Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NRC-99-0055, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval + (Forwards Rev 5 to Inservice Testing Program for Pumps & Valves for Fermi 2 Second 10-Year Interval, Per Provisions of 10CFR50.55a(f)(5)(iv).Rev Includes Four Pump Relief Requests & Ten Valve Relief Requests Requiring NRC Approval)
- NLS8600248, Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes + (Forwards Rev 5 to Inservice Testing Program for ASME Class 1,2 & 3 Components, for Second 10-yr Testing Program. General Pump Testing Procedure 3.9 & General Valve Testing Procedure 3.10 Being Revised to Incorporate Rev 1 Changes)
- NG-84-0011, Forwards Rev 5 to Inservice Testing Program for Pumps & Valves.Response to SER Re Pending Relief Requests,Also Encl + (Forwards Rev 5 to Inservice Testing Program for Pumps & Valves.Response to SER Re Pending Relief Requests,Also Encl)
- ML20199B526 + (Forwards Rev 5 to Inservice Testing Program for Pumps & Valves & Listing of Basis for Each Change.Rev Contains Program Enhancements & Documents Addition of 6 & Deletion of 11 Relief Requests)
- ML20134D033 + (Forwards Rev 5 to Inservice Testing Program)
- ML20134D037 + (Forwards Rev 5 to Inservice Testing Program.)
- ML18152A998 + (Forwards Rev 5 to Irdam Dose Assessment Computer Program & Provides Program Initiation Instructions.W/O Encl)
- ML20151X646 + (Forwards Rev 5 to Issue 4 of Plant Physical Security Plan. Rev Withheld (Ref 10CFR2.790(d) & 73.21))
- JAFP-99-0125, Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1) + (Forwards Rev 5 to JAFNPP Security Contingency Plan,Which Enhances Requirements of 10CFR73.55.Changes Do Not Decrease Effectiveness of Plan.Plan Withheld IAW 10CFR73.21 & 2.790(d)(1))
- JAFP-87-0297, Forwards Rev 5 to Ja Fitzpatrick Nuclear Power Plant Offsite Dose Calculation Manual & Util Response to NRC Questions Re Commission Review of Manual,Per Hi Abelson 861002 Request + (Forwards Rev 5 to Ja Fitzpatrick Nuclear Power Plant Offsite Dose Calculation Manual & Util Response to NRC Questions Re Commission Review of Manual,Per Hi Abelson 861002 Request)
- SNRC-1199, Forwards Rev 5 to Local Offsite Radiological Emergency Response Plan,Including Procedures,App a & App B Agreement Ltrs.Requests FEMA Review Rev 5,per NRC-FEMA MOU + (Forwards Rev 5 to Local Offsite Radiological Emergency Response Plan,Including Procedures,App a & App B Agreement Ltrs.Requests FEMA Review Rev 5,per NRC-FEMA MOU)
- ML20078B471 + (Forwards Rev 5 to MCEI-0400-46, McGuire Unit 1 Cycle 10 Colr)
- ML20140C494 + (Forwards Rev 5 to MP 728.1,rev 3 to MP 772.6,rev 2 to 772.6-1,rev 1 to 772.6-2 & Rev 0 to Cancellation Request Forms 772.6-3,772.6-4,772.6-5 & 772.6-6)
- ML20140C499 + (Forwards Rev 5 to MP 728.1,rev 3 to MP 772.6,rev 2 to 772.6-1,rev 1 to 772.6-2 & Rev 0 to Cancellation Request Forms 772.6-3,772.6-4,772.6-5 & 772.6-6)
- ML20011D628 + (Forwards Rev 5 to Maine Yankee Atomic Power Co Operational QA Program)
- ML20106E324 + (Forwards Rev 5 to Millstone Unit 2 Cycle 12 COLR, Incorporating Listed Changes)
- B16978, Forwards Rev 5 to Millstone Unit 3 Operational Readiness Plan. Plan Covers Readiness for Restart,Startup & Power Ascension & long-term Operational Objectives + (Forwards Rev 5 to Millstone Unit 3 Operational Readiness Plan. Plan Covers Readiness for Restart,Startup & Power Ascension & long-term Operational Objectives)
- ML20064D308 + (Forwards Rev 5 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML18040A244 + (Forwards Rev 5 to NMP2-IST-001, NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan, Per GL 89-04 & NUREG-1482)
- ML17059B292 + (Forwards Rev 5 to NMP2-IST-001, NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan, Per GL 89-04 & NUREG-1482)
- ML17056A610 + (Forwards Rev 5 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations.)
