Rev 12 to Procedure AP-770, Emergency Diesel Generator Actuation
ML19325E358
Person / Time
Site: Crystal River 
Issue date: 10/18/1989
From:
FLORIDA POWER CORP.
To:
References
AP-770, NUDOCS 8911060328
Download: ML19325E358 (20)


Text

y E

en c

I t

DOCUMENT TRANSMITTAL FORM 17846 t

l FOR DOCUMENTS TRANSMITTED TO DC DESK (NRC)*

e DATE: 19 OCT 1989 BATCH:

167 I

DOCUMENT NUMBER BHEET NUMBER REVISION NUMBER COPY NUMBER l

v AP 770 12 7

INSTRUCTIONS TO THE ADDRESEEE COMPLETE EACH OF THE INSTRUCTIONS BELOW WHICH ARE MARKED WITH AN " X" I

(1) VERIFY THE DOCUMENTS RECEIVED AOREE WITH THE ABOVE DESCRIPTION (2) IMCORPORATE THE TR ANSMITTED DOCUMENTS INTO YOUR FILES f

(3) *EJTROY DOCUMENTS OR PORTIONS OF DOCUMENTS SUPERSEDED BY THE ABOVE (4).SIAN AND DATE IN THE SPACES BELOW INDICATING THAT YOU COMPLETED l

THEBE INS 1 RUCTIONS.

($) SIGN BELOW INDICATING THA1 YOU HAVE READ AND UNDERSTOOD THE

[

CHANGES AS IDENTIF I ED f

(6) RETURN TO DOCUMENT CONTROL, CRYSTAL RIVER UNIT 3, MAC#

NA1C i

NR2 FLA. POKER CORP.,

P. O.

BOX 219 CRYSTAL RIVER FLA, 32629 i

e SIGNATURE OF ADDRESSEE DATE 1

INDEPENDENT VERIFICATION DATE __

(OP S) 1 1

t L

I 8911060326 891018 r

PDR ADOCK 05000302 PDC p

1 1

l

!\\

a i

d EDGA REV 12 DATE 10/10/89 AP-770 f

Nj

(

.)

j

.)

j

.l l

ENERGENCY DIESEL GENERA'IOR AC5UATION I

1.0 ENTRY CONDITIONS I

i i

17,4160V ES Bus undervoltage occurs, f

THEN use this procedure..

i

-m rammamena

$'$e~nIscetton

([

555" gronM ATION ONL I

Ii

c. R, tauciar

,, - - ~, - -

i i

i

^

r l

i l

l t

i f

r L

l This Procedure Addresses Safety Related Component.s Approved by NOS b)M b Date /d - /I-EP t

l. h AP-770 PAGE 1 of 19 EDGA L./

1 h

. )

'- 6

.j.,

e i

,.,..t.

c.

9' r;,,.,

. g

.;('

.a

+ ';, '

~

s

3..(.

Q s.

' i

, i' I

. c T

t

.g m..

)

p' 4

1 L

T

't.

BIANK PAGE-W 4

\\

r T

t 4

s e

AP-770.

REV 12 PAGE 2 of 19 EDGA

+

'.< O : 65',

'.' )' (

'4 a.

W

'W h W We W W f PW M*w-T'NtP tw bh &.w eewe.ww4.e.seh e

__3+4-*mp.mwy9 9 w ww-siM*+s+etew

  1. usy we WW WT amewe we++eu m w!Mr m e*@'W-Tare Mwneeq p+3-pma,,e4-e.1en.w.bN3e w<ee ir-m & v1ee WN

40 ' M 1 ATE ACTI0tts l'.

,,1

l. (('~'

ACTIONS DETAILS x

2.1 Ensure EDCs start and energize the affected bus.

l IE HQI energized, THEllt I

1. Ensure all feeder Skrs to affected bus are open.

i

2. Close feeder Bkr from Units close:

1 and 2 by holding in l

"CI.0SE" position.for = 10 sec.

o Bkr 3211, 3A 4160V ES Bus, i

l o

Bkr 3212, 3B 4160V ES Bus.

l i

i i

r O

i e

I i

\\

?

t I

l

\\

1 I

i 1

i l

I

,AP-770 REV 12 PAGE 3 of 19 EDGA

' l '.,

Tablo 1: EDG Rating.

