Forwards Updated Schedule for App R Mods.Schedule Also Reflects Status of Recent Addl Mods Resulting from Fire Protection Shutdown/Cooldown Model Changes Described in Util .Concurrence on Revised Schedule Requested
ML20238A602
Person / Time
Site: Fort Saint Vrain 
Issue date: 08/21/1987
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To: Calvo J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
P-87267, NUDOCS 8708310141
Download: ML20238A602 (8)


Text

,

O Public Service-

= h idn'v$r7cYao201awo August 21, 1987 Fort St. Vrain R.O. WILLIAMS, JR.

Unit No. 1 VICE PRESIDENT P-87267 WCLEAR oPERAhoNS U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Attention:

Mr. Jose A. Calvo Director, Project Directorate IV Docket No.

50-267

SUBJECT:

Submittal of Current Construction Status for Appendix R Modifications

REFERENCE:

See Enclosure

Dear Mr. Calvo:

As indicated in Reference 1,

PSC committed to update the NRC periodically as to the construction status of our Appendix R modifications.

The attached condensed " Schedule of Appendix R Modifications" updates the status of these modifications, previously submitted in References 2 and 3,

as requested by the NRC in Reference 4.

The attached schedule also reflects the status of the recent additional modifications resulting from the Fire Protection Shutdown /Cooldown model changes described in Reference 5, and the fire detection system additions noted in Reference 3.

These new modifications include:

Item Description of New Modification References 4.4.a Emergency lighting, reissue required for model 5

changes 4.5.a Fire Detection; reissue for additional detectors 3

per NRC Inspection Report 50-267/87-12 4.10.k Cable Reroutes; Fire Water Pump Room Upgrade 5

4.11.e.1 Valve Operability; reissue for additional ladders 5

and/or platforms 4.11.g Valve Operability; chain operator for additional 5

manual valve added for model changes 4.14.b Shutdown procedures for revised Fire Protection 5

models 4.15 Main Steam 6" Vent Installation 5

4.16 Condensate Storage Tank Fire Hose Adapter and 5

Level Indication g

4.17 Repair of Deficient Penetration Seals per LER-87-006 6 0

hg 8708310141 070821 f[/

ADOCK 050g7 PDR F

P-87267_ August 21, 1987 i

It should be noted that Public Service Company of Colorado has recently completed a number of these,-.as shown in the attachment, and is aggressively working on the remaining Appendix R modifications.

The third Turbine Water Removal Pump, denoted as item 4.9, has been described in References 7 and 8 being a " full sized pump".

It has been -recently decided that this pump will be smaller than the existing pumps to minimize frequent cycling for better.

plant operation, while it will be capable _of performing its Fire Protection Shutdown /Cooldown functions. _While the existing two. Turbine Water Removal Pumps are seismically and environmentally qualified the third Turbine Water Removal Pump will not be qualified even though it has an essential power supply.

The Fire Water Pump Room upgrade (Item 4.10.k) is being delayed because of reprioritization associated with the six week circulator outage and certain material delays.

As discussed with Mr. K. Heitner and_Mr. D. Kubicki on July 22, 1987, the schedule for the installation of the emergency lighting (Item 4.4) must slip due to both the additional lighting resulting from the Fire Protection Shutdown /Cooldown model changes of May-15, 1987, and a significant underestimation of the amount uf construction labor needed to accomplish this task.

PSC is attempting to use the maximum feasible number of electricians in the area (s) being worked on in this effort, and is aggressively pursuing its completion.

The listed scheduled completion date of January 15, 1988 reflects the effects of both causes of schedule slippage on this. item.

PSC requests NRC concurrence with the attached revised schedule.

This schedule has had to be revised as a result of additional modification work added by the changes to the Fire Protection Shutdown /Cooldown models and unforseen problems, such as material delivery delays and priority changes. This schedule extends to the startup following the 4th refueling outage, and no further schedule changes are anticipated at this time.

Per Mr. K. Heitner's request, PSC will submit an Appendix R modification construction schedule to the NRC every six months until all Appendix R modification activities are completed.

If you have any questions on this matter, please contact Mr. M. H.

Holmes (303) 480-6960.

Very truly yours, R. O. Williams, Jr.

Vice President Nuclear Operations R0W/ RAS:bac

Enclosure:

As stated Attachment (1)

l P-87267. August 21, 1987 CC: Regional Administrator, Region IV

)

ATT: Mr. J. E. Gagliardo, Chief Reactor Projects Branch Mr. Kenneth Heitner Project Manager, NRR Mr. Dennis Kubicki Fire Protection Engineer l

Plant System Branch, NRR Mr. R. E. Farrell Senior Resident Inspector Fort St. Vrain 1

l 1

i l

i l

l I

1 l

l 1

l l

1 l

l

P-87267 August 21, 1987 ENCLOSURE

REFERENCE:

1). PSC letter, Williams to Berkow, dated November 20, 1986 (P-86597)

2) PSC letter, Williams to Calvo, dated April 29,1987(P-87160)
3) PSC letter, Warembourg to Calvo, dated May 15,1987(P-87167)
4) PSC letter, Miraglia to Williams, dated April 6,1987 (G-87118)
5) PSC letter, Williams to Calvo, dated June 8, 1987 (P-87210)
6) PSC letter, Williams to Document Control Desk, dated May 11, 1987 (P-87178) (LER #50-267/87-006)
7) PSC letter, Williams to Berkow, dated January 16, 1987 (P-87013)
8) PSC letter, Williams to Berkow, dated February 27, 1987 (P-87076) l 1

l l

l l

I

)

