Informs of Util QA Organizational Changes
ML20058H248
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 11/13/1990
From: Leonard J
LONG ISLAND LIGHTING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SNRC-1771, NUDOCS 9011150032
Download: ML20058H248 (4)


Text

s

~

.1 l

s' Ls;

  1. 4g LONGLISLAND LIGHTING COMPANY SHOF EHAM NLsCLEAR POWER STATION P.O DOX 618. NORTH COUNTRY ROAD
  • WADING RIVER N.Y. I 1792 JOHN D. LEONARD, JR.

'VICE PRESIDENT.0FFCE OF CORPORATE BERVICES

- ANO -

i VICE PRESIDENT.OFFCE OF NUCLEAR SNRC-1771 l

L' NOV 13 L 1990-

'4 U. S. Nuclear. Regulatory Commission

' ATTN:

Document. Control Desk-q Washington, D.C.. 20555

~1 Quality Assurance Organizational Changes ll Section l;of the LILCO Quality Assurance Manual Shoreham Nuclear Power. Station - Unit 1-Docket No.-50-322 i'

,' Ref t, 1).LILCO' Letter SNRC-1325 dated April 21, 1987 to U.S.

i Nuclear Regulatory Commission'from John D. Leonard, Jr.;

j subjects- 'QA Organizational Changes 2)' LILCO Letter SNRC-1615 dated July 20, 1989 to the U.S.

5 Nuclear Regulatory Commission from John D. Leonard, Jr.;

subjects. Organizational / Personnel Changes

-3) LILCOLLetter SNRC-1626 dated August 31,L 1989 to the U.S.

Nuclear Regulatory Commission from W.E.

Steiger, Jr.;

a

. subjects Staffing-Report

4) ~ LILCO Letter SNRC-1735: dated July 3,1990 to the' U.S.

Nuclear Regulatory Commission from X E.

Steiger, Jr.;

subject:.. Organizational: Change

)

l~

5) LILCOL Letter i SNRC-1745 Ldated' August 21, 1990 to the U.S..
Nuclear Regulatory Commission from John D. Leonard, Jr.;

. subject:

' License Change Application #8 Operating License L

NPF-82:

a i

Gentlemen:

~

Inskeeping with_our commitment to provide the Commission and its

' Staff-with. timely'.information concerning Shoreham Nuclear Power

' Station (SNPS)' activities, the Long Island Lighting. Company (LILCO). wishes' to advise the Commission of recent; changes we have made to'our Quality Assurance (QA) ' organization'.

LILCO~has l

implemented these changes:in order to more effectively utilize our. resource's.for activities a'ssociated with SNPS in its

non-operating,~defueled condition.

LILCO has determined that these changesuare-. administrative in nature and do not involve a change'in the technical specifications incorporated in SNPS operating' license...(NPF-82). or constitute an unreviewed safety /./r a J 1.

l.-

h0h ooh bb 22

/

I I

H F DL.

A

-~)4

'f 5"

e SNRC-1771.

Page 2; questioniin accordance with the criteria of 10 CFR 50.59.

In accordance with 10 CFR 50.54 (a), these changes will be included in the next annual update of the SNPS Updated Safety Analysis Report (USAR) scheduled to be submitted on or before December 7, t

1990..

T These_ changes are as-follows:

The Nuclear-Quality Assurance-Department (NOAD) has been integrated.with the LILCO Corporate Quality. Assurance Organization as shown-on the attached' organization chart.

The

. Manager, NOAD will, report to the-Manager of Corporate Quality

-Assurance.for policy matters, personnel administration, t

v coordination'of resources and budgetary control.

However, the

-direct operational control and day to day reporting remains,

~

as in the past,'to the Vice President - Office of CorporatG.

?

Services and Vice President - Office of Nuclear (see RefOrence 4).- TheJManager NOAD continues to have aidirect line of i

! communication to - the President of - the Company for raatters i;

concerning' nuclear ~ safety.-

i LThe Manager,~NQAD will remain as Chairman of the-Nuclear i

l

' Review:BoardLwhich will continue to function.

The NQAD~will' continue to be located at the SNPS' site and hasofull responsibility 1for1 Nuclear QA functions.

'The SafetyJ Engineering' andEReliability (SER) Division, since L

-it'isinotlonger required-at the1 Division level, has been L*

removed ~from:the organizational' structure. -As appropriate' i

Ethis Division's responsibilities have been reassigned ~or determined.toibe1no, longer pertinenti_.This' division's y<

responsibilities werel originally describedLin> Reference.l.

