Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Preoperational Tests". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • IR 05000354/1985057  + (Preoperational Security Program Review Insp Rept 50-354/85-57 on 851112-15.No Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures.Portions Deleted (Ref 10CFR2.790 & 73.21))
  • IR 05000423/1985030  + (Preoperational Security Program Review Insp Rept 50-423/85-30 on 850617-21.No Noncompliance Noted.Major Areas Reviewed:Site Physical Security Program.Portions Deleted (Ref 10CFR73.21 & 2.790))
  • IR 05000354/1986008  + (Preoperational Security Program Review Insp Rept 50-354/86-08 on 860127-30.Major Areas Inspected:Security Program Implementation,Security Plan & Implementing Procedures.Portions Deleted (Ref 10CFR73.21))
  • IR 05000354/1985025  + (Preoperational Security Program Review Insp Rept 50-354/85-25 on 850514-17.Major Areas Inspected:Status of Security Program Implementation & Physical Security Plan. Safeguards Info Deleted (Ref 10CFR2.790 & 73.21))
  • IR 05000423/1985058  + (Preoperational Security Program Review Insp Rept 50-423/85-58 on 850930-1004.Major Areas Inspected:Proposed Consolidated Site Physical Security Plan & Implementing Procedures.Portions Deleted (Ref 10CFR2.790))
  • IR 05000410/1985038  + (Preoperational Security Program Review Insp Rept 50-410/85-38 on 851028-1101.No Violation Noted.Major Areas Inspected:Security Plan & Implementing Procedures.Portions Withheld (Ref 10CFR2.790(a) & 9.5.(a)(4)))
  • IR 05000443/1985018  + (Preoperational Security Program Review Insp Rept 50-443/85-18 on 850610-14.Major Areas Inspected:Security Program Audit & Security Plan & Implementing Procedures. Portions Withheld (Ref 10CFR73.21 & 2.790))
  • IR 05000423/1985063  + (Preoperational Security Program Review Insp Rept 50-423/85-63 on 851021-25.Major Areas Inspected:Progress in Development & Implementation of Physical Security Program. Portions Deleted (Ref 10CFR2.790))
  • IR 05000423/1985064  + (Preoperational Security Program Review Insp Rept 50-423/85-64 on 851104-08.Major Areas Inspected:Outstanding Inspector Followup Items to Determine Licensee Readiness to Implement Rev 0 to Physical Security Plan)
  • IR 05000443/1986004  + (Preoperational Security Program Review Rept 50-443/86-04 on 860113-16.Major Areas Inspected:Procedures for Receipt of SNM of Low Strategic Significance.Info Deleted (Ref 10CFR73.21 & 2.790(a)))
  • ML19257A207  + (Preoperational Sound Levels)
  • ML20210B813  + (Preoperational Summary Rept for Hope Creek Generating Station Salt Drift Monitoring Program,Aug 1984 - Dec 1986)
  • ML12174A431  + (Preoperational Test - 2-PTI-099-03, Rev 0, Reactor Protection System Operational Check, Pages 1 to 399 of 763)
  • ML20134D361  + (Preoperational Test 2.58.11:Integrated Leak Rate Test)
  • ML20085C592  + (Preoperational Test 304C, Component Cooling Sys Operational Test)
  • ML19093A528  + (Preoperational Test Procedure 1-PO-71, Rev. 0, Chemical Addition Tank and Refueling Water Storage Tank Draindown Test)
  • ML20127D180  + (Preoperational Test Schedule)
  • ML20090L667  + (Preoperational Test Schedule. Related Info Encl,Including Oversized Documents,Preoperational Tests,Test Procedure Index,R Smart 830903 Memo,Hw Wilson 830912 Memo & Wh Wheeler 830711 Memo)
  • ML13148A011  + (Preoperational Test, 2-PTI-068-03, Rev. 0, Pressurizer Heater and Spray Control)
  • ML13148A012  + (Preoperational Test, 2-PTI-068-07, Rev. 0, Reactor Coolant Pump Motor Logic Test)
  • ML13148A013  + (Preoperational Test, 2-PTI-068-09, Rev. 0, Reactor Vessel Head Vent System)
  • ML13148A014  + (Preoperational Test, 2-PTI-068-13, Rev. 1, Shutdown from Outside the Main Control Room)
  • ML16270A531  + (Preoperational Test, Startup Tests and Other Items)
  • Regulatory Guide 1.80  + (Preoperational Testing of Instrument Air Systems)
  • Regulatory Guide 1.41  + (Preoperational Testing of Redundant on Site Electric Power Systems to Verify Proper Load Group Assignments)