Rev 2 to Procedure Qqap 16, Corrective ActionML20211C895 |
Person / Time |
---|
Site: |
Fermi ![DTE Energy icon.png](/w/images/5/5b/DTE_Energy_icon.png) |
---|
Issue date: |
09/07/1984 |
---|
From: |
Jens W DETROIT EDISON CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20211C861 |
List: |
---|
References |
---|
FOIA-86-370, FOIA-86-A-147 QQAP-16, NUDOCS 8610220049 |
Download: ML20211C895 (2) |
|
Similar Documents at Fermi |
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20212H4351999-09-24024 September 1999 Proposed Tech Specs Re Util Request for Enforcement Discretion with Respect to TS 3/4.6.1.8 Re Drywell & Suppression Chamber Purge Sys ML20212H2861999-09-24024 September 1999 Proposed Tech Specs 3/4.6.1.8,allowing Continued Operation Until Next Plant Shutdown at Which Time Valve T4803F601 Will Be Repaired ML20211Q1841999-09-10010 September 1999 Proposed Tech Specs Revising SRs & Bases for Div I Battery Sys to Agree with Design of New Battery Replacement ML20211Q7351999-09-0303 September 1999 Proposed Its,Rev 15 ML20211G0921999-08-25025 August 1999 Rev 14 Proposed ITS Pages,Providing Update for Remaining Open Issues Associated with NRC Review of ITS Submittal ML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20211B9991999-08-0606 August 1999 Proposed Its,Rev 13 ML20210N0231999-08-0404 August 1999 Rev 12 to 980403 ITS Submittal,Providing Update to Submittal for ITS Sction 3.3,including Changes Associated with NRC Review of Rev 6 to ITS Submittal ML20210J1641999-07-30030 July 1999 Draft Proposed Tech Spec Pages Re Amend to License NPF-43 to Include Provisions for Enabling Oscillation Power Range Monitor (OPRM) Upscale Function in Average Power Range Monitor (APRM) ML20216D6091999-07-26026 July 1999 Rev 11 to ITS Submittal,Dtd 980403,providing Update to ITS Sections 3.5,3.6 & 3.8 ML20209H0331999-07-13013 July 1999 Rev 10 to ITS Submittal,Dtd 980403,providing Update to ITS Submittal for ITS Section 3.4,RCS ML20209D4001999-07-0707 July 1999 Rev 9 to Fermi 2 ITS Submittal Dtd 980403,providing Update for Sections 3.0,4.0 & 5.0 ML20196K1681999-07-0101 July 1999 Rev 8 to ITS Submittal Dtd 980403,providing Update to ITS Submittal for ITS Section 3.7 ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20196F4681999-06-24024 June 1999 Rev 7 to ITS Submittal of 980403 to Provide Remaining Responses to NRC RAIs Re ITS Sections 3.5 & 3.8 ML20212H5041999-06-0202 June 1999 Proposed Tech Specs Pages to Rev 6 of Fermi Unit 2 ITS ML20206M1121999-05-0707 May 1999 Proposed Tech Specs Section 3.6,converting to ITS ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20206H5521999-04-30030 April 1999 Proposed Rev 5 to Improved TS Pages ML20205T5361999-04-20020 April 1999 Marked-up & Typed Up Revised TS Pages Eliminating TS SR for Nitrogen Cover Gas on Nearly Empty Primary Sodium Storage Tanks in Sodium Bldg Complex ML20196K6621999-04-0202 April 1999 Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal ML20205A3201999-03-23023 March 1999 Proposed Tech Specs SR 4.4.1.1.1,requiring Each Recirculation Pump Discharge Valve Be Demonstrated Operable at Least Every 18 Months & Deleting Footnote That Applies to TS 4.4.1.1.1 & Stating *Not Used ML20202D9551999-01-26026 January 1999 Rev 2 to Fermi 2 Its,Incorporating Operating License Amends 119,122,128 & 129,issued Since Initial ITS Submittal Was Finalized ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20155A7111998-10-22022 October 1998 Proposed Replacement TS Sections F.1.a & F.2.b Pages, Utilizing Terminology of TEDE Instead of Whole Body & Organ Dose ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20154E5621998-09-28028 September 1998 Revised Proposed Tech Specs Pages Re 980403 Application for Amend to License NPF-43 for Conversion of TS to Improved Standard TS ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237E8981998-08-26026 August 1998 Proposed Tech Specs Implementing Provisions of 