Tine Maximum g

Load Range in KW

(

') -

v 3D min

> 3000 to $ 3300 2000 hr

> 2750 to $ 3000 Continuous i 2750 FM Table 2: EDG Loads to Shed 14 ADS XW l

EFP-1 528 SWP-1A or SWP-1B 486 RWP-2A or RWP-28 538 AHF-1A or AHF-1B or AHF-1C 61 i

i l

/--

r i

e

\\m l

I t

t' i

i t

l t

l l

1 i

t l

5 l

l AP-770 REV 12 PAGE 4 of 19 EDGA l

3.0 NLIDN-UP ACTIONS

[ )

ACTIONS DETAILS v

3.1 Notify SOTA, if available, of plant condition.

I l

l 3.2 CONCURRENTLY PERFORM I

VP-580, Plant Safety Verification Procedure, beginning with Step 1.1.

3.3 IE either EDG load is 1.

Ensure HPI is bypassed or l

> 3000 KW, reset.

THEN reduce EDG load I

to < 3000 KW.

2.

Stop EDG supplied equipment l

that is not required, see Table 2 for approx load ratings on possible EDG loads to shed.

o Any 100% capacity equipment may be stopped if its

(-

redundant equipment is operating.

o EFP-1 may be secured during a LOCA if LPI flow is > 400 gpm.

i 3.4 IE EDG energizes the bus Refer to OP-703, Plant and then trips, Distribution System, Section l

THEN reset the "4160V ES 4.22.

l l

BUS ES/UV BLOCK LOCK OUT" l

AND energize the bus.

l f

o AP-770 REV 12 PAGE 5 of 19 EDGA 1

,e.

TCblO 1 EDG Rating.

m Time Maximum

lL( )

Load Range in KW LJ 30 min

> 3000 to S 3300 2000 hr

> 2750 to S 3000 Continuous 1 2750 KW Table 2: EDG Loads to Shed

, LOADS KW EFP-1 528 SWP-1A or SWP-1B 486 RWP-2A or RWP-2B 538 AHF-1A or AHF-1B or AHF-1C 61

(-

Table 3: ES 480V Loads and Ratings I4 ADS KW "A" Battery Chargers 93 i

ES-MCC-3AD With AHF-1C 91 "A" Heat Tracing 41 c

EFIC Room Fans 13 AHF-19A or 19B 17 l

l AHF-17A/B or AHF-18A/B 50 s

Chilled Water Pumps 17 Chiller 193 l

Spent Fuel Pumps 41 i

i L

L l

t l

AP-770 REV 12 PAGE 6 of 19 EDGA l'

l

y-L 2.0 ' FOIJ.DW-UP ACTIONS (CONT'D1

)

fN ACTIONS DETAILS

.h

-3.5 II ES 480V undervoltage 1

Bypast or Roset ES

~

lockout has actuated, actuation.

THEH reset ES 480V lockout.

2 Roset T.S 480V lockouts located behind tha MCB.

3 Ensure EDG has enough capacity to supply desired loads, if operating, see Tables 1, 2,

and 3.

4 Select " BATTERY CHRG" switch to " RESET" to l

re-energize A-side battery chargers.

5 IE heat tracing is desired,.

THIH reset heat tracing

~

at local panel near ES-MCC-3A2.

()

6 Start desired loads, see Table 3 for ES 480V loads and ratings.

l 3.6 II 1 ES 480V bus is HQI 1

Ensure EDG has enough energized, capacity to supply L

THEN transfer ES-MCC-3AB desired loads, if I

to energized ES 480V bus.

operating, see Tables 1,

2, and 3.

2 Depress transfer push-buttons for the ES-MCC-3AB to the energized ES 480V Bus.

l l

l

()

AP-770 REV 12 PAGE 7 of 19 EDGA

=

r Tablo 1: EDG Rating.

[

f Time Maximum t

Load Range in KW q(

[. h.

'^

' N ~,)y g

i 30 min

> 3000 to S 3300 i

2000 hr

> 2750 to S 3000 lI, Continuous 5 2750 KW i

i Table 2: EDG Loads to Shed LOADS KW j

EFP-1 528 i

SWP-1A or SWP-1B 486 RWP-2A or RWP-2B "538 i

AHF-1A or AHF-18 or AHF-1C 61 l

l Table 3: ES 480V Loads and Ratings j

(

LOADS KW "A" Battery Chargers 93 ES-MCC-3AB With AHF-1C 91 l

t "A" Heat Tracing 41 6

EFIC Room Fans 13 AHF-19A or 19B 17 I

AHF-17A/B or AHF-18A/B 50 1

Chilled Water Pumps 17 l

Chiller 193 Spent Fuel Pumps 41 l

.t i

AP-770 REV 12 PAGE 8 of 19 EDGA

-n

T t *.

