Forwards Updated Safety Issues Index Incorporating NRC 930624 Comments
ML20045J238
Person / Time
Site: 05200001
Issue date: 07/08/1993
From: Fox J
GENERAL ELECTRIC CO.
To: Malloy M
NRC
References
NUDOCS 9307230220
Download: ML20045J238 (6)


Text

'

JUL OB '93 80317AM G E NUCLEAR BLDG J P.1/6 7

/

K GENaciesEnergy

\\

'W ABWR.

~

) C' Date,la le s To Fax No.

M e imcla M milow tift 7

~~

Thispageplus 5 page(s)

From J a ck Fo x Maii code 75t 175 Curtner Avenue San Jose. CA 95125 Phone (408)925 4 62 4 FAX (408) 925-1193 -

or (408) 925-1687 1

i Subject Safdw Tssuea L d u a

Message A bcM

\\ s a w u ra d a b e el s w Ae.x 6 ci s.ahb

,ssu4s

\\wCo(pcro 42. f v a tA W.

C O mvw&w, S_

J c44/93 ( F Ab,

OL C <

l 9307230220 930708 I$$

PDR ADOCK 05200001

[]):>

w A

PDR rmeu enn-on-inni--------

n3-n.-a,

,,,,,,u

,n,

su ee sa le:17an c c mctraa Btoc 2 e.z s-ABWR umms Standa'rd Plant Table 19B.11 SAFETY ISSUES INDEX NRC SSAR

~

Title Priority Subsection Generle hinec A 1 WaterHammer Resolved 19B12 A-7 MarkI Long Term Program Resolved 19B13 A-B MarkIContainmentPoolDynamicLoads Longterm Program Resolved 19B14 A 9 A'nVS Resolved 19B 15 A-10 BWR Fcedwater Nozzle Cracking Resolved 19B16 A 13 SnubberOperability Assurance Resolved 19B.2.7,

A-24 Qualification of Class IE Safety Related Equipment Resolved 19B.2.8 A-25 Non-Safety Loads on Class IE Power Sources Resolved 19B19 A-31 RHR Shutdown Requirements Resolved 19B.2.10 A 35 Adequacy of Offsite Power Systems Resolved 19B.2.11 A-36 Control of Heavy Loads Near Spent Fuct Resolved 19B.2.12 A-39 Determination of Safety Relief Valve Pool Dynamic Lozds and Temperature Limits Resolved 19B113 A 40 Seismic Design Criteria - Short Term Program Resolved 19B.2.14 A-42 Pipe Cracks in Boilmg Water Reactors Resolved 19B.2.15 A-44 Station Blackout Resolved 198116 A47 Safety Implications of Control Systems Resolved 19B117 -

A-48 Hydrogen Control Measures and Effects of Hydrogen Burns on Safety Equipment Resolved 19B.2.18 B-10 Behavior of BWR Mark III Containments Resolved 19B.2.19 B 17 Criteria for Safety Related Operator Actions Resolved COL App.

B 36 Develop Design, Testing and Maintenance Criteria for Attnosphenc Cleanup System Air Filtration and Absorption Units for Enginected Safety Feature Systems and for Normal Ventilation Systems Resolved 19B121 B 55 Improved Reliability of Target Rock Safety Relief Valves Resolved 19B.2.22 B 56 DieselReliability Resolved 19B.2.23 B-61 Allowable ECCS Equipment OJtage Periods Resolved 19B124 B 63 Isolation of Low Pressure Systems Connected to the Reactor Coolant pressure Boundary Resolved 193.2.25 B-66 Control Room Infiltration Measurements Resolved 19B126 C-1 Assurance of Continuous Long Term Capability of Hermetic Scals on Instmmemation and Electrical Equipment Resolved 19B.2.27 C 10 Effective Operation of Containment Sprays in aLOCA Resolved 19B.2.28 C-1~7 Interim Acceptance Criteria for Solidification Agents for Radioactive Solid Wastes Resolved 19B.2.29 New Generic femet i

15 Radiation Effects on Reactor Vessel Supports High 19B.230 i

23 Rcactor Coolant Pump Seal Failures High 19B.231 25 Automatic Air Header Dump on BWR Scram System Resolved 19B132 1

40 Safety Concems Associated with Pipe Breaks in the BVG Scram System Resolved 19B.233 2

193.![

PROM 402-c25-!EB*t--------

07-02-93 t2:24 PM P02 j

JUL 08 '93 80:$BAM G E NJCLEAR BLDG J P.3/6 4

ABWR moms

^

Standard Plant Table 19B.1-1 SAFETY ISSUES INDEX (Continued)