M

-The; Reliability: Engineering lSection is the only' functional' 4

areasto=be. discontinued.

This..section previously performed-

' reliability studies of plant systems andLcomponentssand was a non-regulatory' required group which hadEthe.objectivesaof increasing 1 plant operational reliability, availability and

' maintainability-.-:Under Shoreham's existing non-operational I

andidefueled condition,=these objectives serve no useful

]

-purpose.-

y The Independent-Safety. Engineering Group- (ISEG) ~, 'which was jV previously:part of the Safety Engineering and Reliability y

' Division,.will report,directly-tofthe Manager, NQAD,-pending

[

NRC approval of License Change Application-#8 (Reference 5)

which. requests permission to eliminate the ISEG.

LILCOLh'as carefully considered the effect of these changes on the i

overall program described in the LILCO Quality Assurance Manual y

.and the' Updated. Safety Analysis Report.

I.

t i

t cs 4

SNNC-1771; Page 3:

Based on.the contractual agreement between LILCO and the State of Now York that SNPS.will.not be operated and will be transferred to-the Long; Island Power Authority-(LIPA) for decommissioning,

-the fact that_all fuel has been removed from the reactor and.is presently stored in the Spent Fuel Storage Pool, and based on the_

-i Commission's Confirmatory Order Modifying License (NPF-82) issued March 29, 1990- prohibiting LILCO from placing any nuclear fuel into the Shoreham reactor vessel without prior Commission 1

approval, LILCO concludes that those organizational changes do not decrease the'NQAD effectiveness.

-The Manager, NQAD will continue 1to report on' day to day activities to the Vice President,. Office of Corporate Services and Office of Nuclear.

'He.willLalso continue to have direct _ communication to the President of the Company for nuclear safety matters.

Additionally,.thesefchanges logically follow from the information provided-to the Commission's Staff by LILCO Management during1the 1 July'28', 1989 public-meeting in Rockville, Maryland -(see s

transcript _at'pages_70-71).

,J Sh'ould:you have' any questions, please contact our Manager, NOAD, Mr. William M. Maloney at (516) 929-8300 extension 3308.

--Very : truly; yours,

^k

. /3 7

Q shts f

(. _)

-Jd n eonard, Jr.1 l

.Vi e President, Offipe of Corporate Services

'and Office offNucl'e'ar-

TC'/GJGiap JAttachment i

. cc s : :S.. Brown T. T. Martin B'.

Norris,-

.j u

'I I

o1

^

l

~

)

b o

f u.

i

+,

1A lol AC H M EN. T.TO.S.N RC-?177.1 PRESIDENT AND

. CHIEF OPERATING-i

OFFICER -

. l.

l

' VICE PRESIDENT l

OFFICE OF-4 p

CORPORATE. SERVICES "g

. & VICE PRESIDENT

.l-OFFICE OF NUCLEAR i

I I

i I

l l

l MANAGER

.I MANAGm DIRECTOR MOR NUCI. EAR P W fr N EMERGENCY NINE MILE "nWO sHOREHm I

NUCLEAR OPERATIONS CORPORATE OFFICE OF PLANNING OVERS 80HT NUCLEAR POWER I

ENGINEERING SUPP N OA "A"

I DEPARTMENT TRAINING i

DEPARTMENT GROUP ^

GROUP l

g

  • - - - - - ~ ~ - - -.

j g __ _ _-.

=

  • a l

l cOuuuNicATION REoARDiNo MANAGER MANAGER

{

NMEAR SAW WERS k

r MANAGER' REVIEW OF.

CORPORATE NUCLEAR NUCLEAR QA OPERATIONS gy,7g,g,y

' TRAINING TRAINING OPERATION AL CONTROL DEPARTMENT COMMITTEE DEPARTMENT DEPARTMENT j

I I

FUNCTION AL AND f

l f

ADuINI8TR ATIVE CONTRO1 I

.I l

-l l

QUALITY.

QUALITY INDEPENDENT NUCLEAR t

CONTROL SYSTEMS gnoE,go REVIEW MANAGER MANAGER

GROUP BOARD I

1

-l l

l

'l:

~

l l

l 1

INSPECTION QUA W AUDIT QUALITY OPEATIONAL PROCUREMENT ASSURANCE ENGINEERING ANALYSIS

?ECTION SECDON SECTION SECTION -

SECTION SECTION '

^*

l:..

-. -