Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Informs of Util QA Organizational Changes". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20207P190  + (Informs of Util Organizational Changes.Press Releases Re Changes Encl)
  • ML20010H471  + (Informs of Util Partial Completion of Commitment to Install Prompt Notification Sys.Installation & Field Testing of Addl Sirens to Cover 10-mile Emergency Planning Zone Around Plant Will Be Completed by 820201)
  • ML17324B028  + (Informs of Util Participation in Shaw,Pittman,Potts & Trowbridge 860716 Response to NRC Re Proposed New Annual Fees (10CFR171).Statements in Response Endorsed)
  • ML19329A327  + (Informs of Util Plan to Perform Base Line Insp on Facility Steam Generator Tubes During 741019 Refueling Outage.Insp to Follow Reg Guide 1.83 Recommendations)
  • ML20138G304  + (Informs of Util Plan to Submit Info Requested in GL 97-01, Degradation of Control Rod Drive Mechanism Nozzle & Other Vessel Closure Head Penetrations, by 970731)
  • ML20211L249  + (Informs of Util Plans Re Cycle 4 Reload Core Expected to Achieve Burnup of 17,000 Mwd/Mtu.Based on Review of Cycle 4 Reload Analysis,Util Determined That No Unreviewed Safety Questions Defined by 10CFR50.59 Involved W/Reload)
  • ML18095A243  + (Informs of Util Plans Re Facility Cycle 6 Reload Core, Expected to Achieve Burnup of 16600 Mwd/Mtu.All Postulated Events within Allowable Limits Based on Review of Basis of Cycle 6 Reload Analysis & Westinghouse SER)
  • ML18093A540  + (Informs of Util Plans Re Plant Cycle 8 Reload Core,Expected to Achieve Burnup of 16,000 Mwd/Mtu.Amend to License Not Required Based on Review of Cycle 8 Reload Analysis & Westinghouse Reload SER)
  • ML18100A756  + (Informs of Util Plans Re Unit 1 Cycle 12 Reload Core Which Is Expected to Achieve Burnup of 15100 Mwd/Mtu)
  • ML20215G164  + (Informs of Util Plans for Performing Hydrostatic Test of RCS & Attached Sys & Necessity of Entering Limiting Condition for Operation 3.0.3.Test Will Be Performed at End of Current Refueling Outage)
  • ML20151A695  + (Informs of Util Plans to Employ Seismic Experience Data to Show Seismic Adequacy of Replacement Recorders & New Instrumentation for Control Room Panels at Facility.Requests Notification If Approach Unacceptable within 30 Days)
  • ML20076K097  + (Informs of Util Plans to File Motion for Receipt by 941014 Per Motion for Summary Disposition of Intervenors Illegal Transfer of License Allegation, ,which Does Not Meet Requirements of 10CFR2.749)
  • BSEP-95-0160, Informs of Util Plans to Implement Formal Industry Position on Severe Accident Mgt  + (Informs of Util Plans to Implement Formal Industry Position on Severe Accident Mgt)
  • ML20235U697  + (Informs of Util Plans to Modify Approved Reload Analysis Methodology to Make Use of one-dimensional Kinetics Option in RETRAN-02 to Analyze Licensing Basis Pressurization Transients)
  • ST-HL-AE-2590, Informs of Util Plans to Repair External Leakage on Charging & Alternate Charging Header Check Valves by Installation of Encapsulation Device Prior to Exceeding 30% Power.Leaks Will Not Affect Safe Operation of Unit Before Repairs Comp  + (Informs of Util Plans to Repair External Leakage on Charging & Alternate Charging Header Check Valves by Installation of Encapsulation Device Prior to Exceeding 30% Power.Leaks Will Not Affect Safe Operation of Unit Before Repairs Completed)
  • ML20154D347  + (Informs of Util Plans to Repair Limited Number of Steam Generator Tubes by Sleeving During Fall 1988 Refueling Outage.Scheduled Sleeving Will Begin Oct-Nov 1988.Selection of Tubes to Be Sleeved Based on Eddy Current Testing)
  • ML20153B929  + (Informs of Util Plans to Resolve Generic Ltr 87-02 & Unresolved Safety Issue A-46, Seismic Qualification of Electrical Equipment. Intends to Join Seismic Qualification Util Group as Alternative for Addressing Ltr)
  • ML20205H845  + (Informs of Util Plans to Ship Four Nuclear Fuel Bundles, Contained in Two Shipping Containers,To GE Wilmington,Nc Facility)
  • ML20087A152  + (Informs of Util Position Re Circumstances Surrounding Revocation of Individual Unescorted Access to Plant.Review Confirms That Decision in Subj Case Consistent W/Prior Util Access Authorization Decisions.W/Unsanitized Attachments)
  • ST-HL-AE-4169, Informs of Util Position Re Circumstances Surrounding Revocation of Individual Unescorted Access to Plant.Review Confirms That Decision in Subj Case Consistent W/Prior Util Access Authorization Decisions.Encl Attactments Sanitized  + (Informs of Util Position Re Circumstances Surrounding Revocation of Individual Unescorted Access to Plant.Review Confirms That Decision in Subj Case Consistent W/Prior Util Access Authorization Decisions.Encl Attactments Sanitized)
  • ML17212A924  + (Informs of Util Position That Pendency of Antitrust Proceeding Is No Bar to Issuance of Ol.Fl Cities Estopped from Interposing Any Objection to OL Issuance Due to Previous Representations & Actions.Certificate of Svc Encl)
  • ML20138C142  + (Informs of Util Program to Optimize Use of Snubbers on Piping Sys & Requests Approval for Use of ASME Code Cases N-411 & N-397.Following NRC Approval,Necessary FSAR Changes Will Be Implemented)
  • ML20247H162  + (Informs of Util Proposal to Delete post-accident Sampling Commitment to Provide in-line Monitoring & Grab Sample Capability for Dissolved Gases (Hydrogen) in Liquids, Specifically Reactor Coolant.Basis & Justification,Encl)
  • B14666, Informs of Util Proposed Resolution for Containment Penetrations P-39 & P-40 W/Respect to SEP Topic VI-4.Diagram Illustrating Proposed Resolution of Penetrations & Example of Change That Will Be Required to TS Encl  + (Informs of Util Proposed Resolution for Containment Penetrations P-39 & P-40 W/Respect to SEP Topic VI-4.Diagram Illustrating Proposed Resolution of Penetrations & Example of Change That Will Be Required to TS Encl)
  • ML20212C420  + (Informs of Util Purchase of Onsite Property Damage Insurance for Facilities,Per 10CFR50.54 as Amended.Status & Details of Property Damage Insurance Coverage Encl)