NRC SSAR Title Priority Subsection New Generic Issues (Continued) 45 Inoperability of Instmmentation Due to Extreme Cold Weather Resolved 19B134 51 Proposed Requirements for Improving the Reliability of Open Cycle Service Water Systems Resolved 19B.2.35 57 Effects of Fire Protection System Actuation on Safety-Related Equipment Resolved 19B.2.36 67.3.3 Improved Accident Monitoring Resolved 19B.237 73 Detached Thermal Sleeve Resolved 19B.2.37.1 75 Generic Implications of ATWS Events at the Salem Nuclear Plant Resolved 19B.2.38.

~ ~

78 Monitoring of Fatigue Transient Limits for Reactor Coolant System Resolved 19B139 79 Unanalyzed Reactor Vessel 'Ihermal Stress During Natura!

Convection Cooldown Resolved 19B.2.39.1 83 Control Room Habitability Near Res.

19B.2A0 66 Long Range Plan for Dealing with Stress Corrosion Cracking in BWR Piping Resolved 19B.2.41 87 Failure of HPCI Steam Line Without Isolation Resolved 19B.2A2 89 Stiff Pipe Clamps Medium 19B.2A3 103 Design for Probabic Maximum Precipitation Resolved 19B144 105 Interfacing Systems LOCA at BWRs High 19B.245 106 Piping and Use of Highly Combastibic Gases in Vital Areas Medium 19B.2A6 118 Tendon Anchonige Failure Resolved 19B148 120 On-Line Testability of Protection Systems Medium 19B.2A9 121 Hydrogen Control for Large. Dry PWR Containments Resolved 19B.2.50 124 Auxiliary Feedwater System Reliability itesolved 19B151 128 Electrical Power Reliability Resolved 19B.2.52 142 Leakage Through Electrical isolators in Instrumentation Circuits Medium 19B.2.53 143 Availability of Chilled Water Systems and Room Cooling High 19B.2.54 1

145 Actions to Reduce Common Cause Failures in BWRs Resolved 19B.2.55 151 Reliability of Anticipated Transient without Scram Recirculation Pump Trip Resolved 19B156 l

153 Loss of Essential Service Water in LWRs High 19B.2.57 l

155.1 More Realistic Source Term Assumptions Near Res.

19B.2.58

}inmgL Factors Isnues l

HF.1.1 Shift Staffing Resolved COL App.

HF.4.4 Guidelines for Upgrading Other Procedures High COL App.

HF.5.1 Local Control Stations High COL App.

HF.5.2 Review Criteria for Human Factors Aspects of Advanced Cont:ol and Instrumentation High COL App.

Issues Resolved With No New Reoutrements A-17 SystemsInteraction Resolved 19B159 A-29 Nudear Power Plant Design for Reduction of Vulneralbility j

to Industrial Sabotage Resolved 19B.2.60 l

Amendmcos 193.1 4

1 L

___--_l M_'

_il- _1? M 1 ~_ _-- - --- ---_-- _-- _.- --.--.------- --- _- -


J

..,x,

.2m m.w a.4 JL.R. 08 093. 80188AM G E tOCLEAR BLDG J P.4/6 ABWR unimAs Standard Plant Table 19B.11 SAFETY ISSUES INDEX (Continued)

NRC SSAR Title Priority Subsection Issues Resolved With No New Reautrements (Continued)

B-5 Ductility of Two Way SW and Shells and Buckling Behavior of StcclContainments Resolved 19B.261 29 Bolting Degradation or Failure in Nuclear Power Plants Resolved 19B.2.62 82 Beyond Design Bases Accidents in Spent Fuel Pools Resolved 19B.2.63 113 Dynamic Qualification Testing of Large Bore Hydraulic Snubbers Resolved 19B.2.64.

~~

TMI Issues 1.A.1.1 ShiftTechnical Advisor Resolved COL App.

l.A.I.2 Shift Supervisor Administrative Duties Resolved COL App.

I.A.13 Shift Manning Resolved COL App.

I.A.I.4 Long-Term Upgrading Resolved COL App.

1.A.2.1(1) Qaalifications. Experience Resolved COL App.

LA.2.1(2) Training Resolved COL App.

LA.2.1(3) Facility Certification of Competence and Fitness of Applicants for Operator and Senior Operator Licenses Resolved COL App.

LA.2.3 ' Administration of Training Programs Resolved COL App. "

LA.2.6(1) Rcvise Regulatory Guide 1.8 Resolved COL App.