3.0 'FDLTAW-UP ACTIpalS (CQGfTID) 1

(

)'

ACTIONS DETAILS

+

v 3.7 IE NUP restart is required, 1

Close NUV-16, Seal IEEN start NUP, Injection Control. Valve.

&HD establish RCP seal injection.

2 Start ES selected MUP.

1 3

Establish PUP cooling, 4

Ensure NUV-18 is open, t

Seal Ihjection Block Valve.

5 Throttle open, NUV-16, to obtain 2 gpa/RCP.

6 Throttle Open, NUV-16, o

over a 30 min period, to establish = 10 gpa/RCP.

3.8 lE SW Raw Water PRESS To start RWP-2B:

' bas HQI recovered,

('

THEN start RWP-2A or 1.

Select RWP-2B control i

RWP-2B.

switch to the "STOP" position to reset the anti-pump device.

l 2.

Select RWP-2B control switch to the " START" position.

l l

l l

l l

AP-770 REV 12 PAGE 9 of 19 EDGA

O

-d '

l Tcblo 1: EDG Rating.

l Time Maximum gf Load Range in KW i

l- /

'i l \\_)

f 30 min

> 3000 to S 3300 t

2000 hr

> 2750 to S 3000 I

continuous S 2750 KW i

i I

i Table 2: EDG Loads to Shed I

I I4 ADS KW

[

i

?

EFP-1 528 I

SWP-1A or SWP-1B 486

[

f RWP-2A or RWP-2B 538 L

AHF-1A or AHF-1B or AHF-1C 61 i

l i

(~

Table 3: ES 480V Loads and Ratings l

('

LOADS KW j

"A" 3attery Chargers 93 j

ES-MCC-3AB With AHF-1C 91 "A" Heat Tracing 41 EFIC Roola Fans 13 l

AHF-19A or 19B 17 AHF-17A/B or AHF-18A/B 50 i

Chilled Water Pumps 17 chiller 193 Spent Fuel Pumps 41 t

t O

l AP-770 REV 12 PAGE 10 of 19 EDGA

]

3.0 'POLLOW-UP ACTIONE (CONT'D)

(

(

i i / -

ACTIONS DETAILS b

\\-

s J

3.9 lI gli of the following 1

Ensure EDG-1B capacity j

conditions are mett is available for 126 KW, o

PER heaters are required, see Table 1 for EDG l

o PER heater normal power rating.

I supply is HQI available, o

PZR heater MCC-3A is 2

Notify TB operator to open available, all Bkrs ont i

t THEH ensure EDG-1B capacity 480V Plant Aux Bus, for 126 KW lead, f

&HD energize 1 heater group 480V Rx Aux Bus 3A, i

from 4160V ES Bus 3B.

l PZR heater MCC-3A.

l 3

Energiza Rx Aux Bus 3A by.

closing:

}

3.1 Bkr 3222, 3.2 Bkr 3312, 3.3 Bkr 3392,

()

3.4 Bkr 3395.

4 Notify TB Operator to close Bkr 3355 on Rx Aux o

l Bus 3A.

I 5

Notify TB Operator to i

close Bkr-1A and Bkr-2A at PZR heater MCC-3A.

6 Notify TB Operator at PZR heater MCC-3A to i

. closet l

l o

Bkr 4A for group 1 or i

i o

Bkr 1C for group 7 or o

Bkr 2C for group 8 or o

Bkr 3C for group 9.

l NJ AP-770 REV 12 PAGE 11 of 19 EDGA

--+

,e

--,v,-----a,


m-n

I T blo la EDG Rating.

(

Time Maximum

-j s

Load Range in KW l

'RY

\\

30 min

> 3000 to S 3300 j

i 2000 hr

> 2750 to s 3000 i

Continuous 1 2750 KW i

i Table 2: EDG Loads to Shed l

IDADS XW i

l EFP-1 528 i

SWP-1A or SWP-1B 486 t

RWP-2A or RWP-2B 538 I

AHF-1A or AHF-1B or AHF-1C 61 i

I i

(~'

Table 3: ES 480V Loads and Ratings

(

i I4 ADS KW j

(

"A" Battery Chargers 93

\\

ES-MCC-3AB With AHF-1C 91 l

"A" Heat Tracing 41 EFIC Room Fans 13 l

AHF-19A or 15B 17 5

t AHF-17A/B or AHF-18A/B 50 l

l Chilled Water Pumps 17 Chiller 193 i

Spent Fuel Pumps 41 r

,~

t AP-770 REV 12 PAGE 12 of 19 EDGA

E I

I i

=

3.0 FOfinM-UP ACTInum (OOMT'D)

&CTIONS DETAILS

,()

CAUTION

~

.)

