Results Other: ML20083M935, ML20084H457, ML20084P594, ML20092D927, ML20094R400, ML20096C908, ML20106B579, ML20107K230, ML20112D736, ML20126C521, ML20127K137, ML20127N695, ML20128N286, ML20132G502, ML20154A542, ML20235N112 | |
MONTHYEARML20083M9351984-04-12012 April 1984
[Table View]Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418 Project stage: Other ML20084H4571984-04-25025 April 1984 Forwards Relaxation Curves for Prestressed Concrete Reactor Vessel Tendon Sys,In Response to 840419 Request.No Immediate Mechanism for Controlling Sleeve Atmosphere Provided.Areas W/Indicated Corrosion Regreased Project stage: Other ML20084P5941984-05-0707 May 1984 Forwards Pcrv Tendon Sys Relaxation Curves Containing Min Design Lines,Per H Polk 840503 Telcon Request Project stage: Other ML20092D9271984-06-15015 June 1984 Responds to Requesting Details of Proposed Tendon Surveillance Program.Program Consists of Load Cell Data & Visual Insps.Surveillance Started on 840601.Program Developed Using Reg Guide 1.35 as Ref Project stage: Other ML20093J1171984-07-20020 July 1984 Forwards Rev 2 to Updated FSAR for Fort St Vrain.Rev Includes Safety Evaluations Either in Support of License Amends or in Support of Conclusions That Changes Did Not Involve Unreviewed Safety Question Project stage: Request ML20094R4001984-08-0909 August 1984 Confirms 840806 Telcon on Tech Spec Change Request Re Tendon Corrosion & Anchor Assembly Surveillance.Tech Spec Change Request Will Be Submitted by 840930 Project stage: Other ML20096C9081984-08-20020 August 1984 Responds to Re Possible Design Mods to Pcrv Tendons & Details of Evaluations & Schedule of Completion of Repts Detailing Results of Metallurgical Exams.Actions Necessary to Evaluate Design Mods for Pcrv Listed Project stage: Other ML20107K2301984-10-18018 October 1984 Updates Tendon Investigations & Corrosion Prevention Programs.Efforts Concentrated on Corrosion Prevention Methods Rather than Detailed Moisture Measurements Project stage: Other ML20112D7361984-12-14014 December 1984 Forwards Tendon Accessibility Info,Rationale for Tendon Surveillance & Info Re Corrosion Mechanism in Response to 840720 & 1029 Requests for Addl Info.Tendons Considered Acceptable If No Major Mods Necessary Project stage: Other ML20106B6131985-01-31031 January 1985 Discusses Visual Insp of Top Longitudinal Tendons,Per 850115 Meeting Request.Visual Insp of 30% of Longitudinal Tendons for Buttonheads Noted.Inconsistency Exists Between Last Mapping of Raised Buttonheads & Current Insp Results Project stage: Meeting ML20106B5791985-01-31031 January 1985 Submits Plans for Implementing Interim Tendon Surveillance Program,In Response to Concerns.Surveillance Program Will Be Based on Proposed Tech Spec SR 5.2.2,submitted in DW Warembourg Project stage: Other ML20132G5021985-03-12012 March 1985 Evaluation of CRD Mechanism & Reserve Shutdown Sys Failures & Pcrv Tendon Degradation Issues Prior to Fort St Vrain Restart Project stage: Other ML20128N2861985-05-20020 May 1985 Informs of Intent to Conduct Addl Insps of Random Sample of Pcrv Bottom Head Longitudinal Tendon Anchor Assemblies. Thirty-four Longitudinal Bottom End Caps Accessible.Ten End Caps Will Be Removed & Inspected Project stage: Other ML20126C5211985-05-23023 May 1985 Discusses Investigation of Methods to Control Tendon Corrosion Involving Establishment of Nitrogen Blanket on Pcrv Tendon Sys.Establishing & Maintaining Overall Nitrogen Blanket Sys for Tendons Highly Questionable Project stage: Other ML20127K1371985-06-0707 June 1985 Discusses Insp of 10 Bottom Longitudinal Tendon End Caps. Tendons Visually & Magnetic Particle Inspected for Evidence of Corrosion,Concavity,Water,Apparent Failures & Cracking.No Raised Buttonheads Found.All Tests Negative Project stage: Other ML20127N6951985-06-14014 June 1985 Elaborates on Util Commitments to Listed