I.A.3.1 Revise Scope of Criteria for Licensing Examinations Resolved COL App.

LA.4.1(2) Interim Changes in Training Simulators Resolved COL App.

LA.4.2(1) Research on Training Simulators Resolved 19A.2.13 1.A.4.2(2 ) Upgrade Training Simulator Standards Resolved 19A.2.13 LA.4.2(3) Regulatory Guide on Training Simulators Resolved 19A.2.13 LA.4.2(4) Review Simulators for Conformance to Criteria Resolved 19A.2.13 LC.l(l) Small Break LOCAs Resolved -

COL App.

LC.l(2) Inadequate Core Cooling Resolved COL App.

LC.1(3) Transients and Accidents Resolved 1A.2.1

' I.C.2 Shift and Relief Tumover Procedures Resolved' COL App.

LC.3 Shift Supervisor Responsibilitics Resolved COL App.

LC.4 ControlRoom Access Resolved COL App.

LC.5 Procedures for Feedback of Operating Experience to Plant Staff Resolved 19.A.2.41 LC.6 Procedures for Verification of Correct Perfonnance of Operating Activities Resolved COL App.

LC.7 NSSS Vendor Review of Procedures Resolved COL App.

LC 8 Pilot Monitonng of Selected Emergency Procedures for Near.

Term Operating License Applicants Resolved COL App.

LD.) Control Room Design Reviews Resolved 1 A.2.2 1.D.2 Plant Safety Parameter Display Console Resolved 1 A.2.3 LD.3 Safety System Status Monitoring Medium 19A.2.17 LD.5(2) Plant Status and Post-Accident Monitoring Resolved 19B.2.65

!.D.5(3) On-Line Reactor Surveillance System NearRes.

19B.2.66 LF.2(2) Include QA Personnc! in Review and Approval of Plant Procedures Resolved 19A.2.43 LF.2(3) Include QA Personnel in all Design, Construction, Installation, Testing, and Operation Activities Resolved 19A.2.43 knendment 19B.14

p.Xt-A

.M-u Jul as osa' ae:19AM G E tOCLEAR BLDG J.

P.9/6

~ ~'

1ABWR o

. mms E

Standafd Pinnt -

Table 19B.1-1 SAFETY ISSUES INDEX. (Continued) a

'NRC'

'SSAR Title Priority Subsection '- -

TMI Insnes (Continued)

I.F.2(6) Increase the Site of Licensees' QA Staff Resolved 19A.2.43 1.F.2(9) Clarify Organizational Reporting Levels for the QA Organhation Resolved 19A.2.43 -

a I.O.1 Training Requirements Resolved 1.A.2.4 1.02 Scope of Test Program Resolved 19B.2El D.B.1 Reactor Coolant System Vents Resolved 1A15 II.B.2 Plant Shiciding to Provide Access to Vital Areas and Protect Safety Equipment for Post-Accident Operation Resolved '

1A16 II.BJ Post Accident Sampling Resolved 1A.2fl

  • II.B.4 Training for Mitigating Core Damage Resolved COL App..

II.B.8 Rulemaking Proceeding on Degraded Core Accidents Resolved 19A.2.21 II.D1 TestingRequirements Resolved

' 1 A.2.9 U.D3 Relief and Safety Valve Position Indication Resolved

, IA110 U.E.13 Update Standard Review Plan and Develop Regulatory Guide Resolved COLApp.

D.E.4.1 DedicatedPenetrations Resolved '

1A113 II.E.4.2 Isolation Dependability Resolved 1A114 II.E.6.1 Test Adequacy Study Resolved 19B.2.68 H.F.1 Additional Accident Monitoring instrumentation Resolved 1A115 II.P.2 Identification of and Recovery from Conditionsleading to Inadequate Core Cooling Resolved 1A116 II.F3 Instruments for Monitoring Accident Conditions Resolved -

.1 A.2.17 DJ.4.1 Revisc Deficiency Reporting Requirements Resolved -

COL App.

