Issue date: 08/13/1976
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Sewell R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8101100433
Download: ML20002C537 (5)


Text

'

s' s

0 l

Docket No. '50-155 GF ' i 1976 Consumers Power Conpany ATTit: Mr. Ralph B. Sewell Nuclear Licensing Administrator 212 West Itichigan Avenue Jackson,titchioan 49201 Gentlemen:

RE: BIG ROCK PODiT Provided herein as Erclosure 1 is a description of events which 1~

occurred at Itillstone Unit No. 2 during July 1976 relatino to plant operation and equipnent f ailures during a degraded grid voltage condition.

On July-27,1976, all utilities with operating reacter facilities received telephone actificatien from the EC of the events at the tiillstone Unit No. 2 f acility.

At that tioe neobers of your staf f were asked to investigate the vulnerability of your facility to si":ilar degradeo voltage concitions anc to previde a resconse Dv telephone within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

As a result of our initial investigation and evaluation of tie potential generic inplications of the events at Millstone and our preliminary' discussions with several licensees, we consider it necessary to reautre all operating reactor licensees to conduct a thorough evaluation of the problem and to sub it fomal reports.

Therefore, we reauest that you cor. duct an investigation of the issue as it affects ycur facility using the P. eat'est for Infomation detailed in Enclosure 2 as a guide, and prnvitie the analyses and results within 30 days of your receirt of this letter.

The signed original and 39 copies of your response will oe necessary.

~ ~

R P00R ORIGINAL.,

8101100g33 I

oareca h 1

eunaauc >,.

j

.I para > l Forms AIC 118 (Rev. 9-53) AEC310240 1lt u. s. eovanmu sme eniatime opricas se74.sas.ies

c

~

U EIS 2-Consuners Power Company This' request for generic infomation was approved by GA0 under a blanket clearance number B-180225 (R0072); this cicarance expires July 31, 1577.

t

~ Sincerely, ce.-t-el Sirn.-4 by: 4 De..nisL.Zic:annj Dennis L. Zienenn, Chief Operating Reactors Branch #2 Division of Operating Peactors

Enclosures:

1.

Description of Events Millstone Unit No. 2 2.

Request for Information cc w/ enclosures:

DISTRIBUTION Hr. Paul A. Perry, Secretary ocket Consuncrs Power Conpany NRC PDR 212 West riichigan Avenue Local PDR Jackson, Michigan 49201 ORB #2 Reading KRGoller Ciarles F. bayless TJCarter of Counsel 0 ELD - Karman Consusers Power Coa'pany Ol&E (3) 212 West t!icLigan Avenue DLziemann Jackson, tichigan 49201 EAReeves RPSnaider George C. Free:'ian, Jr., Esquire RiiDiggs(2)

Hunton, Willia:es, Gay and Gibson dEisenhut 700 East itain Street TBAbernathy Ricinond, Vircinia 23212 JRSuchanan ACRS (16)

Peter U. Steketee Esquire VS tello Freibofer, Cool, ilecht, Oosterhouse Dross and De Boer TVerdery Ur icn Bant 3"ilding, Sui te 950 brand Rapids, iiichioan 495DE Charlevoix Public Library lu7 Clinton Stract Charlevoix, f;1chigan 497/0 2

DOR:')

DOR:0RB 82 EASev)B

)*

~

(..

DOR:

e ne c o-es:ah EVerd y DLZiemann Ed44# MI Y 8/d/76 8/AJ76 8/p/76 _

oat, >

forna AEC 5tB (kes. 9 SS) ALO! 0240 W u. e, eossanass=v raentame orrics **** ess tee

\\'

l L

L. 1 c

i ENCLOSURE NO. 1

' DESCRIPTION OF EVENTS

' MILLSTONE UNIT NO. 2 On July 20, 1976, Northeast Nuclear Energy Company (NNECO) reported that, following a trip of Millstone Unit No. 2 on July 5,1976, several motors puwered from 480 volt (v) motor control centers failed to start as required. The failure of the 480 v motors to start was traced to blown control power fuses on the individual motor controllers. These controllers receive control power through 480 v/120 y transformers within the controller.

NNEC0's investigation disclosed that, as a result of the plant trip, the grid voltage dropped from352 kv to 333 kv.