Plant Activities, Including CRD Mechanism Temp Recording,Requalification, Surveillance & Preventative Maint,Backup Reactor Shutdown Procedure,Tendons & Pcrv Integrity & Electrical Sys Project stage: Other ML20138A8551985-07-0202 July 1985 Safety Evaluation Accepting Util Tendon Surveillance Proposal.Proposal Will Lead to Maintaining Structural Integrity of Reactor Vessel.Plant Structurally Ready for Restart Project stage: Approval ML20138A8071985-07-0202 July 1985 Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart Project stage: Approval ML20132G4501985-07-0808 July 1985 Forwards Safety Evaluation Re Pcrv Prestressing Tendon Wire Corrosion Problems.Submittals & 0614 Acceptably Resolve Concerns.Lasl Evaluation Rept Encl Project stage: Approval ML20132G4761985-07-0808 July 1985 Safety Evaluation Re Pcrv Tendon Corrosion Investigation & Proposed Remedy.Tendon Surveillance Proposal Acceptable Project stage: Approval ML20235N1121987-07-0909 July 1987 Forwards Lasl Technical Evaluation Rept, Technical Assistance for Fort St Vrain Task Ii:Pcrv & Pcrv Tendon Evaluation, Final Rept Project stage: Other ML20154A5421988-08-30030 August 1988 Requests Addl Info Re Rev 7 to Schedule Commitment Items on Pcrv Tendon Surveillance Involving Provision of Schedule for Conducting Evaluation within 45 Days for Pcrv Tendon Degradation Project stage: Other 1985-01-31 |
ML20138A807 | |
Person / Time | |
---|---|
Site: | Fort Saint Vrain |
Issue date: | 07/02/1985 |
From: | Thompson H Office of Nuclear Reactor Regulation |
To: | Denise R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
Shared Package | |
ML20138A811 | List: |
References | |
TAC-54639, NUDOCS 8510110089 | |
Download: ML20138A807 (1) | |
Similar Documents at Fort Saint Vrain | |
---|---|
Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20212G5351999-09-27027 September 1999
[Table view]Forwards Signed Original Confirmatory Order (Effective Immediately)(Morrison Knudsen Corp,Cleveland,Oh) for Transmittal to Ofc of Fr for Publication.Without Encl ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20202D5011997-11-28028 November 1997 Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum ML20141C8691997-05-0505 May 1997 Forwards Notice for Transmittal to Ofc of Fr Re Issuance of License Amend for Psc,Fort St Vrain Nuclear Generating Station Re Redesignated Approved Decommissioning Plan, & Approved Final Radiation Survey Plan ML20136D6041997-03-0404 March 1997 Forwards Signed Original of FRN for Transmittal to Ofc of Federal Register for Publication ML20134G2511996-11-0505 November 1996 Forwards Notice of Forthcoming Meeting W/Psc on Decommissioning & License Termination of Fsv ML20134F8951996-11-0505 November 1996 Notification of 961203 Meeting W/Public Service Co of Co in Rockville,Md to Discuss Decommissioning & License Termination of Fort St Vrain ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility ML20137H1331995-12-29029 December 1995 Responds to Request of 951108 for Investigative Assistance in Interviewing R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians at Fort St Vrain,Oi Case A4-95-064 ML20137H2951995-11-21021 November 1995 Forwards Copies of Transcripts of R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians Case A4-95-064.W/o Encls ML20136B2301995-11-17017 November 1995 Forwards Repy to NOV ML20136B1831995-08-31031 August 1995 Discusses Proposed Meeting Re OI 4-95-015 ML20136B1711995-08-31031 August 1995 Agrees W/Office of Enforcement Regional Approach ML20136B2121995-08-30030 August 1995 Confirms 950911 for OI Meeting Re OI 4-95-015 ML20136B1901995-08-30030 August 1995 Ack Receipt of Mail ML20137H2651995-08-25025 August 1995 Forwards Copy of OI Rept Where Investigation Did Substantiate That Seg Technician Deliberately Failed to Perform Response Checks in Accordance W/Procedures.W/O Encl ML20136B1661995-08-17017 