1996 Decommissioning Rule,Including Requirements for Control of Effluents,Dose Limits,& Annual Reporting of 10CFR50.36a ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236W4701998-07-31031 July 1998 Proposed Tech Specs 3.5.1 & 3.5.2 Re Footnote for Limiting Condition for Operation ML20236U4601998-07-23023 July 1998 Proposed Tech Specs Revising Table 4.0.2-1 to Include Two Functional Units for TS 4.3.1.3 (RPS Response Time Testing) & Allowing one-time Extension of Respective Surveillance Intervals ML20236U0421998-07-16016 July 1998 TS Insert Page & Associated Index Page Reflecting Withdrawal of Request for Extension of Surveillance Interval for TS 4.0.5,as Contained in Enclosure 20 of & Administrative Change ML20236F0671998-06-26026 June 1998 Proposed Tech Specs Allowing one-time Extension of Surveillance Intervals to Delay Shutdown for Upcoming Sixth Refueling Outage (RFO6) Until 980904 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248L8021998-06-0505 June 1998 Proposed Tech Specs Section 2.1.2,re Thermal Pressure,High Pressure & High Flow ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20248E4151998-05-28028 May 1998 Proposed Tech Specs Page 3/4 5-1,revised to Include Remaining Proposed Changes W/Applicability Restored to Reflect Original Notation Re Realignment of LPCI Sys ML20247Q1191998-05-20020 May 1998 Proposed Tech Specs Pages Revising TS 3.1.3.1,Action D to Apply to Valves Inoperable for Any Reason & Increase Time Allowed for Restoring SDV Vent or Drain Line W/One Valve Inoperable from Current 24 Hours to 7 Days ML20247A7401998-04-27027 April 1998 Proposed Tech Specs Pages,Adding Configuration Risk Mgt Program to TS Section 6.8.5 ML20216F6971998-04-0909 April 1998 Proposed Tech Specs,Withdrawing Previously Submitted Response Time Testing Requirement Clarification Re Neutron Monitoring Sys ML20216J7581998-04-0909 April 1998 Proposed Tech Specs 3.3.7.5,3.7.1.2 & 3.8.1.1 Re Alignment of Shutdown Action Statements for Primary Containment Oxygen Monitoring Instrumentation ML20216B3311998-04-0303 April 1998 Proposed Tech Specs,Extending EDG Allowed Times at Plant ML20217P5691998-04-0202 April 1998 Proposed Tech Specs Changing Requirements Associated W/ Containment Oxygen & Hydrogen Monitors ML20217P0631998-04-0202 April 1998 Proposed Tech Specs Re Mod of Drywell Oxygen Monitoring Instrumentation Action Requirements to Be Consistent W/Those Contained in NUREG-1433 Rev 1, Std Tech Specs GE Plants BWR/4 ML20217J5841998-03-27027 March 1998 Proposed Tech Specs Revising Footnote Specifying Conditions Where Isolation Valves Associated W/Lpci Sys Operation Are Repositioned 1999-09-03
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211B9861999-08-13013 August 1999 Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval ML20211C2631999-08-13013 August 1999 Rev 2,change 0 to ISI-Nondestructive Exam (ISE-NDE) Program (Plan) for Fermi 2 Power Plant, for Second ten-year Interval ML20210A3031999-06-30030 June 1999 Rev 14 to Fermi 2 Security Personnel Training & Qualification Plan ML20206M8651999-05-0606 May 1999 Rev 30,Vol I to Technical Requirements Manual ML20198D1391998-12-14014 December 1998 Rev 28 to Vol 1 of Technical Requirements Manual ML20198B8121998-12-10010 December 1998 Rev 27 to Fermi 2 Technical Requirements Manual,Vol I ML20154Q0771998-10-15015 October 1998 6 to Fermi 2, Technical Requirements Manual, Vol I ML20154M4611998-10-0909 October 1998 5 to Vol 1 of Fermi 2 Technical Requirements Manual ML20154H8931998-10-0808 October 1998 Rev 24 to Fermi 2 Technical Requirements Manual,Vol I ML20153F3931998-09-23023 September 1998 Rev 23 to Fermi 2 Technical Requirements Manual,Vol 1 ML20237D6311998-08-18018 August 1998 Rev 22 to Fermi 2 Technical Requirements Manual,Vol 1 ML20236P9241998-06-10010 June 1998 Rev 20 to Fermi 2 Technical Requirements Manual, Vol 1 ML20248H0901998-05-31031 May 1998 Vol 1,Rev 19 to Technical Requirements