D.K.1($) Safety.Related Valve Position Description Resolved -

1A 118 II.K 1(10) Revicw and Modify Procedures for Removing Safety-Related Systems from Service Resolved 1A.2.19 II.K.1(13) Propose Technical Specifications Changes Reflecting implementation of All Bulletin Items Resolved 19B.28 II.K.1(22) Describe Automatic and Manual Actions for Proper Functioning of Auxiliary Heat Removal Systems When FW System Not Operable Resolved 1A.2.20 II.K 1(23) Describe Uses and Types of RV LevelIndication for Automatic and ManualInitiation Safety Systems Resolved 1A.2.21 U.IJ(3) Report Safety and Relief Valve Failures Promptly and Challenges Annually Resolved 1A.2.21J II.KJ(11) Control Use of PORY Supplied by Control Comnponents, Inc. Until Further Review Complete Resolved 19B.2.70 -

II.K3(13) Separation of HPCI and RCIC System Initiation Levels Resolved 1 A.2.22 II.K3(15) Modify Break Detection Logic to Prevent Spurious Isolation 1 A.2.23 of HPCI and RCIC Systems Resolved 11.K3(16) Reduction of Challenges and Failures of ReEef Valves-Feasibility Study and System Modification Resolved 1A.2.24 11.K3(17) Report and Outage of ECC Systems - Licensee Report and

_ Resolved 1A125 TechnicalSpecification Changes II.KJ(18) Modification of ADS logic -Feasibility Study and

. Modification for Increased Diversity for Some Event Sequences Resolved 1A.226 11.K3(21) Restart of Core Spray and LPCI Systems on Low Level -

Design and Modification P.esolved 1A127 y

atf u, am-

. a,n......

e,_e._.,

u.....

JUL'08 093. 10:19AM G E tiXLEAR BLE S

.P.6/6 ABWE

mome

'Sinndard i ant Table 19B.1-1' y

SAFETY ISSUES INDEX (Continued)

i NRC SSAR Title Priority Subsection. '

TMI Issues a

~

H.K3(22) Automatic Switchover of RCIC System Suction-Verify 1A.238 Procedures and Modify Design Resolved II.K3(24) Confirm Adequacy of Space Cooling for HPCI and RCIC Systems

. Resolved 1 A.2.29 :

.,t H.K3.(25) Effect of Loss of AC Power on Pump Seals Resolved 1 A.230.

t H.K3(27) Provide Common Reference Level for Vessel Lcyc1 Instrumentation Resolved -

1 A.2.21 -

H.K3(28) Study and Verify Qualification of Accumulators on ADS Valves Resolve /l 1A.231 II.K3(30) Revised Small. Break LOCA Methods to Show Compliance

~ ~

with 10 CFR 50, Appendix K Resolved 1A.232 H.K3(31) Plant. Specific Calculations to Show Compliance with '

1 10 CFR 50.46

' Resolved 1A.233 U.KJ(44)- Evaluation of Anticipated Transients with Single Failure to Venfy No Significant Ftsel Failure Resolved I A.233.1 :

H.K3(45) Evaluate Depressurir.ation with Other Than Full ADS.

Resolved IA.233.2 H.KJ(46) Response to List of Concerns from ACRS Consultant

' Resolved IA.2333 IH.A.I.1(1) Implement Action Plan Requirements for Promptly Improving Licensee EmergencyPrepardness Resolved COL App.

Ill A.1,2(1) Technical Support Center Resolved -

COL App..

m.A.1.2(2) On Site Operational Support Center Resolved

' COL App.

HI.A.I.2(3) Near Site Emergency Operations Facility

. Resolved

- COL App.-

r IH.A.2.l(l) Publish Proposed Admendments to the Rules Resolved COL App.

. HI.A.2.l(2) Conduct Public Regional Meetings Resolved -

COL App.

HI.A.2.l(3) Prepare Final Commission Paper Recommending

COL App.

Adopuon of Rules Resolved UI.A.2.l(4) Revise Inspection Progmm to Cover Upgraded Requirements Resolved COL App.

HI,A.2.2 Development of Guldance and Criteria.

Resolved COL App.

DI,A33(1) Install Direct Dedicated Telephone Lines Resobed COL App.

Hl.A33(2) Obtain Dedicated, Short-Range Radio Communication Systems Resolved COL App.

IH.D.1.l(l) Review Infonnation Submitted by Licensee Pertaining to Reducing leakage from Operating Systems Resolved 1A.234 ID.D33(1) Issue Letter Requiring Improved Radiation Sampling Instrumentation Resolved 19A.239 ID.D33(2) Set Criteria Requiring Licensees to Evaluate Need for Additional Survey Equipment Resolved 19A.239

!!I.D33(3) Issuc a Rule Change Providing Acceptable Methods for Calibration of Radiation Monitoring Instruments Resolved 19A.2.39 -

Hl.D33(4) Issue a Regulatory Guide Resolved 19A.2.39 lII.D3.4 Control Room Habitability Resolved 1A336

. 1 A82&nent 19B.1

^

o.

n.,.......

..._n,

...,,..i

.w