ML20134D033
| ML20134D033 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 08/09/1985 |
| From: | Schnell D UNION ELECTRIC CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20134D037 | List: |
| References | |
| ULNRC-1152, NUDOCS 8508190027 | |
| Download: ML20134D033 (5) | |
Text
7 asu
~'
UNION EECTRIC COMPANY k,-
1901 Grotiot Street St. Louis August 9, 1985 e-f Donoki F.Schnell Vice President Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 ULNRC-1152
Dear Mr. Denton:
DOCKET NUMBER 50-483 CALLAWAY PLANT, UNIT 1
- CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM
Reference:
- 1) ULNRC-738 dated January 31, 1984
- 2) ULNRC-833 dated May 29, 1984
- 3) ULNRC-1039 dated February 11, 1985
- 4) ULNRC-1127 dated June 28, 1985 Reference 1 transmitted the Callaway Pump and Valve Inservice Testing Program.
References 2, 3, and 4 transmitted updates to this same program.
Included as attachments to this letter are further updates to the Callaway testing program. is a brief description of the changes, and contains revised replacement pages.
If there are any questions, please contact us.
Very truly y urs, s
Donal
- chnell WEK/WAW/bjk Attachments f
P de17 Mailing Address: RO Box 149, St. Louis, MO 63166 j,iI
STATE OF MISSOURI )
)
Robert J. Schukai, of lawful age, being first duly sworn upon oath says that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knbws the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By L
Robe'rt J c Tcai General Man.er-Engineering Nuclear SUBSCRIBED and sworn to before me this day of 198 [
0- l BAR8ARb. PF F NOTARY PUBUC, STATE CF MISSOUR1 MY COMMISS:0N EXPIRES APRIL 22, 1989 ST. LOUIS COUNTY
cc:
Gerald Charnoff, Esq.
Shaw, Pittman, Potts & Trowbridge
'1800 M.
Street, N.W.
Washington, D.C.
20036 Nicholas A. Petrick Executive Director
'SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 G. C. Wright Division of Projects and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RRil Steedman, Missouri. 65077 Tom Alexion Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory. Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014
.~
bec:
3456-0021.6 w/a Nuclear Date DFS/ Chrono J. F. McLaughlin J. E. Birk W. H. Weber F. D. Field R. J. Schukai M. A.
Stiller S. E. Miltenberger w/a H. Wuertenbaecher D. W. Capone A. C. Passwater T. H. McFarland R. P. Wendling D. E. Shafer D. J. Walker G. P. Rathbun (KG&E)
J. H. Smith (Bechtel)
G56.37 (CA-460)
Compliance (J. E. Davis)
NSRB (Laura Robertson)
W. A. Witt (CA-460) w/a
]
1
--,-r--
my-,
-v
.r----
ATTACHMENT TO ULNRC-1152 ASME SECTION XI PUMP AND VALVE PROGRAM CHANGES TO CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM ITEM 1:
CHANGE:
Add Relief Request #EJ-7 BASIS FOR CHANGE:
As described in Relief Request #EJ-7 ITEM 2:
CHANGE:
Add stroke test of EJ-HV-8716A, B in the open direction.
BASIS FOR CHANGE:
For Emergency Core Cooling System Recirculation the valves must open to switch from Cold Leg Recircul-ation phase to Hot Leg Recircul-ation phase.
ITEM 3:
CHANGE:
Revise Maximum Allowable Stroke Time for EG-HV-15.
BASIS FOR CHANGE:
Due to new design document for the valve.
ITEM 4:
CHANGE:
Add Relief Request #EM-6 BASIS FOR CHANGE:
As described in Relief Request
- EM-6.