e, r.,.. p _,

i j

ISSUE u,

'.O "

INSTRUCTION REVISION PAGE NUMBER DATc TEXAS UTILITIES GENERATING CO.

CPSES l

)I-QP-ll.4-23 2

DEC 17 Y t

l

'S ATTACPfiENT 1 I

4 f

ConsaMCME NEAK STEAad C.ECTRIC STAT 10pt w

w INSPECTION REPCRT y

j mm ms e

. -.,,u r.se a PROTICUVE C3AT!'IG5 -

y giars.,rrwuca.su m.w I

wre.s.

=

,l ui.

,l01-4811.4-23.ilev.

g w gas wr. s e ee cc. a =uv. a e -m.o.

j As-31 0%we.

' CTaw."= Cm::'

Cho.

CT;g;.o.

asm mis C asciam comurgs, u usucastr trane sarwacrony C e c= u rus.u n==cru,im uarun' ao.

          • cra"

.e e

stum suL w

IM$PEC*1Cf6 aTTRISJTE3

." 1"'satt "w

1 1 PtM C:ATO SEAL GR FLMI5H COATO i

i i

I i 1 I i

l 1

1 ****tm Toene test see pers. 3.1 to determine t.'ticaness t ii i

t of prismar and total systaur.

t e

i i REC:;110: Statem Scot Test Primer:

l l l g

I pantaus Soct Test primer:

I ei i

l i

Averew soot Test 7*tswe:

1 I I e

i Minimm Soot Test Total System:

l l l l

i s*

i Pantsus soot Test Total Systas:

l l I

Average Saot Test Total System:

t )

i l

I

?

i i t 6

2. I 8e**em Aeesten test see Pers. 3.2 l l l l

l erm; se,ste. res; se 7,,3 in,,,,

j jg i

i Dolly 81:

Soliy et:

colly #3:

l l :

I i i I 8

3. 4 Ytsual taspection oer pera. 3.3 6 i i i

i n.

Lence *-ee ed %dmm.

I I I I

t t

l I I i l

im e..,*ne,

  • -,e ed sede**.s sad v45ue11, acresta5fe.

3 i I i

I I l i t

4. t Perdam continuity inspection cer Para. 3.4 (only if I l l l

I all items aeove e m tatisfee ory.1

! e i a

i l i 1

m eones, specs.tru 1lL4.CLOSE3 C

ismfwa t8'M 8

oc =s,te?:n e

s TUGCC CA s nn % 1 o

f

.. w % = ---

...~3 ~ 3 = u -w..

' ~

. :..a=

,c.-

..
d.,w ia:=.:--

O 3

m;,

---, -C h

~'

/j

~

'I INSTRUCTION I

REVISION PAGE NUMBER

.'i TEXAS UTILITIES GENERATING CO.

CPSES s

W

.g

. ggg 17 6~of 6 s.s.

GI-4P-T1.4-23 4

q ATTACHMENT 2

i TOTAL NtNBER OF ALLOWABLE POINTS OF OISCONTINUITY SURFACE AREA COND. 'C"

~

SEING COATED COMMERCIALLY (SO. FT.I CONTINUOUS

-+

10 5

10-50 I

10 50-100 20

~

' - sis 100-500 30 500-1000 50

'.~

d.

1000-5000 75 4

Gross Discontinuities - None Allowed.

1 4

F "6

i

's s

.a 5

,.s e yk &

"a?

1, TUGCC CA menn No.1 4

"