Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039A976 + (Requests Plan for Continued Staffing of Plant Prior to Restart,Including Justification for Keeping Personnel Holding Operator Licenses But Who Did Not Pass Oct Exam. Response to Be Provided within 10 Days)
- ML20155J881 + (Requests Plan for Ensuring That Insps for State of Il Transition to Agreement State Completed by 860615.Monthly Status Meetings Proposed)
- ML20034B688 + (Requests Plan for Ultimate Disposition of Facility to Enable NRC to Continue Review of Stating That possession-only License Would Be Submitted on 900430. Adequate Trained Staff Must Be Maintained)
- ML20205C154 + (Requests Planned Action & Schedule for Resolving Love Recommendation That Facilities Be Inspected Re Util Policy of Designating Interim Lead Auditors When Individuals Not Qualified to Be Certified as Lead Auditors)
- ML20136G491 + (Requests Plans & Programs to Resolve Concerns Identified Re Investigation of 850609 event,plant-specific Findings, Programmatic & Mgt Issues Contributing to Event & Recent Performance of Facility.List of Areas of Concern Encl)
- ML20052D531 + (Requests Plans & Schedule for Reactor Decontamination, Mitigation of Worker Radiation Doses,Removal & Replacement of Safe Ends & Justification for Resuming Operation.Info to Be Submitted within 15 Days)
- ML20035E713 + (Requests Plans & Schedules for Corrective Actions Taken Re NRC 930218 Request Concerning GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in Bwrs)
- ML20031B364 + (Requests Plans & Schedules for Implementing NEPA W/Respect to CP Application Extension)
- ML20203N579 + (Requests Plans & Schedules for Insp of Reactor Coolant Pump Shafts & Other Structural Components & Justification for Continued Operation Until Insp Can Be Performed,Per IE Info Notice 86-019)
- ML20203K979 + (Requests Plans & Schedules for Inspecting Reactor Coolant Pump Shafts & Other Structural Components,Per IE Info Notice 86-019.Response Requested within 20 Days of Ltr Date)
- ML19340A930 + (Requests Plans Including Design Criteria & Schedule for Installation of Augmented Offgas Sys at Plant.Submittal Should Be Made within 60 Days of Receipt of Ltr)
- ML19260A898 + (Requests Plans Re Production of Documents Identified in NRC Objections to Joint Statement of Southern CA Edison Co & State of CA Dept of Water Resources.Reasonable Means of Minimizing Burden Are Open to Discussion)
- ML20056B745 + (Requests Plans and Methods for Conducting Test on Four Flow Restrictors,Per 710512 Event & 710702 Interim Rept)
- ML20236K317 + (Requests Plans for Meeting Amended Requirements of 10CFR55 Re Individuals Identified as Potential Dual Licensed Operators in)
- ML20002B693 + (Requests Plans for Participation in Effort to Further Hardware & Procedural Changes to Assure Long Term Scram Sys Reliability.Response Requested within 25 Days)
- ML19210B382 + (Requests Plans for Snubber Seal Mods & Submission of Proposed Tech Specs for Snubber Surveillance Program. Discusses Discovery of Defective Bergen-Patterson Co Seals)
- ML20058E533 + (Requests Plans for Upgrading Particulate Airborne Monitoring Sys for Detecting Radiological Changes in Reactor Bldg. Submittal Should Include Plans & Schedules for Installing Purge Exhaust Particulate Monitoring Sys)
- ML20002C989 + (Requests Plans of Schedule for Conducting Load Rejection Tests in Support of Proposal to Operate W/Bypass Valves Isolated in Manual Mode)
- ML20040G242 + (Requests Plans to Address Problems of Westinghouse Model D Steam Generator Tube Damage Be Provided.Reliance on Westinghouse Test Program & Instrumentation Proposed for Detection of Flow Induced Vibrations Should Be Addressed)
- ML20040G247 + (Requests Plans to Address Problems of Westinghouse Model D Steam Generator Tube Damage Be Provided.Reliance on Westinghouse Test Program & Instrumentation Proposed for Detection of Flow Induced Vibrations Should Be Addressed)
- ML20040G252 + (Requests Plans to Address Problems of Westinghouse Model D Steam Generator Tube Damage Be Provided.Reliance on Westinghouse Test Program & Instrumentation Proposed for Detection of Flow Induced Vibrations Should Be Addressed)
- ML19310A955 + (Requests Plans to Vent Krypton Be Suspended Until Ucs Study Completed)