August 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Records.W/O Encl ML20136B2191995-08-0707 August 1995 Informs That Enforcement Action Will Be Required Re OI 4-95-015 Concerning Failure to Perform Response Checks ML20136B1581995-06-20020 June 1995 Requests That General Counsel Anlayze Rept & Determine Whether Sufficient Evidence Exists to Take EA Re Falsification of Records ML20137H2551995-06-0303 June 1995 Forwards Copy of OI Rept,Reviewing Licensee Investigation Rept & Confirmed Licensee Conclusions That Radiation Survey Records & Radiation Work Permits Falsified.W/O Encl ML20136B1471995-05-26026 May 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Radiation Survey Records ML20137K0111995-04-20020 April 1995 Discusses Verbal DOJ Declination of Prosecution Re Public Svc Co of Colorado,For Plant ML20137K0781995-04-12012 April 1995 Documents Events Surrounding Segs Placement of Problematic Radiation Protection Technician on Administrative Leave ML20137K0611995-04-12012 April 1995 Documents Events Surrounding Discovery of Barrels Being Shipped from Plant to Richland Disposal Facility W/Different Radiation Exposure Readings than Were Listed on Shipping Manifest NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20137J8251994-04-14014 April 1994 Discusses Chronology of Events Since Preliminary Notification of Event or Unusual Occurrence Case 4-94-010 ML20137S2081994-03-28028 March 1994 Discusses 940325 Telcon from Listed Licensee & Contractor Personnel Re Rept of Falsified Survey Records IA-97-311, Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl1993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20198H5751993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20058B1681993-11-18018 November 1993 Notification of 931109 Meeting W/Psc in Rockville,Md to Discuss Fort St Vrain Decommissioning Status ML20059C2741993-10-25025 October 1993 Notification of Significant Licensee Meeting W/Util on 931116 to Discuss Decommissioning Status of Plant ML20058N9831993-10-0606 October 1993 Notification of 931109 Meeting W/Util in Rockville,Md for Briefing on Status of Plant Decommissioning ML20127D3281993-01-12012 January 1993 Notification of 930128 Meeting W/Util in Rockville,Md to Brief NRC on Plant Decommissioning Status ML20126A3141992-11-27027 November 1992 Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program ML20127L8411992-11-27027 November 1992 Forwards Insp Plan for Facility Which P Michaud Developed for Current Fy Ending on 930930.Plan Based on Mc 2560, Decommissioning Insp Program ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20055F7381990-07-16016 July 1990 Notification of 900725 Meeting W/Util in Rockville,Md to Discuss Plant Status & Plans for Final Defueling & Decommissioning ML20248E8301989-09-26026 September 1989 Notification of 891013 Meeting W/Util in Rockville,Md to Discuss Plant Spent Fuel Storage.Agenda Encl ML20247J6831989-09-18018 September 1989 Forwards Comments on Facility Preliminary Decommissioning Plan,Per 890803 & 21 Memos Re Transfer of Regulatory Authority for Reactor Decommissioning ML20246F1871989-08-24024 August 1989 Summary of 890803 Meeting W/Util in Rockville,Md Re Preliminary Decommissioning Plan of 890630 for Plant.Related Info,Including List of Attendees & Util Info Re Use of Tax Deduction in Calculation of Funding Requirements Encl ML20245G5541989-08-0808 August 1989 Requests Support in Conducting Review of Plant Preliminary Decommissioning Plan.Areas to Be Reviewed,Requested Reviewers & Tentative Review Schedule Encl ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247K6271989-07-24024 July 1989 Forwards Revised Filing Instructions for Rev 7 to Updated FSAR ML20246L7971989-07-17017 July 1989 Submits Daily Highlight.Notifies of of 890718 Meeting W/Util in Rockville,Md to Discuss Defueling of Plant & Tech Spec Upgrade Program