Preparation and Scheduling of Operator Licensing Examination - NRC Regulatory Issue Summary (RIS) 2006-15
ML072330086
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/20/2007
From: Morris G
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-06-015, RIS-07-017
Download: ML072330086 (4)


Text

August 20, 2007 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos.

50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS - NRC REGULATORY ISSUE

SUMMARY

(RIS) 2006-15 This letter is in response to the NRC RIS 2007-17 dated July 12, 2007. The enclosure provides the requested information.

If you have any questions, please call me at (423) 843-6672.

Sincerely, Original signed by James W. Proffitt Glenn W. Morris Manager, Site Licensing and Industry Affairs Enclosure cc (Enclosure):

Dr. William D. Travers Regional Administrator, Region II ATTN: J. H. Moorman U.S. Nuclear Regulatory Commission Sam Nunn Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303-8931

ENCLOSURE SEQUOYAHNUCLEARPLANT PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS

NRC FORM 536 (b2005)

PRINTED ON RECYCLED PAPER NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (82005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIAIPrivacy Services Branch IT-5 F53), U.S.

Nuclear Regulatory Commission, Washington, DC 20555000, or by Internet e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY Sequoyah Nuclear Plant NRC REGION RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 09 -

1 O

CY 08 -

1 O

CY 09 -

1 O

B. INITIAL OPERATOR LICENSE EXAMINATIONS CY 09 -

1 O

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 08 -

1 6

I 0

01 /28/2008 0211 112008 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 09 -

1 5

5 0

0 01/26/2009 03/03/2009 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 09 -

0 8

0 0

06/01 12009 07/06/2009 CY 09 -

4 8

0 0

12/07/2009 01/25/2010 CY 08 cy 09 MARCH 0

SEPTEMBER 12 JUNE 0

MARCH 0

DECEMBER 0

JUNE 12 SEPTEMBER 0

DECEMBER 0

NRC FORM 536 (8-2005)

PRINTED ON RECYCLED PAPER L

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION (82005)

OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08131/2008 Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate Nuclear Regulatory to the Records Commission, and FOINPrivacy Washington, Services DC 20555000 Branch (T-5

, or F53),

by Internet U.S.

e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Wash~ngton, DC 20503.

If a means used to impose an information collection does not display a currently valid OMB control number, h e NRC may not conduct or sponsor, and a person is not required to respond to, the information collectton.

FACILITY Sequoyah Nuclear Plant NRC REGION RII A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 10 -

I 0

CY -

CY 11 -

I 0

6. INITIAL OPERATOR LICENSE EXAMINATIONS CY -

PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 10 -

4 8

0 0

08/26/20 1 0 0911 31201 0 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 11 -

4 8

0 0

08/22/2011 0911 a201 1 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY -

CY -

CY CY MARCH SEPTEMBER JUNE MARCH DECEMBER JUNE SEPTEMBER DECEMBER