Informs of Vault Upgrade Program Reconsideration to Meet 10CFR73.2(n) Specs.Intends to Eliminate One Guard Per Shift & Revert to Required Minimum Complement of Five arms-trained Individuals During Operation
ML19261D013
Person / Time
Site: Wood River Junction
Issue date: 02/20/1979
From: Bower C
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
To: Mccorkle G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
CEB-79-37, NUDOCS 7904230355
Download: ML19261D013 (1)


Text

nn-t/

/

UNITED F DD UDC NUCLEAR CORPORATION PWIL ttCOVitf CPf f ATION/ WOOD tivlt JUNCTION. t. 1. 02894 CEB 79 - 37 February 20, 1979 U. S. Nuclear Regulatory Commission Mr. George W. McCorkle, Chief Physical Security Licensing Branch Division of Safeguards Washington, D. C.

20555

Dear Mr. McCorkle:

FRO License Condition 9.3.48 requires that six specific types of SNM be placed in a vault meeting the requirements of 10 CFR 73.2 (n) whenever the process material access area is un-occupied.

Alternatively, the licensee may provide a guard or two arms-trained individuals in addition to the complement re-quired by FRO License Condition 9.3.47 (which mandates a mini-mum of five armed guards).

In the past, we have elected the option of additional guard-power rather than the relatively expensive vault upgrading.

Recent developments have led to reconsideration of the vault upgrade program.

Accordingly, we are presently planning the upgrade of our vault-like rooms to meet the specifications of 10 CFR 73.2 (n).

Once our vault meets these specifications, it is our intention to eliminate one guard per shift consistent with the alternative included as part of License Condition 9.3.48 and to revert to the required minimum complement of five arms-trained individuals during operation and six otherwise.

In addition to being, effectively, an "already licensed option",

4 this action will not decrease our level of security.

In fact, considering the many improvements that have been made (and re-ported to NRC) since the date of the license conditions, we fully believe that the resulting security system offers protec-tion above and beyond the requirement.

We expect to implement the vault change no later than July 30, 1979.

Sincerely, United Nuclear Corporation

. E.

Bowers 9

  1. 8 g-General Man DCCKETED USNRC 1EbO pii2 1 1979 > h CEB:RG:ar NM55 MAP. SIC'O D