- ML20032B104 + (Requests Plant Be Closed for Repairs)
- ML20065A151 + (Requests Plant Be Shut Down)
- ML20153D194 + (Requests Plant Configuration Be Reviewed for Possible Impact of Prolonged Low Power Operation on Reliability of Check Valves)
- ML20024D474 + (Requests Plant Fes)
- ML20002C537 + (Requests Plant Investigation Be Conducted Re Millstone Event Per Encl Request for Info.Description of Jul 1976 Events Re Plant Operation & Equipment Failures During Degraded Grid Voltage Condition Encl)
- ML19248D025 + (Requests Plant Remain in Shutdown Condition Until Safety Evaluation Via Hearing)
- ML19225C828 + (Requests Plant Shutdown Until Labor Dispute Is Solved. Plant Is Notorious for Radiation Leakage & Other Hazards)
- ML19261D852 + (Requests Plant Status Rept.Forwards Questions)
- ML19340D505 + (Requests Plant Sys & Core & Containment Sys Branch Review of Encl Info Re Util Core Reload Application,To Identify Potential Problem Areas.Feedback Should Be Provided Re Identity of Reviewers & Meeting of Listed Schedules)
- ML20079S267 + (Requests Plots Showing Results Obtained from AP600 Test Performed at SPES-2 Test Facility in Piacenza,Italy on 940922 Be Withheld (Ref 10CFR2.790))
- ML20127B762 + (Requests Policy Determination by Commission on Approach to Take on Application of Atomic Energy Act Requirement of Compatibility to State Programs Regulating Low Level Radwaste Disposal Facilities)
- ML20034F207 + (Requests Policy Guidance Describing Circumstances That Result in Compromise of Safeguards Info,Per GL 91-03 & Reg Guide 5.62)
- ML19208C043 + (Requests Population Dose & Health Impact of Accident at TMI Nuclear Station & Updates to Study,As Well as Technical Info Re Reactor Vessel)
- ML18153C969 + (Requests Population Studies Be Used to Update Emergency Plan & Offsite Evacuation Times Associated W/Zones within 10-mile Emergency Preparedness Zone)
- ML20209C798 + (Requests Portion of Funds Allotted to FIN A-3754 Be Transmitted W/Statement of Work & Requests Proposal for NRC Work to Lll.Review Work Must Begin 840401 in Order to Meet Commitment to Provide Preliminary Rept by 840930)
- ML20041B017 + (Requests Portion of Hearings & Limited Appearances Be Held in Ny City)
- ML19343B752 + (Requests Portion of TN-220 Topical Rept Be Withheld (Ref 10CFR2.790))
- ML20083K918 + (Requests Portions of Insp Rept 50-318/78-23 Be Withheld (Ref 10CFR2.790).W/encl Affidavit)
- ML19282B228 + (Requests Portions of Insp Rept Be Withheld from Public Disclosure)
- ML20058C309 + (Requests Portions of Listed Unc Soil Samples for Confirmatory Analyses)
- ML20133B262 + (Requests Position & Corrective Actions within 20 Days of Ltr Date Re Noncompliances Noted During Insp of License 29-12649-03 on 690904 & 23)
- ML17297A783 + (Requests Position Re Acceptability for Exceeding 110% of Design Pressure Limit During non-ATWS Accidents & Transients for Pwrs.Response Requested by 810731 to Complete Licensing Reviews for Near Term Facilities)
- ML20126M553 + (Requests Position Re Edlow Intl Co Encl Applications for Licenses to Export Bulk Tritium to Amersham Intl in United Kingdom for Resale to Customers Located in South Africa)
- ML20126J549 + (Requests Position Re Items of Noncompliance Noted During Insp of License 50-10023-01.Response Should Be Submitted within 20 Days of Ltr Date)
- ML20203N910 + (Requests Position Re Possible Reassessment of Emergency Plan Evacuation Zone Criteria in Light of Recent Accident at Chernobyl.Served on 861015)
- ML20055D579 + (Requests Position on Allowability of Radios or Tape Players in Control Room of Nonpower Reactors)
- ML17179B202 + (Requests Position on Mods Required to Meet NRC Bulletin 93-09 to Eliminate Possible Errors in Reactor Vessel Water Level Indication,Per Util .Util Design of Mods Would Result in Major Plant Transient)
- ML20211D271 + (Requests Position on Remaining Item of Noncompliance from Recent Insp & Any Corrective Steps Taken or Will Be Taken. Response within 20 Days of Ltr Date Requested)
- ML19329E888 + (Requests Posting of Encl Notice to Employees Advising That NRC Will Accept Collect Calls Re Radiological Safety or Quality of Work Problems.Nrc Inspectors Will Wear Badges to Improve Accessibility)