This voltage drop, in conjunction with additional voltage drops associated with the transformers involved, reduced the control power and voltage within individual 480 y controllers to a voltage which was insufficient to actuate the main line controller contactors. As a result, when the motors were signalled to start, the control power fuses were blown.

Subsequent testing by NNEC0 showed that the contactors required at least 410 y to function properly.

NNECO concluded that under similar low voltage conditions, the opera-bility of 480 v Engineered Safety Feature equipment could not be assured.

NNECO's immediate corrective action was to' raise the setpoint of the Engineered Safeguards Actuation System (ESAS) " loss of power" under-Voltage relays to assure that the plant would be separated from the grid and emergency power system (dual) operation would be initiated before the control voltage fell below that required for contactor operation.

A trip of the undervoltage relays causes the emergency buses to be de-energized and a load shed signal to strip the emergency buses, the diesel generators to start and power the emergency buses, and required safety related loads to sequence start on the buses.

On July 21,1976, NNEC0 reported that the earlier corrective action taken was no longer considered appropriate because during starting of a circulating water pump, the voltage dropped below the new ESAS under-voltage relay setting.

This de-energized the emergency buses, caused load shedding to occur, started the diesel generators and began sequencing loads onto the emergency buses in accordance with the design.

However, during sequencing of the loads onto the buses, the voltage af ain dropped g

below the undervoltage relay setting which caused the load shed signal to strip the buses.

The result was energized emergency buses with no loads supplied.

Y

i l

I ENCLOSURE NO. 2 s

REQUEST FOR INFORMATION 1.

Evaluate the design of your facility's Class IE electrical distribution system to detemine if the operability of safety related equipment, including associated control circuitry or instrumentation, can be adversely affected by short tem or long term degradation in the grid system voltage within the range where the offsite power is counted on to supply important equipment.

Your response should address all but not be limited to the following:

a.

Describe the plant conditions under'which the plant auxiliary systems (safety related and non-safety related) will be supplied by offsite power.

Include an estimate of the fraction of normal plant operating time in which this is the case.

b.

The voltage used to describe the grid distribution system is usually a " nominal" value. Define the nomal operating range of your grid system voltage and the corresponding voltage values at the safety related buses.

c.

The transformers utilized in power systems for providing the required voltage at the various system distribution levels are nomally provided with taps to allow voltage adjustment.

Provide the results of an analysis of your design to determine if the voltage profiles at the safety related buses are satisfactory for the full load and no load conditions on the system and the range of grid voltage.

d.

Assuming the facility auxiliary loads are being carried by the station generator, provide the voltage profiles at the safety buses for grid voltage at the nomal maximum value, the nomal minimum value, and at the degraded conditions (high or low voltage, current, etc.) which would require generator trip.

e.

Identify the sensor location and provide the trip setpoint for your facility's Loss of Offsite Power (undervoltage trip) instrumentation.

Include the basis for your trip setpoint selection.

f.

Assuming operation on offsite power and degradation of the grid system voltage, provide the voltage values at the safety related buses corresponding to the maximum value of grid voltage and the degraded grid voltage corresponding to the undervoltage trip setpoint.

g.

Utilizing the safety related bus voltage values identified in (f),

evaluate the capability of all safety related loads, including related control circuitry and instrumentation, to perfom their safety functions.

Include a definition of the voltage range over which the safety related components, and non-safety components, can operate continuously in the perfomance of their design function.

r

kN o.

(

h.

Describe the bus voltsge monitoring and abnon7a1 voltage alarms available in the control room.

2.

The functional safety requirement of the undervoltage trip is to detect the loss of offsite (preferred) power systen voltage and initiate the necessary actions required to transfer safety related buses to the onsite power systen. Describe the load shedding feature of your design (required prior to transfering to the onsite [ diesel generator]

systems). and the capability of the onsite systems to perform their function if the load shedding feature is maintained after the diesel generators are connected to their respective safety buses. Describe the bases (if any) for retention or reinstatement of the load shedding function after the diesel generators are connected to their respective buses.

3.

Define the facility operating limits (real and reactive power, voltage, frequency and other) established by the grid stability analyses cited in the FSAR.

Describe the operating procedures or other provisions presently in effect for assuring that your facility is being operated within these limits.

4.

Provide a description of any proposed actions or modifications to your facility based on the results of the analyses performed in response to items 1-3 above.

I e

.