Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20081J852 + (Rev 12 to Planning Schedule)
- ML19325F247 + (Rev 12 to Plant Safety Verification Procedure VP-580)
- ML20212N984 + (Rev 12 to Preventative Maint Procedure PM-105, Insulation Resistance,Control Circuits,High Potential Testing,Insp, Cleaning & Drying Windings of Electric Motors)
- ML20212P021 + (Rev 12 to Preventative Maint Procedure PM-101, 4.16 Kv & 6.9 Kv Switchgear)
- ML20127B533 + (Rev 12 to Procedure 05-1-02-VI-2,Hurricanes,Tornados & Severe Weather)
- ML20126H646 + (Rev 12 to Procedure 1-18-4, Spent Resin Storage & Processing)
- ML20087G186 + (Rev 12 to Procedure 1617.098, Orion Model 1610 Boron/Ph Analyzer Site Acceptance Test. W/840314 Transmittal Ltr)
- ML20079K537 + (Rev 12 to Procedure 1904.007, Protective Action Recommendations)
- ML20100J340 + (Rev 12 to Procedure 23.307.01, Emergency Diesel Generators)
- ML20092G081 + (Rev 12 to Procedure 24614-1, Safety Features Sequencer Train B Analog Channel Operational Test & Channel Calibr. Supporting Documentation Encl)
- ML19325E358 + (Rev 12 to Procedure AP-770, Emergency Diesel Generator Actuation)
- ML20005F757 + (Rev 12 to Procedure AR-403, PSA H Annunciator Response)
- ML20107C393 + (Rev 12 to Procedure CCP-30, Coating Steel Substrates Inside Reactor Bldg & Radiation Areas)
- ML20211K048 + (Rev 12 to Procedure CP-QP-16.0, Nonconformances)
- ML20137H688 + (Rev 12 to Procedure QI-QP-11.0-2, Insp of Pressure Grouted Base Plates & Equipment Bases)
- ML20140F069 + (Rev 12 to Procedure QI-QP-11.4-23, Reinsp of Seal-Coated & Finish-Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
- ML20024H241 + (Rev 12 to Pump & Valve Inservice Testing Program)
- ML20245G303 + (Rev 12 to Pump & Valve Inservice Testing Program)
- ML20055H296 + (Rev 12 to QA Manual Operations)
- ML20133K828 + (Rev 12 to QA Program Description)
- ML20237E270 + (Rev 12 to QA Program Description)
- ML17309A390 + (Rev 12 to QA Program for Station Operation)
- ML20210J775 + (Rev 12 to QA-AD-001, QA Program)
- ML20207H329 + (Rev 12 to Reg Guide 1.147, Inservice Insp Code Case Acceptability,Asme Section Xi,Div 1)
- ML20046C142 + (Rev 12 to Response to Loss of Secondary Heat Sink)
- ML20137R202 + (Rev 12 to SG Progress Rept)
- ML13326A228 + (Rev 12 to SONGS Unit 1 Odcm)
- ML18096A143 + (Rev 12 to Salem Generating Station Event Classification Guide)
- ML20064H910 + (Rev 12 to Section 4.0 of IST Program Plan for Valves)
- ML20133M991 + (Rev 12 to Seismic Category I Piping Sys Support & Hanger Discrepancies,Summary Rept)
- ML20136B385 + (Rev 12 to Startup Administrative Procedure CP-SAP-3, Custody Transfer of Station Components)
- ML20206T817 + (Rev 12 to Surveillance Procedure 6.3.10.2, Instrument Line Flow Check Valve Test)
- ML20206T921 + (Rev 12 to Surveillance Procedure 6.3.16.2, Reactor Equipment Cooling Motor Operated Valve Operability Test)
- ML20210F001 + (Rev 12 to TNE-AD-4, Control of Engineering Documents)
- ML20056C789 + (Rev 12 to Technical Requirements Manual)
- ML20113G332 + (Rev 12 to Temporary Change Procedure VEGP-13001-1-12-90-1, RCS Filling & Venting)
- ML20137N314 + (Rev 12 to Tqr 3.0 Topical Quality Assurance Rept, Design Control)
- ML20140H017 + (Rev 12 to Training Courses Trcr 86.0, Administrative)
- ML20148H088 + (Rev 12 to Umtra Project Remedial Action Contractor Health Physics Procedures)
- ML20072T683 + (Rev 12 to Unit 2 Pump & Valve Inservice Testing Program)
- ML20113G385 + (Rev 12 to VEGP-13001-1, RCS Filling & Venting. Supporting Documentation & One Oversize Drawing Encl)
- ML20127C116 + (Rev 12 to Work Plan Procedure/Qa Instruction 202, Welding Control for Asw D1.1 Welding)
- ML20198G638 + (Rev 12 to Ynps Off-Site Dose Calculation Manual)
- ML20248E488 + (Rev 12 to, Tech Spec for Furnishing,Fabricating & Delivering Reactor Bldg Liner Plate for Snupps)
- ML17354A537 + (Rev 12,Draft B of Topical QA Rept, Design Control (RR913))
- ML17354A543 + (Rev 12,Draft a of Topical QA Rept, Control of Special Processes)
- ML20067A326 + (Rev 12,Issue 1 to Beaver Valley Unit 2 IST Program for Pumps & Valves)
- ML20137S734 + (Rev 12A to Pilgrim Nuclear Power Station COLR (Cycle 12))
- ML20085L021 + (Rev 12A,Issue 2 to Duquesne Light Co Beaver Valley Power Station Unit 1 IST Program for Pumps & Valves)
- ML20236U820 + (Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12))
- ML20197C547 + (Rev 12C to Pilgrim Nuclear Power Station Colr)