ML20246L3741989-07-12012 July 1989 Notification of 890803 Meeting W/Util & State of Co in Rockville,Md to Discuss Preliminary Decommissioning Plan ML20247H6041989-05-29029 May 1989 Requests Encl Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Power Reactors, Task CE 025-4 Be Forwarded to Util for Use in Preparing Preliminary Decommissioning Plan for Plant ML20247D7421989-03-27027 March 1989 Forwards FEMA 890313 Memo Transmitting FEMA Region Viii Update Rept of 870805 Exercise.Rept Includes Results of Remedial Drill Conducted on 880830 & Status of Areas Requiring Corrective Action ML20236B9461989-03-13013 March 1989 Notification of Significant Licensee Meeting W/Util on 890322 in Region IV Ofc to Review OL Requirements ML20155A2481988-09-28028 September 1988 Notification of 881013 & 14 Meetings W/Util in Platteville, Co to Discuss Potential Decommissioning & Conversion of Facility.Meeting Agenda Encl ML20155B4111988-09-27027 September 1988 Notification of Significant Licensee Meeting W/Util on 881003 to Discuss Items in Insp Repts 50-267/88-15 & 50-267/88-23,control of Special Processes,Welding Program & NDE Program 1999-09-27 Category:MEMORANDUMS-CORRESPONDENCE MONTHYEARML20212G5351999-09-27027 September 1999
[Table view]Forwards Signed Original Confirmatory Order (Effective Immediately)(Morrison Knudsen Corp,Cleveland,Oh) for Transmittal to Ofc of Fr for Publication.Without Encl ML20236W8131998-08-0404 August 1998 Forwards Regulatory Documents Comprising Regulatory History of Notice of Proposed RM Entitled Miscellaneous Changes to Licensing Requirements for Independent Storage of Spent Nuclear Fuel & HLW Which Amended 10CFR72 ML20202D5011997-11-28028 November 1997 Forwards Table Summarizing Contractor Costs,Staff Hours & FTEs Expended in Removing Sites from Site Decommissioning Mgt Plan & Fsv & Shoreham Nuclear Power Facilities,In Response to C Paperiello 970605 Memorandum ML20149H4801997-07-24024 July 1997 Staff Requirements Memo Re SECY-97-138, Termination of Fort St Vrain Nuclear Generating Station Ol ML20141C8691997-05-0505 May 1997 Forwards Notice for Transmittal to Ofc of Fr Re Issuance of License Amend for Psc,Fort St Vrain Nuclear Generating Station Re Redesignated Approved Decommissioning Plan, & Approved Final Radiation Survey Plan ML20136D6041997-03-0404 March 1997 Forwards Signed Original of FRN for Transmittal to Ofc of Federal Register for Publication ML20134F8951996-11-0505 November 1996 Notification of 961203 Meeting W/Public Service Co of Co in Rockville,Md to Discuss Decommissioning & License Termination of Fort St Vrain ML20134G2511996-11-0505 November 1996 Forwards Notice of Forthcoming Meeting W/Psc on Decommissioning & License Termination of Fsv ML20236X0011996-09-12012 September 1996 Provides follow-up to Meeting Re Use of Natural or Depleted U in Storage Casks/Use of Neutron Absorbing Matls,In Order to Improve Basis & Shed Light on Direct Final Possibility ML20137H1331995-12-29029 December 1995 Responds to Request of 951108 for Investigative Assistance in Interviewing R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians at Fort St Vrain,Oi Case A4-95-064 ML20137H2951995-11-21021 November 1995 Forwards Copies of Transcripts of R Sawyer & K Zarht Re Alleged Discrimination & Wrongful Termination of Contractor Radiation Protection Technicians Case A4-95-064.W/o Encls ML20136B2301995-11-17017 November 1995 Forwards Repy to NOV ML20136B1711995-08-31031 August 1995 Agrees W/Office of Enforcement Regional Approach ML20136B1831995-08-31031 August 1995 Discusses Proposed Meeting Re OI 4-95-015 ML20136B2121995-08-30030 August 1995 Confirms 950911 for OI Meeting Re OI 4-95-015 ML20136B1901995-08-30030 August 1995 Ack Receipt of Mail ML20137H2651995-08-25025 August 1995 Forwards Copy of OI Rept Where Investigation Did Substantiate That Seg Technician Deliberately Failed