- ML18038A707 + (Forwards Rev 5 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations)
- NG-92-5581, Forwards Rev 5 to Offsite Dose Assessment Manual for Gaseous & Liquid Effluents + (Forwards Rev 5 to Offsite Dose Assessment Manual for Gaseous & Liquid Effluents)
- ML20150E791 + (Forwards Rev 5 to Offsite Dose Calculation Manual,Per 871123 Request.Rev Addresses All But Three Discrepancies Noted in Technical Evaluation Rept.Discrepancies Not Addressed, Restated,Followed by Util Response)
- ML20071C830 + (Forwards Rev 5 to Offsite Dose Calculation Manual)
- ML20091A544 + (Forwards Rev 5 to Operator Requalification Program)
- ML17055E444 + (Forwards Rev 5 to Oversize Drawing 706E231.Drawing Supersedes Drawing 706E231,Rev 4,contained in Encl 1 to Submittal)
- ML20237E893 + (Forwards Rev 5 to PCC-QAPD, QA Program Description, Dtd 880101.Software Requirements Established for Nuclear Facilities Translated to Similar Activities Performed by Info Processing Industry)
- PY-CEI-NRR-2229, Forwards Rev 5 to PDB-F0001, COLR for Perry Nuclear Power Plant,Unit 1,Cycle 7 (Reload 6) & Rev 0 to J11-03060SRLR, Suppl Reload Licensing Rept for Perry Npp,Unit 1,Reload 6, Cycle 7 + (Forwards Rev 5 to PDB-F0001, COLR for Perry Nuclear Power Plant,Unit 1,Cycle 7 (Reload 6) & Rev 0 to J11-03060SRLR, Suppl Reload Licensing Rept for Perry Npp,Unit 1,Reload 6, Cycle 7)
- VPN-004-99, Forwards Rev 5 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Table 2.2-5 Is Revised to Depict Major Components Removed from Plant During 1998.Revs Are Denoted by Side Bars + (Forwards Rev 5 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Table 2.2-5 Is Revised to Depict Major Components Removed from Plant During 1998.Revs Are Denoted by Side Bars)
- ML20204H033 + (Forwards Rev 5 to PSP for Surry & North Anna Power Stations & Associated Isfsis.Description & Justification for Changes Included with Plan Rev.Rev 5 to PSP Withheld Per 10CFR73.21)
- ML18066A688 + (Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments)
- ML18066A689 + (Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments)
- RBG-22709, Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20082K009 + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20100N188 + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20098F063 + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20128G796 + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20154K267 + (Forwards Rev 5 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- TXX-6380, Forwards Rev 5 to Physical Security Plan.Rev Necessitated by Company Name Change & Administrative Title Changes.Rev Withheld (Ref 10CFR2.790 & 73.21) + (Forwards Rev 5 to Physical Security Plan.Rev Necessitated by Company Name Change & Administrative Title Changes.Rev Withheld (Ref 10CFR2.790 & 73.21))
- B12937, Forwards Rev 5 to Physical Security Plan & Rev 7 to Suitability,Training & Qualification Plan.Revs Withheld (Ref 10CFR2.790) + (Forwards Rev 5 to Physical Security Plan & Rev 7 to Suitability,Training & Qualification Plan.Revs Withheld (Ref 10CFR2.790))
- ML20067D275 + (Forwards Rev 5 to Physical Security Plan,In Accordance W/ 10CFR50.4(iv) & 10CFR50.54p(2).Rev Withheld (Ref 10CFR2.790(d)(1)))
- ML20083P822 + (Forwards Rev 5 to Physical Security Plan Re Changes to Interior Protected Area Barrier Layout,Details of Access Through Interim Barrier Portals & Control of Locks,Keys & Combinations.Rev Withheld (Ref 10CFR73.21))
- ML20116D317 + (Forwards Rev 5 to Physical Security Plan,Safeguards Contingency Plan & Security Force Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21 & 2.790))
- ML20055G644 + (Forwards Rev 5 to Physical Security Plan,Per 900622 Request for Addl Info.Rev Incorporates Subj Matter of Three Commitments.Rev Withheld (Ref 10CFR2.790(d)))
- 3F0690-01, Forwards Rev 5 to Physical Security Plan,Replacing Currently Approved Rev 4 W/Amends.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 5 to Physical Security Plan,Replacing Currently Approved Rev 4 W/Amends.Rev Withheld (Ref 10CFR73.21))
- ML20217N806 + (Forwards Rev 5 to Physical Security/Contingency Plan & Rev 22 to Training & Qualification Plan,Per 10CFR50.54(p).Encl Withheld,Per 10CFR2.790(d)(1))
- ML20153E576 + (Forwards Rev 5 to Physical Security/Contingency Plan,Per 10CFR50.54(p).Encl Describes Details of Rev,Security Key & Locks Rotation.Encl Withheld)
- ML20045B551 + (Forwards Rev 5 to Policy & Procedure Manual 1000-PLN-4010.01 Gpu Nuclear Corp Radiation Protection Plan. Rev Submitted to Address License Condition in possession-only License Contained in NRC)
- PY-CEI-NRR-0137, Forwards Rev 5 to Preservice Insp Program Plan:General Ref Text & Rev 1 to Reactor Pressure Vessel Preservice Insp Program Plan for Perry Nuclear Power Plant Unit 1, in Response to SER Confirmatory Issue 15 + (Forwards Rev 5 to Preservice Insp Program Plan:General Ref Text & Rev 1 to Reactor Pressure Vessel Preservice Insp Program Plan for Perry Nuclear Power Plant Unit 1, in Response to SER Confirmatory Issue 15)
- ML20197H583 + (Forwards Rev 5 to Preservice Insp Program Plan:Rhr Sys, Rev 8 to Preservice Insp Program Plan:Hpci Sys & Rev 5 to Preservice Insp Program Plan:Accumulator Safety Injection Sys. Addl Longitudinal Seam Pipe Welds Described)