Attachment P-87267 page 1 of 3 SCHEDULE FOR APPENDIX R MODIFICATIONS

' ITEM DESCRIPTION STATUS (COMPENSATORYMEASURE) 4.1 FIRE D0 ORS MODIFICATION. COMPLETE 4.2 PENETRATION SEALS MODIFICATION COMPLETE 4.3 FIRE DAMPER MODIFICATION-COMPLETE' 4.4 EMERGENCY LIGHTING (a)

REISSUE REQUIRED FOR INSTALL BY JAN. 15, 1988 MODEL CHANGES (OPERATORS CARRY FLASHLIGHTS)'

4.5 FIRE DETECTION MODIFICATION COMPLETE (a)

REISSUE FOR ADDITIONAL DETECTORS INSTALL BY FEB. 1, 1988 *

(FIRE WATCH IN PLACE DURING INTERIM) 4.6 ACM BACKFEED TO THREE-ROOM INSTALL BY STARTUP COMPLEX FOLLOWING 4TH REFUELING (INTERLOCKJUMPER PROCEDURE'INPLACE) 4.7 VENTILATION DAMPER AIR BOTTLE MODIFICATION COMPLETE 4.8 PORTABLE VENTILATION FANS MODIFICATION COMPLETE 4.9 THIRD PERMANENT TURBINE WATER INSTALL BY STARTUP REMOVAL PUMP INSTALLATION FOLLOWING 4TH REFUELING (FIRE WATCH IN PLACE DURINGINTERIM) 4.10 CABLE REROUTES (a)

REACTOR PLANT EXHAUST FAN MODIFICATION COMPLETE.

(b)

BEARING WATER MAKEUP-MODIFICATION COMPLETE (c)

SURGE TANK LEVEL INSTRUMENTATION MODIFICATION COMPLETE (d)

FEEDWATER FLOW MONITORING MODIFICATION COMPLETE.

(e)

FEEDWATER FLOW ASSOC. CABLES MODIFICATION COMPLETE (f)

ACM FUEL OIL TRANSFER PUMP MODIFICATION COMPLETE

l Attachment P-87267 page 2 of 3 SCHEDULE FOR APPENDIX R MODIFICATIONS ITEM-DESCRIPTION STATUS (COMPENSATORYMEASURE)

(g)

HELIUM FLOW INSTRUMENT CABLES MODIFICATION COMPLETE (g.1)

HELIUM FLOW INSTRUMENT FUSES-MODIFICATION COMPLETE (h)

MAIN STEAM TEMP. INDICATION MODIFICATION COMPLETE l

(1)

BEARING WATER PUMPS MODIFICATION COMPLETE ~

(j)

EMERGENCY WATER B0OSTER PUMP MODIFICATION COMPLETE (k)

FIRE WATER PUMP ROOM UPGRADE INSTALL BY OCT, 1, 1987 (FIRE WATCH IN PLACE DURINGINTERIM) 4.11 VALVE OPERABILITY (a)

. ACCUMULATOR / ACTUATOR MODIFICATION MODIFICATION COMPLETE (b)

VALVE OPERATOR AIR BOTTLES MODIFICATION COMPLETE (c)

LOCAL CONTROL VALVES MODIFICATION COMPLETE (d)

LADDERS MODIFICATION' COMPLETE (e.1)

ADDITIONAL LADDERS / PLATFORMS LADDER INSTALLATION FOR REVISED MODEL COMPLETE PLATFORM BY FEB 1,~1988 (TEMPPLATFORM INSTALLED)

(f)

VALVE TAGGING INSTALL BY JAN. 15, 1988 FOR REVISED MODEL (N0 COMPENSATORY MEASURESAPPROPRIATE)

(g)

CHAIN OPERATOR FOR INSTALL BY OCT, 1, 1987 ADDITIONAL MANUAL VALVE (LADDERNEARVALVE) 4.13 ACM DIESEL TECH. SPECS.

COMPLETE (DRAFT TO NRC) 4.14(a)

SHUTDOWN PROCEDURES (0RIGINAL COMPLETE MODEL)

(b)

SHUTDOWN PROCEDURES (REVISED COMPLETE j

MODELS)

y

'I

. Attachment P-87267 1

page 3 of 3 SCHEDULE FOR APPENDIX R MODIFICATIONS ITEM DESCRIPTION STATUS (COMPENSATORYMEASURE)

(c)

SPECIAL REPAIR PROCEDURES COMPLETE (INCLUDING FIRE WATCH) 4.15 MAIN STEAM 6" VENT-INSTALLATION

'(a)

LOOP 1 MODIFICATION COMPLETE (b)

LOOP 2 MODIFICATION COMPLETE 4.16 CONDENSATE STORAGE TANK FIRE MODIFICATION COMPLETE i

HOSE ADAPTER AND LEVEL INDICATION 4.17 REPAIR OF DEFICIENT PENETRATION JAN. 15, 1988 SEALS PER LER-87-006 (FIRE WATCH IN PLACE DURINGINTERIM)

This modification will be complete as soon as the electricians working on the emergency lighting modification (item 4.4) become available.

I

h 4

e Bd e.

cm a

9g 1

~h jp

% gp I

_ _ _ _