to Perform Response Checks in Accordance W/Procedures.W/O Encl ML20136B1661995-08-17017 August 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Records.W/O Encl ML20136B2191995-08-0707 August 1995 Informs That Enforcement Action Will Be Required Re OI 4-95-015 Concerning Failure to Perform Response Checks ML20136B1581995-06-20020 June 1995 Requests That General Counsel Anlayze Rept & Determine Whether Sufficient Evidence Exists to Take EA Re Falsification of Records ML20137H2551995-06-0303 June 1995 Forwards Copy of OI Rept,Reviewing Licensee Investigation Rept & Confirmed Licensee Conclusions That Radiation Survey Records & Radiation Work Permits Falsified.W/O Encl ML20136B1471995-05-26026 May 1995 Forwards OI Rept of Investigation Re Alleged Falsification of Radiation Survey Records ML20137K0111995-04-20020 April 1995 Discusses Verbal DOJ Declination of Prosecution Re Public Svc Co of Colorado,For Plant ML20137K0611995-04-12012 April 1995 Documents Events Surrounding Discovery of Barrels Being Shipped from Plant to Richland Disposal Facility W/Different Radiation Exposure Readings than Were Listed on Shipping Manifest ML20137K0781995-04-12012 April 1995 Documents Events Surrounding Segs Placement of Problematic Radiation Protection Technician on Administrative Leave NUREG-1299, Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl1994-06-29029 June 1994 Forwards Continuation of Curtiss Papers to Be Filed Under Commission Correspondence in Pdr.Advanced Copy Sent to Pdr. List of Documents Included in Four Boxes Encl ML20137J8251994-04-14014 April 1994 Discusses Chronology of Events Since Preliminary Notification of Event or Unusual Occurrence Case 4-94-010 ML20137S2081994-03-28028 March 1994 Discusses 940325 Telcon from Listed Licensee & Contractor Personnel Re Rept of Falsified Survey Records ML20059G9501994-01-19019 January 1994 Staff Requirements Memo Re SECY-93-352,Proposed Export of Fort St Vrain Unirradiated HEU Fuel Assemblies to France for Recovery & Down-Blending to LEU XSNM-2748, & SECY-93-333, Final Amend to 10CFR55 on Renewal of Licenses.. ML20198H5751993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl IA-97-311, Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl1993-11-18018 November 1993 Submits Physical Security Info for Export of Unirradiated Fort St Vrain Fuel Containing high-enriched U Mixed W/Th to France for recovery,down-blending & Subsequent Use as Fuel in Research & Test Reactors.Supporting Documentation Encl ML20058B1681993-11-18018 November 1993 Notification of 931109 Meeting W/Psc in Rockville,Md to Discuss Fort St Vrain Decommissioning Status ML20059C2741993-10-25025 October 1993 Notification of Significant Licensee Meeting W/Util on 931116 to Discuss Decommissioning Status of Plant ML20058N9831993-10-0606 October 1993 Notification of 931109 Meeting W/Util in Rockville,Md for Briefing on Status of Plant Decommissioning ML20127D3281993-01-12012 January 1993 Notification of 930128 Meeting W/Util in Rockville,Md to Brief NRC on Plant Decommissioning Status ML20127L8411992-11-27027 November 1992 Forwards Insp Plan for Facility Which P Michaud Developed for Current Fy Ending on 930930.Plan Based on Mc 2560, Decommissioning Insp Program ML20126A3141992-11-27027 November 1992 Forwards Insp Plan for Fsv,Developed for Current Fiscal Yr Ending 930930.Plan Based on Mc 2560,Decommissioning Insp Program ML20059P0831990-10-12012 October 1990 Notification of 901017 Meeting W/Nrc in Rockville,Md to Discuss Decommissioning of Facilities ML20055F7381990-07-16016 July 1990 Notification of 900725 Meeting W/Util in Rockville,Md to Discuss Plant Status & Plans for Final Defueling & Decommissioning ML20248E8301989-09-26026 September 1989 Notification of 891013 Meeting W/Util in Rockville,Md to Discuss Plant Spent Fuel Storage.Agenda Encl ML20247J6831989-09-18018 September 1989 