Rev 12 to Surveillance Procedure 6.3.16.2, Reactor Equipment Cooling Motor Operated Valve Operability Test
ML20206T921
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/16/1986
From: Brungardt R, Jay Collins
NEBRASKA PUBLIC POWER DISTRICT
To:
Shared Package
ML20206T643 List:
References
6.3.16.2, TAC-54682, NUDOCS 8607080256
Download: ML20206T921 (6)


Text

COOPER NUCLEAR STATION OPERATIONS MANUAL S VEILLANCE PROCEDURE 6.3.16.2 REC MOTOR OPERATED VALVE OPERABILITY TEST I.

PURPOSE A.

To provide a detailed instruction for station personnel to test oper-ability of motor operated valves of the reactor equipment coofing (REC) system.

II.

DISCUSSION A.

This procedure covers the operation necessary to assure proper operation of motor operated valves of the REC system.

It is written to operate all valves locally in order to bypass the interlocks between the valves.

III. REFERENCE MATERIAL A.

USAR.

1.

Volume IV,Section X, Subsection 6.0.

B.

Flow Diagrams.

)

1.

B & R Drawing 2031, RBCCW System, Sheets 1, 2, and 3.

C.

Vendor Manuals.

1.

Fairbanks Morse 68-63-6, REC System Pump and Motor.

D.

Electrical Diagrams.

1.

B & R Drawing 3006, Auxiliary One Line Diagram.

2.

B & R Drawing 3010, Vital One Line Diagram.

3.

B & R Drawing 3037, Control Elementary Diagram.

4.

B & R Drawing 3045, Control Elementary Diagram.

E.

System Operating Procedure 2.2.65, REC System.

IV.

PREREQUISITES A.

Obtain permission and signature from the Shift Supervisor before starting the test.

V.

LIMITATIONS A.

Surveillance Requirements - Technical Specifications Section 4.12.B.I.b.

1.

Check motor operated valve operability monthly.

.m 88871888a8t8oj!;e P

R2 Vised By/Date Reviewed By/Date Approv d By/Date Rev Procedure Page 1 Of J. Collins 12/24/85 R. Brungardt 1/14/86

/--4-8L 12 6.3.16.2 4

Pages

a__,

i t.

B.

Administrative Limits.

1.

All discrepancies shall be recorded in the Shift Supervisor's log.

2.

Attachment "A" shall be used to record the test and filed as part of the station records.

3.

All testing shall be coordinated with the Control Room Operator.

VI.

PRECAUTIONS A.

Ensure that no other testing is in progress prior to performing valve operability tests.

B.

Ensure that the REC system is returned to normal lineup per System Operating Procedure 2.2.65 at the completion of this test.

C.

Ensure that an Operator is present in Augmented Radwaste when closing REC-1329MV.

VII. TEST EQUIPMENT A.

None.

VII

I. PROCEDURE

Note: All steps must be completed for monthly test. Only

  • steps need be completed to prove operability for a system component being inop.

A.

Operate REC Valve From The Control Room As Follows.

  • 1.

Open REC-711MV (south critical loop supply) and verify position.

  • 2.

Close REC-711MV (south critical loop supply) and verify position.

  • 3.

Open REC-714MV (north critical loop supply) and verify position.

  • 4.

Close REC-714MV (north critical loop supply) and verify position.

Caution: When performing the test with one REC pump inoperable, do not secure the third REC pump. Maintain three pumps in service while cycling REC-721MV or REC-722MV to avoid having only two pumps in service and momentarily only one pump in service while REC-721MV or REC-722MV is closed.

  • S.

Make sure REC pumps C and D are running and only one pump on the A and B side is running, then close REC-721MV (non-critical return) and verify position.

  • 6.

Open REC-721MV (non-critical return) and verify position.

  • rocIdure Number 6.3.16.2 Date

/-//o f/,

Revision 12 Page 2

Of 4

Pages 2

g

  • 7.

Make sure REC pumps A and B are running and only one pump on the C and D side is running, then close REC-722MV (non-critical return) and verify position.

  • 8.

Open REC-722MV (non-critical return) and verify position.

9.

Close REC-712MV (Hx 1B supply) and verify position.

10.

Open REC-712MV (Hx IB supply) and verify position.

11. Close REC-713MV (Hx 1A supply) and verify position.

12.

Open REC-713MV (Hx 1A supply) and verify position.

e

  • 13.

Open the breaker for REC-MO-694MV (MCC-R), REC-MO-721MV (MCC-Q),

and REC-MO-722MV (MCC-Y).

  • 14.

Close REC-695MV (critical loop supply crossover) and verify position.

  • 15.

Open REC-695MV (critical loop supply crossover) and verify position.

  • 16.

Close the breakers opened in Step 13.

  • 17.

Close REC-694MV (critical loop supply crossover) and verify position.

  • 18.

Open REC-694MV (critical loop supply crossover) and verify position.

  • 19.

Close REC-700MV (non-critical loop supply) and verify position.

  • 20.

Immediately reopen REC-700MV (non-critical loop supply) and verify position.

21.

Open the breaker for REC-MO-709MV (MCC-R).

22.

Close REC-702MV (drywell supply isolation) and verify position.

