Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009B021 + (Forwards Updated SAR for Review.Rept Supersedes Revised Final Safeguards Rept & All Subsequent Amends)
- RBG-26453, Forwards Updated SAR for River Bend Station.List of Initial Updated SAR Changes Made Under Provisions of 10CFR50.59 & Not Previously Reported to Commission Encl + (Forwards Updated SAR for River Bend Station.List of Initial Updated SAR Changes Made Under Provisions of 10CFR50.59 & Not Previously Reported to Commission Encl)
- SNRC-1296, Forwards Updated SAR for Shoreham Nuclear Power Station & Rev 6 to Plant Design Assessment Rept for Safety Relief Valves & LOCA Loads.... Encl Proprietary Suppl to Assessment Rept Withheld (Ref 10CFR2.790) + (Forwards Updated SAR for Shoreham Nuclear Power Station & Rev 6 to Plant Design Assessment Rept for Safety Relief Valves & LOCA Loads.... Encl Proprietary Suppl to Assessment Rept Withheld (Ref 10CFR2.790))
- ML19329B477 + (Forwards Updated SER Evaluating Operational QA Program Described in Section 17.2 of FSAR Through Revision 20.QA Program Found Acceptable)
- ML20213E460 + (Forwards Updated SER Input Based on FSAR Section 3.5.1.3 Re Turbine Missiles.Proposed Plant Design for Turbine Missile Risk Meets Requirements of GDC 4 & Acceptable Subj to Establishment of NRC Approved Turbine Maint Program)
- ML20033C729 + (Forwards Updated SER Input,Commenting on Inadequate Tornado Missile Protection for 480-volt Transformers.Positive Vent Opening Protection Against 1-inch Missile Required.Comments Requested by 811130)
- ML20248B892 + (Forwards Updated SG Run Time Analysis Cycle 9 & Updated Probabilistic Operational Assessment for Songs,Unit 2,Second Mid-Cycle Operating Period,Cycle 9. Assessment Updates Info Provided in 980220 Submittal & Supercedes 970925 Submittal)
- ML20070H793 + (Forwards Updated Safe Shutdown Analysis for Fire Protection. Addl Info on Fire Protection Sys & Exemptions to 10CFR50,App R,Section Iii.G & Iii.J Included)
- ML13333C021 + (Forwards Updated Safeguards SER Statement,Resulting from Review of Util 831216 10CFR50.90 Application to Amend Physical Security Plan.Assistance Requested in Reviewing Update Due to Vital Area Program)
- ML20010H550 + (Forwards Updated Safety Analysis Matl & Requalification Program,In Support of Renewal of License R-114)
- ML20138A807 + (Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart)
- ML20138A811 + (Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart)
- ML20214L878 + (Forwards Updated Safety Evaluation/Analysis Supporting Hydrogen Water Chemistry for Peach Bottom Atomic Power Station Units 2 & 3. Review & Approval of Storage of Liquid Hydrogen & Oxygen Requested)
- ML20045J238 + (Forwards Updated Safety Issues Index Incorporating NRC 930624 Comments)
- ST-HL-AE-2657, Forwards Updated Safety Questions Evaluation,Containing Justification for Continued Operation Described During 880513 Discussion Re Auxiliary Feedwater Pump Shaft Sleeve Failures + (Forwards Updated Safety Questions Evaluation,Containing Justification for Continued Operation Described During 880513 Discussion Re Auxiliary Feedwater Pump Shaft Sleeve Failures)
- ML18087A819 + (Forwards Updated Salem Restart Status Rept, Consisting of NRC Evaluations & Status of Resolution of Issues Associated w/830222 & 25 Events Involving Failure of Reactor Trip Circuit Breakers to Trip Upon Receipt of Automatic Signal)
- DCL-91-088, Forwards Updated San Luis Obispo County Nuclear Power Plant Emergency Response Plan + (Forwards Updated San Luis Obispo County Nuclear Power Plant Emergency Response Plan)
- NL-88-149, Forwards Updated Schedule & Summary Status for NRC Open Item Closure + (Forwards Updated Schedule & Summary Status for NRC Open Item Closure)