Manual for Fermi 2 ML20247A6511997-12-0808 December 1997 Rev 11 to Odcm ML20248J5391997-06-0909 June 1997 Rev 0 to MWC02, Fermi 2 Work Control Conduct Manual ML20217H6671996-12-22022 December 1996 Rev 0 to DE Fermi 2 Work Management Guidelines ML20129J0381996-07-15015 July 1996 Rev 3,Change 11 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20100B8831996-01-24024 January 1996 Self-Assessment Plan SWS Operational Performance Insp (Swsopi) ML20086L4591995-07-0505 July 1995 Change 9 to Rev 3 to IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20149H8631994-12-20020 December 1994 Rev 3,Change 8 to ISI-IST Program, IST Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20029E4371994-01-14014 January 1994 Recovery Plan. ML20044E0251993-05-0707 May 1993 Rev 5 to Performance Evaluation Procedure 47.306.02, Votes Sys Operating Procedure. ML20098A2931992-12-31031 December 1992 1992 Performance Mgt Program Work Plan ML20101H3801992-02-17017 February 1992 Rev 3,Change 1 to ISI-IST Program, IST Program Plan for Pumps & Valves for Fermi 2 Power Plant ML20101H3881992-02-0505 February 1992 Rev 1,Change 1 to ISI-NDE Program, ISI-NDE Program Plan for Fermi 2 Power Plant ML20098A2911991-12-31031 December 1991 Work Plan & Performance Appraisal for a & M-Grade Employees ML20086G1351991-11-26026 November 1991 Draft ODCM 0.0 ML20090A5601991-11-13013 November 1991 Rev 14 to Process Control Program ML20077C9221991-05-30030 May 1991 Rev 0 to TS Interpretation Manual, TS Interpretation 3.5.E.1 & 2-1 ML20066C1031990-12-0707 December 1990 Change 0 of Rev 1 to Inservice Insp - NDE Program for Fermi 2 Power Plant ML20062H9081990-11-13013 November 1990 Rev 3 to Inservice Testing Program (Plan) for Pumps & Valves for Fermi 2 Power Plant ML20065K2891990-10-30030 October 1990 Rev 5 to Regulatory Affairs Administrative Procedure RAP-EM1-04, Drills & Exercise ML20245H0371989-04-21021 April 1989 Revised Radiological Emergency Response Preparedness Procedures,Including Rev 5 to EP-402, Responsibilities of Recovery Organization & Rev 3 to RAP-EM1-04, Drills & Exercise ML20244B0611989-01-18018 January 1989 Rev 2 to Odcm ML20238C1921987-08-31031 August 1987 Exercise Manual:Fermex 87 Aug 1987 ML20238A3541987-08-18018 August 1987 Exercise Manual Fermex 87 ML20204F2851987-03-0909 March 1987 Rev 23 to Pom 12.000.015 (Sr), Work Requests ML20204F7621987-03-0909 March 1987 Rev 14 to Pom 12.000.012, Tagging & Protective Barrier Sys ML20204F9741987-03-0404 March 1987 Rev 1 to 11.000.107, Requisitioning Process for Items & Svcs ML20204F6601987-02-0404 February 1987 Rev 0 to Pom 12.000.022, Performance Evaluation Program ML20205T7371987-01-31031 January 1987 Rev 0 to Change 2 to Inservice Insp-Nondestructive Exam (ISI-NDE) Program (Plan) ML20204F5511987-01-12012 January 1987 Rev 5 to Pom 38.000.09, New Cable Terminations ML20204F5991987-01-0606 January 1987 Rev 4 to Pom 44.220.102, Jet Pump Instrument Lines Excess Flow Check Valves Functional Test ML20204F7291987-01-0202 January 1987 Rev 3 to Pom 35.000.075, Mechanical Snubber Maint ML20204F3811986-11-0404 November 1986 Rev 20 to Pom 12.000.007, Plant Operations Manual Procedures ML20211C8661986-10-0909 October 1986 Rev 1 to Procedure 11.000.52, Deviation & Corrective Action Reporting ML20204F3281986-09-15015 September 1986 Rev 0 to MI-M402, Guidelines for Determining Component- Level Testing Requirements ML20204F4901986-09-0404 September 1986 Rev 6 to Pom 44.010.72, Reactor Protection Sys - Scram Discharge Vol High Water Level,Div Ii,Channel B1,Functional Test;C11-N601B ML20204F4021986-07-31031 July 1986 Draft Rev 0 to, Procedures Generation Package ML20204G0191986-07-26026 July 1986 Rev 5 to Pom 12.000.17, Preventive Maint Program. Related Info Encl 1999-08-13
[Table view] |
Text
u u
. .. U " "F ' *
$'. OQAP 16 Enrico Fermi Atom c Power Plant Unit ? v Detroit OperationalQuality Assurance _
D2 i Edison .__
Policies w 2
CORRECTIVE ACTION .