23.

Drywell fan coil units water outlet flow low annunciators 6-1, 6-2, 6-3, and 6-4 annunciate on Bd-M and recirculation pump seal cooling water flow low annunciators 3-1 and 1-4 annunciate on Bd 9-4-3.

24.

Immediately reopen REC-702MV and verify position.

25.

Drywell fan coil units water outlet flow low annunciators clear and

. recirculation pump seal cooling water flow low annunciators clear.

26.

Close the breaker for REC-M0-709MV (MCC-R) and open the breaker for.

REC-M0-702MV (MCC-R).

27.

Close REC-709MV (dryvell return isolation) and verify position.

28.

Immediately reopen REC-709MV (drywell return isolation) and verify position.

Procsdure Number 6.3.16.2 Date

/-//o.96 Revision 12 Page 3

Of 4

Pages

29.

Close the breaker for REC-MO-702MV (MCC-R).

  • 30.

Close REC-1329MV (supply to augmented radwaste) and verify position.

  • 31.

Immediately reopen REC-1329MV (supply to augmented radwaste) and verify position.

  • 32.

Insure that the REC system is returned to normal status or to the AS FOUND condition.

IX.

ATTACHMENTS A.

REC Motor Operated Valve Operability Test Data Sheets.

~

'l Proc: dure Number 6.3.16.2 Date

e. / t,.fy; Revision 12 Page 4

Of 4

Pages m.

COOPER NUCLEAR STATION OPERATIONS MANUAL

_ATTACllMENT "A" SURVEILLANCE PROCEDURE 6.3.16.2 REC MOTOR OPERATED VALVE OPERABILITY TEST PROCEDURE DATA CHECK A.

Operate REC Valve From Control Room As Follcws.

XXXXXXXXXX

  • 1.

Opened REC-711MV and verified position.

  • 2.

Closed REC-711MV and verified position.

  • 3.

Opened REC-714MV and verified position.

  • 4.

Closed REC-714MV and verified position.

  • 5.

Made sure REC pumps C and D are running and only one pump XXXXXXXnX on the A and B side is running, then closed REC-721MV XXXXXXXXXX and verified position.

  • 6.

Opened REC-721MV and verified position. -

  • 7.

Made sure REC pumps A and B are running and only one pump XXXnXnXX on the C and D side is running, then closed REC-722MV XXXXXXXXXX 4

and verified position.

  • 8.

Opened REC-722MV and verified position.

9.

Closed REC-712MV and verified position.

10.

Opened REC-712MV and verified position.

11.

Closed REC-713MV and verified position.

12.

Opened REC-713MV and verified position.

  • 13.

Opened breaker for REC-MO-694MV (MCC-R), REC-MO-721MV -

XXXXXXnXX (MCC-Q), and REC-MO-722MV (MCC-Y),

  • 14.

Closed REC-695MV and verified position.

  • 15.

Opened REC-695MV and verified position.

16.

Closed breakers opened in Step 13.

  • 17.

Closed REC-694MV and verified position.

  • 18.

Opened REC-694MV and verified position.

  • 19.

Closed REC-700MV and verified position.

  • 20.

Reopened REC-700MV and verified position.

i 21.

Opened breaker for REC-MO-709MV (MCC-R).

22.

Closed REC-702MV and verified position.

23.

Verified drywell fan coil units water outlet flow low XXXXXXXXXX annunciators 6-1, 6-2, 6-3, and 6-4 annunciated on Bd-M XXXXXXXXXX and recirculation pump seal cooling water flow low XYYYXYYYYY annunciators 3-1 and 1-4 annunciated on Bd 9-4-3.

24.

Reopened REC-702MV and verified position.

25.

Verified drywell fan coil units water outlet flow low XXXXXXXXXX annunciators cleared and recirculation pump seal cooling XXXXXXXXX_X water flow low annunciators cleared.

26.

Closed breaker for REC-MO-709MV (MCC-R) and opened breaker XXXXXXXXXX-for REC-M0-702 (MCC-R).

27.

Closed REC-709MV and verified position. -

28.

Reopened REC-709MV and verified position.

29.

Closed breaker for REC-MO-702MV (MCC-R).

  • 30.

Closed REC-132)MV and verified position. ---

  • 31.

Reopen REC-1329MV and verified position.

  • 32.

Insured that REC system is returned to normal status or to XXXXYYYYXX AS FOUND condition.

\\

Procsdure Number 6.3.16.2 Date

/-/4./ /,,

Revision 12 Page 1

Of 2

Pages !

l l

LUUrEn NUULEAK b1A110N UPEMA110N3 ruuluiti.

AT.T'ACIIMENT "A" SURVEILI.ANCE PROCEDURE 6.3.16.2 REC MOTOR OPERATED VALVE OPERABILITY TEST Discrepancies:

Operator

/

Date Shift Supervisor

/

Permission To Start Date Shift Supervisor

/

Test Complete And Reviewed Date Shift Supervisor

-/

NCR Written If Required Date Work Item (s) Initiated If Required '

Rsviewed By

/

Date Prcesdure Number 6.3.16.2 Date

/. / 4 -f4 Revision 12 Page 2

Of 2'

Pages

.