ML20080G103

From kanterella
Jump to navigation Jump to search
Forwards Updated Schedule for NRC Visits to Conduct Operator Licensing Exams for Period Ending 851231,per Generic Ltr 83-01
ML20080G103
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/07/1984
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
GL-83-01, GL-83-1, JPN-84-09, JPN-84-9, NUDOCS 8402130268
Download: ML20080G103 (3)


Text

123 Main Street WNte Plains. New York 10601 914 681 6200

  1. > NewYorkPbwer l=c=_

4# Authority

-o-February 7, 1984 JPN-84-09 Director of Nuclear Reactor Regulation U.

S.

Nuclear Regulatory Commission Washington, D.

C.

20555 Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Operator Licens_iy Exanination Site Visits Update

References:

1.

NRC Generic Letter No. 83-01, " Operator Licensing Examination Site Visits",

dated January ll, 1983.

2.

PASNY Letter, J.

P.

Bayne to D.

G.

Eisenhut, dated March 1, 1983,

" Response to Generic Letter No. 83-01" (JPN-83-18).

Dear Sir:

In response to the NRC's Generic Letter No. 83-01 (Reference 1),

I the Authority submitted a tentative schedule of requests for NRC visits to conduct operator licensing examinations covering the period ending December 31, 1985 (Reference 2).

The purpose of this letter is to provide an update to the schedule submitted in Reference 2.

If you have any questions, please contact Mr. J.

A.

Gray, Jr. of my staff.

Very truly yours,

)

?.

ayNG~~~

Executive Vice President Nuclear Generation cc:

Office of the Resident Inspector U.

S.

Nuclear Regulatory Commission 3pjg P.

O. Box 136 F

Lycoming, New Yors 13093 pI 8402130260 40707 PDR ADOCK 05000333 V

8 PDR

~

s.

ATTACHMENT TO JPN-84-09, February 7, 1984 JAMES A. FITZPATRICK NUCLEAR POWER PLANT ESTIMATED REQUESTS FOR NRC SITE VISITS FOR OPERATOR LICENSING EXAMINATION SCHEDULE Facility: James A. FitzPatrick NBC Region 1

FY 1984 (January 1,1984 -

S=:p 6 aur 30, 1985)

FY 1985' FY 1986 FY 1987

1. Date 3/19/84 Date 1/28/85 Date 1/6/86 Date 1/5/87
  1. RD 6

8 7

6

  1. SRO 7

6 2

2 l

~#SRO Upgrade 3

3 3

  1. Instructor Certification 1

2 1

  1. SRO. Limited to Fuel Handling I
2. Date 9/17/84 Date Date Date
  1. BD.

t-j

  1. SRO 1
  1. SIO Upgrade 2

.. # Instructor Certification

  1. SRO. Limited to Fuel Handling
3. Date Date Date Date
  1. RD l
  1. SRO
  1. SRO Upgrade l'

i Page 1 of 2-

. ~-

o ATTACHMENT TO JPN-84-09 February 7,

1984 JAMES A.

FITZPATRICK NUCLEAR POWER PLANT ESTIMATED REQUESTS FOR NRC SITE VISITS FOR OPERATOR LICENSING EXAMINATION SCHEDULE Facility: James A. FitzPatrick NRC Region 1

FY 1984 (January 1, 1984 -

September 30, 1985)

FY 1985 FY 1986 FY 1987

  1. Instructor

~.

Certification siSRO Limited to Fuel Handling Please indicate initial cold license examinations by placing an asterisk (*)

by the date. Please indicate examinations intended to extend an operator's

. license to a second or subsequent unit with tw asterisks (**)

(e.g., Unit One is in operation and Unit 'Iko is approaching fuel load). nree RO candidates with no previous license are to be examined on both Units one and Two and five RO candidates with licenses on Unit One are to be examined to extend their licenses to Unit Two. Indicate (2/15/85, RO 3,5**).

The above dates are tentative and the number of candidates is subject to change depending.on staffing requirements.

Page 2 of 2