- ML20040B306 + (Forwards Updated Schedule Re Major Milestones in Testing Program for Electrical Penetrations.Final Test Rept Delayed Due to Addl Time Needed to Fabricate Wall Assembly Mockup. Final Test Rept Scheduled for Issue in Apr 1982)
- ML20040F074 + (Forwards Updated Schedule for Addressing Balance of Applicable SEP Topics & Recommendations Re Conduct of Integrated Assessments at Conclusion of Program.Integrated Assessment Should Use Probabilistic Risk Assessment)
- BVY-93-142, Forwards Updated Schedule for Addressing Unresolved Items Noted in Electrical Distribution Sys Function Insp Rept 50-271/92-81,per Util 921207 Response + (Forwards Updated Schedule for Addressing Unresolved Items Noted in Electrical Distribution Sys Function Insp Rept 50-271/92-81,per Util 921207 Response)
- ML20238A602 + (Forwards Updated Schedule for App R Mods.Schedule Also Reflects Status of Recent Addl Mods Resulting from Fire Protection Shutdown/Cooldown Model Changes Described in Util .Concurrence on Revised Schedule Requested)
- ML19296A741 + (Forwards Updated Schedule for Approval Fire Protection Mods. Schedule Respresents Date at Which Work Involved Will Be Completed)
- ML20084R261 + (Forwards Updated Schedule for Completing Remaining Open Items Re GDC 17 Analysis,Per .Regulatory Commitments & Mods Scheduled to Be Completed by Jul 1984 for Unit 1 & Oct 1984 for Unit 2)
- B12907, Forwards Updated Schedule for Correction of Human Engineering Discrepancies (Heds).First Phase Enchancements & Corrections of Program to Correct Heds Completed.All Revs to Operations Procedures Will Be Completed by End of 1988 + (Forwards Updated Schedule for Correction of Human Engineering Discrepancies (Heds).First Phase Enchancements & Corrections of Program to Correct Heds Completed.All Revs to Operations Procedures Will Be Completed by End of 1988)
- ML19256F603 + (Forwards Updated Schedule for Fire Protection Mods)
- ML20205T619 + (Forwards Updated Schedule for Licensing Actions Assigned to Region Iii.Completed Actions During May 1986 Listed)
- NL-88-309, Forwards Updated Schedule for NRC Open Item Closure & Summary Status.Util Will Continue to Provide Weekly Updates of Open Item Closure Schedule Until Plant Restart + (Forwards Updated Schedule for NRC Open Item Closure & Summary Status.Util Will Continue to Provide Weekly Updates of Open Item Closure Schedule Until Plant Restart)
- NL-88-232, Forwards Updated Schedule for NRC Open Item Closure.District Will Continue to Provide Weekly Updates of Open Item Closure Schedule Until Plant Restart + (Forwards Updated Schedule for NRC Open Item Closure.District Will Continue to Provide Weekly Updates of Open Item Closure Schedule Until Plant Restart)
- NL-88-246, Forwards Updated Schedule for NRC Open Item Closure.Weekly Updates Will Be Provided Until Plant Restart + (Forwards Updated Schedule for NRC Open Item Closure.Weekly Updates Will Be Provided Until Plant Restart)
- NL-88-186, Forwards Updated Schedule for NRC Open Item Closure.Util Will Continue to Provide Weekly Updates Until Plant Restart + (Forwards Updated Schedule for NRC Open Item Closure.Util Will Continue to Provide Weekly Updates Until Plant Restart)
- NL-88-291, Forwards Updated Schedule for NRC Open Item Closure + (Forwards Updated Schedule for NRC Open Item Closure)
- ML20080G103 + (Forwards Updated Schedule for NRC Visits to Conduct Operator Licensing Exams for Period Ending 851231,per Generic Ltr 83-01)
- SNRC-1625, Forwards Updated Schedule for Operator Requalification Exams,Per Generic Ltr 89-12.Based on Settlement Agreement Between Util & State of Ny,Simulator Will Not Be in Operation Beyond 910526 + (Forwards Updated Schedule for Operator Requalification Exams,Per Generic Ltr 89-12.Based on Settlement Agreement Between Util & State of Ny,Simulator Will Not Be in Operation Beyond 910526)