PER heater Low Level interlock will be bypassed during performance of this step.

Secure PER heaters if PER level decreases to 40 in.

o...................................................................

3.10 II gli of the following i

Ensure EDG-1B capacity is conditions are nets available for 126 KW, see Table 1 for EGDG rating.

o PZR heaters are required, I

o PZR heater normal power 2

Notify TB operator to open all supply is HQI available, Bkrs ont o PER heater MCC-3A is HQI 480V Plant Aux Bus, available, 480V Rx Aux Bus 3B, PZR heater MCC-3B.

THEN ensure EDG-1B capacity for 126 KW load, 3

Bypass the PZR heater Low Level

&HD energize 1 heater group interlock by installing the from 4160V ES Bus 3B.

following jumperst i

3.1 TB22-13-094 (ICS) to TB8-6-384 (ICSAR),

3.2 TB8-6-384 (ICSAR) to l

l TB22-7-094 (ICS),

3.3 TB22-22-094 (ICS) to TB12-8-383 (ICSAR).

4 Energize Rx Aux Bus 3B by closings i

4.1 Bkr 3222, 4.2 Bkr 3312, 4.3 Bkr 3392, 4.4 Bkr 3396.

i 5

Notify TB Operator to close Bkr 3356 on Rx Aux Bus 3B, l

6 Notify TB Operator to close Bkr 1A and Bkr 1B at PZR heater MCC-3B.

7 Notify TB Operator at PZR heater MCC-3B to close:

o Bkr 2A for group 2 or o

Bkr 3A for group 5 or o

Bkr 4A for group 6 or o

Bkr ID for group 10.

AP-770 REV 12 PAGE 13 of 19 EDUA

~

' hi I

1 Tablo 1: EDG Rating.

L i

i n

Time Maximum ql j(

T Load Range in KW i

1._

/

n I

30 min

> 3000 to 5 3300 i

2000 hr

> 2750 to 5 3000 J

Continuous 5 2750 KW Table 2: EDG Loads to Shed f

l ICADS KW EFP-1 528 SWP-1A or SWP-1B 486 RWP-2A or RWP-2B 538 i

AHF-1A or AHF-1B or AHF-1C 61 l

i

~

i

<x Table 3: ES 480V Loads and Ratings k

LOADS KW "A" Battery Chargers 93 ES-HCC-3AB With AHF-1C 91 "A" Heat Tracing 41 l

EFIC Room Fans 13 l

i l

AHF-19A or 19B 17 i

AHF-17A/D or AHF-18A/B 50 l

Chilled Water Pumps 17 Chiller 193 1

i Spent Fuel Pumps 41 O

AP-770 REV 12 PAGE 14 of 19 EDGA

i 10 *,FOLIDtf-UP ACTIORIS f CORIT ' D) i l

ACTIONS DEI &ILE g

(/

s_

i l 3.11 IE an outside air j

compressor is available, l

THER notify TB operator to start SAP-1C or SAP-1D.

i l

l 3.12 II SAP-1C and SAP-1D are

}

HQI available, IHEN start diesel air i

compressor, if available.

l t

l 3.13' II all'outside air Refer to OP-408, Nuclear compressors are HQI Services Cooling System, l

available, Section 4.6.

THEN establish IAP-1B i

cooling from SW system.

l 3.14 "LE IAP-1B is required, 1.

Ensure EDG-1B capacity

[

.hHQ 480V plant Aux Bus is available for 75 KW, i

is energized, see Table 1 for EDG THEN energize Rx Aux rating.

[

Bus "B"

[

AEQ start IAP-1B.

2.

II PZR heater MCC-3B is being used, THEH notify TB Operator to open all Bkrs on Rx Aux Bus B except Bkr 3356.

IF NOT, i

THEN notify TB Operator

[

to open all Bkrs on Rx Aux Bus B.

t 3.

Energize Rx Aux Bus 3B by closing Bkr 3396.

l l.

4.

Start IAP-1B.

I

.i AP-770 REV 12 PAGE 15 of 19 EDGA e

i TCblo 1: EDG Rating.

