Forwards Updated Safe Shutdown Analysis for Fire Protection. Addl Info on Fire Protection Sys & Exemptions to 10CFR50,App R,Section Iii.G & Iii.J Included
ML20070H793
Person / Time
Site: Clinton  Constellation icon.png
Issue date: 12/16/1982
From: Wuller G
ILLINOIS POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML17256B288 List: ... further results
References
B54-82(12-16)-L, U-0586, U-586, NUDOCS 8212270234
Download: ML20070H793 (1)


Text

_ _ _ _ _. _. _ _ _ _ _ _ _ _ _ - - _ - -

I U-0586 ILLINOIS POWER 00MPANY y

gg4_g2(32_3g;_7 500 SOUTH 27TH 5.TREET, DECATUR, ILLINOIS 62525 DecenSer 16, 1982 Mr. A.

Schwencer, Chief Licensing Branch No. 2 i

Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Schwencer:

Reference:

IP Letter 12/2/81, U-0373, J. D. Geier to J.

R.

Miller, NRC, regarding Alternate Safety-Shutdown capability analysis Clinton Power Station Unit 1 Docket No. 50-461 Safe Shutdown Analysis for Fire Protection Transmitted herewith is the Illinois Power Company updated document, " Safe Shutdown Analysis for Fire Protection."

This revised report supersedes the document previously provided for NRC Staff review, and referred to in the referenced letter.

Also included is additional information on the Clinton fire protection system and request for some exemptions to Sections III.G and III.J, Appendix R of 10CFR Part 50.

This material was requested by Messts. N.E. Fioravante, huxiliary Systems Branch and J.

F.

Stang, Jr., Chemical Engineering Branch, respectively, at the Clinton site meeting on July 13 and during subsequent telephone conversations.

Under separate transmittal, we are forwarding directly to Mr. H. Abelson for staff use a set of the electrical installation, cable tray and cable tray routing drawings for fire zones A.2.1, D.2.1, D.3.2, D.3.6 and F.3.1.

Please let us hear if you have any questions regarding this information.

g Sincerely, l

W9b ff u

]h G.

E. Wuller Olpervisor - Licensing g

Nuclear Station Engineering b

J

)

GEW/em/LET3

(

cc:

H. Abelson, NRC Clinton Project Manager N.

E.

Fioravante, NRC, ASB

~

H.

H. Livermore, NRC Resident Inspector N.

F.

Decker, Jr., At:I Illinois Department of Nuclear Iafety P. A.

Giaccaglia, ANI J.

F.

Stang, J r. NRC, CEB I'A2122}O234 8' ~1216 2

l PDR ADOCK 05000461

,.F PDR i