5:P 1019a4
- 1. POLICY Measures shall be established to assure that conditions adverse to quality shall be identified promptly and corrected as soon as practi-cal and, in the case of significant conditions adverse to quality, the cause of the condition shall be determined and corrective action taken to preclude recurrence.
- 2. RESPONS1BILITIES 2.1 Personnel who discover a condition adverse to quality shall promptly notify their supervisor and/or the Nuclear QA Organization.
2.2 Supervisors who are aware of a condition adverse to quality shall take the actions prescribed by established procedures for report-ing and correcting of the condition.
2.3 When a significant condition adverse to quality is identified, NQA personnel shall review, approve, and participate to the extent necessary to determine the cause of the condition and the corrective action required to preclude recurrence.
- 3. DEFINITION Conditions adverse to quality inclu1, feitures, as1 functions, defici-encies, deviations, defective material and equipment, abnormal occur-rences and nonconformances. - -- -
ARMS - INF0F" .. in tia';
CONTROLLED ote....r/#4 m
( , . 'c
- 4. REFERENCES Dsh OQCf ,
H.GL ,
4.1 10CTR26 - Reporting of Def ects and Noncompliance .,s, SEr14 ..
4.2 10CFR50, Appendix B, Criterion IVI - Corrective Ac' . fgo,g 4.3 10CPR50 55(e) - Conditions of Construction Permits (ke'ficiency Reporting) _ _ _ _ . - _
4.4 10CFR50.72 - Ic. mediate Notification Eequirementa for Opera g& dh Nuclear Power Plants 9 4.5 10CFR50.73 - Licensee Event Report System S
8610220049 861009 P.14 ,
s TE A-147 PDR av g re ,,
AD/1/16.1 _
091184 8% ..
~
,. s. ;,
- 00AP 16 Enr.co Fortru Atorv c Power Pent Unit ? ser Detroll Operational Quality Assurance " .
2 o2 Edison Policies _ . . _ _ _ _ _ . _ _ _ _ _.
3, ,
2 CORRECTIVE ACTION
_. . . _ .$[' 10 jgg4 __
4.6 Regulatory Guide 1.33 (2/1978, Rev. 2), Quality Assurance Program Requirements (Operation) 5.0 REQUIREMENTS 5.1 Procedures shall be established that prescribe how conditions a d verse to quality are to be promptly reported, documented, and ,
c or rec t ed .
5.2 Each reported condition adverse to quality shall be reviewed for its safety inp11 cations and if significant, sub:itted to NSRC f or r e vi ew.
5.3 Trend analysis shall be used as a method for early identification of a condition adverse to quality.
5.4 Uhen the condition is significant or it is a recurring problem, the cause of the condition shall be deterrained and the appropri-ate corrective action taken to preclude recurrence. The cause and corrective action shall be reviewed by NQA.
5.5 The identification of the significant condition adverse to quality, the cause of the condition, and the corrective action taken shall be documented and reported to responsible management.
5.6 Procedures shall be established for the review of reported conditions adverse to quality for reportability to the NRC.
5.7 To provide a means for the reporting of quality concerns by per-s onnel who choose to be anonymous, procedures shall be estab-21shed to permit reporting of the quality concerns and to assure timely response.
5.8 Procedures shall be established for the corrective action required f or Vendor Supplied Products which do not conf orm to requirements.
, ./ / .
APPROVAL: /.
perations
~~
DATE
~/ '/~~~
k Vice' Presipnt - Nuclea( C V
AD/1/16.1 082584