',.s Time Maximum

-[

}

Load Range in KW g]

(/

30 min

> 3000 to S 3300

]

2000;hr

> 2750 to 5 3000 Continuous S 2750 KW Table 2: EDG Loads to Shed IAADS KW EFP-1 528 SWP-1A or SWP-1B 486

~

RWP-2A or RWP-2B 538 AHF-1A or AHF-1B or AHF-1C 61 Table 3: ES 480V Loads and Ratings

,3 LOADS KW i

"A" Battery Chargers 93 ES-MCC-3AD With AHF-1C 91 "A" Heat Tracing 41

(

i EFIC Room Fans 13 e

AHF-19A or 19B 17 AHF-17A/B or AHF-18A/B 50 l

Chilled Water Pumps 17 l

Chiller 193 l

I Spent Fuel Pumps 41 l.

I l

i l

AP-770 REV 12 PAGE 16 of 19 EDGA l

\\

l 2.o 'rouar-um_&cruunusnuz.tDJ.

['

ACTIONS DETAILS

\\-

-l 3.15 IE IAP-1B is required, 1

Ensure EDG-1B capacity f

&HD 480V Plant Aux Bus is is available for 75 KW, i

HQI energized, see Table 1 for EDG l

IEEN energize Rx Aux rating.

Bus B, l

&HD start IAP-1B.

2.

Notify TB Operator to open all Bkrs ons l

o 480V Rx Aux Bus 3B, f

o 480V Plant Aux Bus, j

l 3

Energize Rx Aux Bus 3B by closing:

i 3.1 ___ Bkr 3222, l

t 3.2 Bkr 3312, 3.3 Ukr 3392, l

3.4 Bkr 3396.

()

4 Start IAP-1B.

l l'3.16 Start control complex Start normal control I

ventilation, complex ventilation.

Refer to i

OP-409, Plant Ventilation, i

l l

Section 4.2.

II control complex chillers are l

HQI available, i

THEN refer to OP-409, Plant l

Ventilation, Section 4.3 for ll.

Appendix R chillers, QB refer to MP-193, Temporary l

Cooling to Control Complex.

[

O 1

AP-770 REV 12 PAGE 17 of 19 EDGA 1

f

)

. o.,

Tablo 12-EDG Rating.

q)

' _y.

Time Maximum

)

Load Range in KW

.j

\\_ /

J 30 min

> 3000 to 1 3300 2000 hr

> 2750 to S 300L Continuous 1 2750 KW j

?.

Table 2: EDG Loads to Shed' 14 ADS KW EFP-1 528 SWP-1A or SWP-1B 486 f

I RWP-2A or RWP-2B 538 AHF-1A or AHF-1B or AMF-1C 61 i

t Table 3: ES 480V Loads and Ratings LOADS KW j

"A" Battery Chargers 93 ES-MCC-3AB With AHF-1C 91 "A" Heat Tracing 41 l

EFIC Reon Fans 13 i

AHF-19A or 19B 17

?

AHF-17A/B or AHF-18A/B 50 Chilled Water Pumps 17 l

l Chiller 193 l

Spent Puel Pumps 41 l

i l

l l

l AP-770 REV 12 PAGE 18 of 19 EDGA l

l w


,,---a,,-__-------,&-__

---s

e 1

3.0

  • FOfJnW-UP ACTIOMB (COMT'D) j

\\

)

/~'s, ACTIONS DETAILS T

(/

Note Plant should be in a stabla condition prior to paralleling to EDG.

f 1

l 3.17 MHEH alternate power is 1

Ensure HPI is bypassed or available to ES 4160V reset.

I

busses, THEN sync in alternate 2

Depress the "4160V ESA or power supply, B UV RESET" pushbutton.

&HD unload EDG.

t 3

Select EDG speed droop to 60.

I 4

Select EDG Unit Parallel switch to " PARALLEL".

5..__ Select syncscope for Bkr to be paralleled to "ON" 6 ___ Select "EXC VOLT AtkT SELECT" O

switch to " CONT RM".

+

l 7

Match voltages using "EXC

+

VOLT ADJ DIESEL GEN".

8 Adjust Gen speed to f

establish syncscope moving slowly in the

" SLOW" direction, counterclockwise.

9 Close oncoming Bkr at

= 1 o' clock.

10 Refer to SP-354A or B, EDG Monthly test, to stop EDG.

i

.I AP-770 REV 12 PAGE 19 of 19 EDGA