Forwards Comments on Facility Preliminary Decommissioning Plan,Per 890803 & 21 Memos Re Transfer of Regulatory Authority for Reactor Decommissioning ML20246F1871989-08-24024 August 1989 Summary of 890803 Meeting W/Util in Rockville,Md Re Preliminary Decommissioning Plan of 890630 for Plant.Related Info,Including List of Attendees & Util Info Re Use of Tax Deduction in Calculation of Funding Requirements Encl ML20245G5541989-08-0808 August 1989 Requests Support in Conducting Review of Plant Preliminary Decommissioning Plan.Areas to Be Reviewed,Requested Reviewers & Tentative Review Schedule Encl ML20248D1431989-07-27027 July 1989 Forwards Proposed Generic Ltr Requesting Voluntary Licensee Participation in ERDS & Requests That Proposed Generic Ltr Be Sent to All Licensees of Power Reactors,Except for Participants & Licensees of Listed Plants ML20247K6271989-07-24024 July 1989 Forwards Revised Filing Instructions for Rev 7 to Updated FSAR ML20246L7971989-07-17017 July 1989 Submits Daily Highlight.Notifies of of 890718 Meeting W/Util in Rockville,Md to Discuss Defueling of Plant & Tech Spec Upgrade Program ML20246L3741989-07-12012 July 1989 Notification of 890803 Meeting W/Util & State of Co in Rockville,Md to Discuss Preliminary Decommissioning Plan ML20247H6041989-05-29029 May 1989 Requests Encl Draft Reg Guide, Assuring Availability of Funds for Decommissioning Nuclear Power Reactors, Task CE 025-4 Be Forwarded to Util for Use in Preparing Preliminary Decommissioning Plan for Plant ML20247D7421989-03-27027 March 1989 Forwards FEMA 890313 Memo Transmitting FEMA Region Viii Update Rept of 870805 Exercise.Rept Includes Results of Remedial Drill Conducted on 880830 & Status of Areas Requiring Corrective Action ML20236B9461989-03-13013 March 1989 Notification of Significant Licensee Meeting W/Util on 890322 in Region IV Ofc to Review OL Requirements 1999-09-27 |
Text
_. __ _ _ -
. July 2, 1985 1
MEMORANDUM FOR: Richard P. Denise, Director h Division of Reactor Safety and Projects Region IV FROM: Hugh L. Thompson, Jr. , Director Division of Licensing Office of Nuclear Reactor Regulation i
SUBJECT:
FORT ST. VRAIN TENDON CORROSION - SAFETY EVALUATION (UPDATED)
- 1. TIA 85-01 dated January 2, 1985
- 2. Memorandum from J. R. Miller and E. Johnson to F. Miraglia dated February 5,1985 on Operating Plan for Fort St. Vrain Restart Review.
- 3. Memorandum from H. L. Thompson to R. P. Denise dated May 21, 1985 on Fort St. Vrain Tendon Corrosion SE.
Enclosed is our updated Safety Evaluation (SE) concerning the review of the corrosion of the Fort St. Vrain (FSV) tendons. This SE is in response to Item 5 of TIA 85-01 (Reference 1) and our operating plan for conducting this review (Reference 2). This SE updates our earlier SE on this subject (Reference 3).
The reviewer for this SE is Harold Polk, SGEB (FTS 492-8426). This review is based on a TER supplied by Los Alamos National Laboratory, which was supplied O in Reference 3.
The staff accepts the licensee's commitments concerning tendon surveillance as a basis for plant restart. In addition, the licensee has comitted to incorporate the modified tendon surveillance program into the Technical Specifications and provide the NRC with the results of the tendon surveil-lance program six months after plant restart. The licensee has also addressed the potential for anchorage stress washer failure.
We have found that these items provide an acceptable basis for plant restart.
i Original Signed by Hugh L Thompson, Jr.
Nft P
dM $$$67 PDR ,
Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation
Enclosure:
DISTRIBUTION:
As stated DOCKET FILE PMKreutzer NRC PDR EJButcher .
I CONTACT: Local PDR GClainas K. Heitner ORB #3 Rdg HThompson
.X27364 KHeitner j ORB #3:DL N ORB #3:DL M 0 k)L AD :DL :DI PKreutzer KHeitner:dd EdB her GC nas HThompson 6/%/85 6/14/85 6/jo/85 $ /85 y/f/85 l