- SNRC-1843, Forwards Updated Schedule for Operator Requalification Exams,Per Generic Ltr 91-12.Training of Future Reactor Operator License Candidates,Under Existing possession-only License,Not Anticipated + (Forwards Updated Schedule for Operator Requalification Exams,Per Generic Ltr 91-12.Training of Future Reactor Operator License Candidates,Under Existing possession-only License,Not Anticipated)
- ML20134A074 + (Forwards Updated Schedule for Projected Operator License & Requalification Exams,Per Generic Ltr 85-18)
- ML20116N918 + (Forwards Updated Schedule for Providing Info on Emergency Response Capabilities Detailed Summary of Transpired Activities Required Per Generic Ltr 82-33)
- ST-HL-AE-1605, Forwards Updated Schedule for Remaining Equipment Qualification Tests + (Forwards Updated Schedule for Remaining Equipment Qualification Tests)
- TXX-4142, Forwards Updated Schedule for Responses to SER Outstanding Issues,Confirmatory Issues & Licensing Conditions.Issues Include TMI Items III.A.1.2 Re Emergency Support Facilities, III.A.2 Re Emergency Preparedness & I.D.1 + (Forwards Updated Schedule for Responses to SER Outstanding Issues,Confirmatory Issues & Licensing Conditions.Issues Include TMI Items III.A.1.2 Re Emergency Support Facilities, III.A.2 Re Emergency Preparedness & I.D.1)
- ML20042G224 + (Forwards Updated Schedule for Review of Rev 0 to 61-002-P, Stability of Low Level Radwaste Solidified W/High Strength Asphalt)
- ML20136E491 + (Forwards Updated Schedule for St Lucie FY1)
- ML20132C765 + (Forwards Updated Schedule for Umtrap Remedial Action Plans, Eis/Environ Assessments & Remedial Action Const Start Milestones.Current Schedule Will Be Revised to Provide More Detailed Monthly Site Milestones)
- NRC-88-0238, Forwards Updated Schedule for Util Projected Operator License Exam & Annual Requalification Exams,Per Generic Ltr 88-13 + (Forwards Updated Schedule for Util Projected Operator License Exam & Annual Requalification Exams,Per Generic Ltr 88-13)
- ML20197E435 + (Forwards Updated Schedule of Activities for Tuba City,Az, Umtra Site.Informs That Schedule Supersedes One Transmitted on 870327)
- ML20053A242 + (Forwards Updated Schedule of Anticipated Completion Dates & Mods to Scram Discharge Piping.Completion Expected During Spring 1983 Refueling Outage)
- ML20148G166 + (Forwards Updated Schedule of App R Mods.Installation of Emergency Lighting Delayed Due to Problems Associated W/Installation of Batteries.Sys Will Be Functional by 880301)
- GO2-88-214, Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10 + (Forwards Updated Schedule of Commitments for Completion of Fire Protection Issues,Per Concerns Noted in Insp Rept 50-397/88-16 & Open Items Noted During Fire Protection Audit on 880606-10)
- ST-HL-AE-3359, Forwards Updated Schedule of Responses to NRC Generic Ltrs 83-28,88-17,88-20,89-05,89-06,89-07,89-08,89-10,89-12,89-13, 89-17,89-19 & 89-21 & Bulletins 88-001,88-008,88-010,88-011, 89-001,89-002,89-003,88-008,Suppl 1 & 88-010,Suppl 1 + (Forwards Updated Schedule of Responses to NRC Generic Ltrs 83-28,88-17,88-20,89-05,89-06,89-07,89-08,89-10,89-12,89-13, 89-17,89-19 & 89-21 & Bulletins 88-001,88-008,88-010,88-011, 89-001,89-002,89-003,88-008,Suppl 1 & 88-010,Suppl 1)
- ML20091J113 + (Forwards Updated Schedule of Submittal Dates for Remaining SEP Topic Evaluation Items,Per 830810 Transmittal of 35 Items Requiring Refined Engineering Analyses or Continued Evaluations)
- ML20101S194 + (Forwards Updated Scheduled Completion Dates for NRC Emergency Plan Appraisal App a Items)
- ET-NRC-93-3800, Forwards Updated Schedules for AP600 Testing Program to Reflect Progress in AP600 Testing Program as of 930108 + (Forwards Updated Schedules for AP600 Testing Program to Reflect Progress in AP600 Testing Program as of 930108)