ML20197H583
| ML20197H583 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 06/13/1984 |
| From: | Seiken S STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20197H589 | List: |
| References | |
| SLNRC-84-92, NUDOCS 8406180446 | |
| Download: ML20197H583 (1) | |
Text
-
e SNUPPS Standardised Nuclear Unit Power Plant Sys,em 5 Choke Cherry Road noch,in., u.,vi.nd 20es0 June 13, 1984 1301)86S4010 SLNRC 84-92 FILE: M-189/0541 SUBJ: Callaway Preservice Inspection Program Plan Mr. Harold R. Denton, Director Office of Nuclear Rea: tor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 205E5 Docket No. STN 50-433 Ref: ULNRC 839, dtd. 6/3/84: Same Subject
Dear Mr. Denton:
As a followup to the reference letter, please find enclosed with this letter revisions to the Callaway Preservice Inspection (PSI)
Program Plan for the following systems:
I o System EJ: Residual Heat Removal o System EM: High Pressure Coolant Injection o System EP: Accumulator Safety Injection These revisions incorporate into the PSI program the additional longitudinal seam pipe welds described in the reference.
If you have any questions concerning this revised submittal, please contact the undersigned.
Very truly yours, y
S.
. Seiken QA Manager SJS/dck/6a5 Enclosures cc:
J. Neisler/B. Little, USNRC/ CAL w/o H. Bundy, USNRC/WC
- 8. L. Forney, USNRC Region III E. H. Johnson, USNRC Region IV D. F. Schnell, UE D. T. McPhee, KCPL G. L. Koester, KGE a
.fe O!
d
_ p1 MT*4 j