MONTHYEARML20083M9351984-04-12012 April 1984 Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418 Project stage: Other ML20084H4571984-04-25025 April 1984 Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion Regreased Project stage: Other ML20084P5941984-05-0707 May 1984 Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon Request Project stage: Other ML20092D9271984-06-15015 June 1984 Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as Ref Project stage: Other ML20093J1171984-07-20020 July 1984 Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety Question Project stage: Request ML20094R4001984-08-0909 August 1984 Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930 Project stage: Other ML20096C9081984-08-20020 August 1984 Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv Listed Project stage: Other ML20107K2301984-10-18018 October 1984 Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture Measurements Project stage: Other ML20112D7361984-12-14014 December 1984 Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods Necessary Project stage: Other ML20106B6131985-01-31031 January 1985 Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results Project stage: Meeting ML20106B5791985-01-31031 January 1985 Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW Warembourg Project stage: Other ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart Project stage: Other ML20128N2861985-05-20020 May 1985 Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & Inspected Project stage: Other ML20126C5211985-05-23023 May 1985 Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable Project stage: Other ML20127K1371985-06-0707 June 1985 Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests Negative Project stage: Other ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys Project stage: Other ML20138A8071985-07-0202 July 1985 Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart Project stage: Approval ML20138A8551985-07-0202 July 1985 Safety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for Restart Project stage: Approval ML20132G4501985-07-0808 July 1985 Forwards Safety Evaluation Re Pcrv Prestressing Tendon Wire Corrosion Problems.Submittals & 0614 Acceptably Resolve Concerns.Lasl Evaluation Rept Encl Project stage: Approval ML20132G4761985-07-0808 July 1985 Safety Evaluation Re Pcrv Tendon Corrosion Investigation & Proposed Remedy.Tendon Surveillance Proposal Acceptable Project stage: Approval ML20235N1121987-07-0909 July 1987 Forwards Lasl Technical Evaluation Rept, Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Rept Project stage: Other ML20154A5421988-08-30030 August 1988 Requests Addl Info Re Rev 7 to Schedule Commitment Items on Pcrv Tendon Surveillance Involving Provision of Schedule for Conducting Evaluation within 45 Days for Pcrv Tendon Degradation Project stage: Other 1985-01-31
[Table View] |
Text
_.
July 2, 1985 1
MEMORANDUM FOR:
Richard P. Denise, Director h
Division of Reactor Safety and Projects Region IV FROM:
Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation
SUBJECT:
FORT ST. VRAIN TENDON CORROSION - SAFETY EVALUATION i
(UPDATED) 1.
TIA 85-01 dated January 2, 1985 2.
Memorandum from J. R. Miller and E. Johnson to F. Miraglia dated February 5,1985 on Operating Plan for Fort St. Vrain Restart Review.
3.
Memorandum from H. L. Thompson to R. P. Denise dated May 21, 1985 on Fort St. Vrain Tendon Corrosion SE.
Enclosed is our updated Safety Evaluation (SE) concerning the review of the corrosion of the Fort St. Vrain (FSV) tendons. This SE is in response to Item 5 of TIA 85-01 (Reference 1) and our operating plan for conducting this review (Reference 2). This SE updates our earlier SE on this subject (Reference 3).
The reviewer for this SE is Harold Polk, SGEB (FTS 492-8426). This review is based on a TER supplied by Los Alamos National Laboratory, which was supplied O
in Reference 3.
The staff accepts the licensee's commitments concerning tendon surveillance as a basis for plant restart.
In addition, the licensee has comitted to incorporate the modified tendon surveillance program into the Technical Specifications and provide the NRC with the results of the tendon surveil-lance program six months after plant restart. The licensee has also addressed the potential for anchorage stress washer failure.
We have found that these items provide an acceptable basis for plant restart.
Original Signed by i
Hugh L Thompson, Jr.
Nft dM $$$67 Hugh L. Thompson, Jr., Director P
PDR Division of Licensing Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION:
As stated DOCKET FILE PMKreutzer NRC PDR EJButcher I
CONTACT:
Local PDR GClainas K. Heitner ORB #3 Rdg HThompson
.X27364 KHeitner N
ORB #3:DL M 0
k)L AD
- DL
- DI j
ORB #3:DL PKreutzer KHeitner:dd EdB her GC nas HThompson 6/%/85 6/14/85 6/jo/85