Forwards Updated Safety Evaluation Accepting Util Commitments Re Tendon Surveillance as Basis for Restart. Util Will Incorporate Modified Tendon Surveillance Program Into Tech Specs & Provide Results 6 Months After Restart
ML20138A807
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 07/02/1985
From: Thompson H
Office of Nuclear Reactor Regulation
To: Denise R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20138A811 List:
References
TAC-54639, NUDOCS 8510110089
Download: ML20138A807 (1)


Text

_. __ _ _ -

. July 2, 1985 1

MEMORANDUM FOR: Richard P. Denise, Director h Division of Reactor Safety and Projects Region IV FROM: Hugh L. Thompson, Jr. , Director Division of Licensing Office of Nuclear Reactor Regulation i

SUBJECT:

FORT ST. VRAIN TENDON CORROSION - SAFETY EVALUATION (UPDATED)

1. TIA 85-01 dated January 2, 1985
2. Memorandum from J. R. Miller and E. Johnson to F. Miraglia dated February 5,1985 on Operating Plan for Fort St. Vrain Restart Review.
3. Memorandum from H. L. Thompson to R. P. Denise dated May 21, 1985 on Fort St. Vrain Tendon Corrosion SE.

Enclosed is our updated Safety Evaluation (SE) concerning the review of the corrosion of the Fort St. Vrain (FSV) tendons. This SE is in response to Item 5 of TIA 85-01 (Reference 1) and our operating plan for conducting this review (Reference 2). This SE updates our earlier SE on this subject (Reference 3).

The reviewer for this SE is Harold Polk, SGEB (FTS 492-8426). This review is based on a TER supplied by Los Alamos National Laboratory, which was supplied O in Reference 3.

The staff accepts the licensee's commitments concerning tendon surveillance as a basis for plant restart. In addition, the licensee has comitted to incorporate the modified tendon surveillance program into the Technical Specifications and provide the NRC with the results of the tendon surveil-lance program six months after plant restart. The licensee has also addressed the potential for anchorage stress washer failure.

We have found that these items provide an acceptable basis for plant restart.

i Original Signed by Hugh L Thompson, Jr.

Nft P

dM $$$67 PDR ,

Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation

Enclosure:

DISTRIBUTION:

As stated DOCKET FILE PMKreutzer NRC PDR EJButcher .

I CONTACT: Local PDR GClainas K. Heitner ORB #3 Rdg HThompson

.X27364 KHeitner j ORB #3:DL N ORB #3:DL M 0 k)L AD :DL :DI PKreutzer KHeitner:dd EdB her GC nas HThompson 6/%/85 6/14/85 6/jo/85 $ /85 y/f/85 l