KANSAS GAS AND ELECTRIC COA 4PANY Te4F E. & C f f aC CCPAPANY June 10, 1986 otr=~t n or su a
.u u ~ - o..
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 KMLNRC 86-106 Ref:
KMLNRC 85-187 dated 7/29/85 frcrn GKoester, KG&E, to HRDenton, NRC Subj:
Inservice Testing Program for Pumps and Valves
Dear Mr. Denton:
The referenced letter transmitted Revision 4 to the Wolf Creek Generating Station (WCGS)
Inservice Testing (IST)
Program for Pumps and Valves.
Transmitted herewith is Revision 5 of the Wolf Creek IST Program for Pumps and Valves.
The revision contains program enhancements, documents the addition of six relief requests and documents the deletion of eleven previously schnitted relief requests.
The specific changes, along with the basis for each
- change, are listed in Attachment 1.
Revision bars have been added to designate the changes to aid in your review.
'Ihe program continues to meet the requirenents of 10 CFR 50.55a and is written to Section XI of the ASME Boiler and Pr6sure Vessel Code, 1980 Edition through Winter 1981 Addenda.
It provides an effective, improved program which will assure overall safe operation of the plant.
Therefore, KG&E has implemented Revision 5 pending formal NRC acceptance of an IST Program for WCGS.
A copy of the IST Program for Pumps and Valves Revision 5 has been provided to Mr. H. L. Magleby of EG&G Idaho, Inc.
If you have any questions on this subnittal please contact me or Mr. O. L. Maynard of my staff.
67e6C61jg,*
Yours ve y b ly,
/
6 CK 0500 g
Glenn L. Koester Vice Pre ident - Ntclear 1
GLK:see l
Attachment
)
Enclosure cc: PO'Connor (2), w/a I
t JCtmnins, w/a 201 N Market ~ W hrta, Kansas - Mad Address PO. Box l08 I Wichita, Kansas 67201 - Telephone: Area Code (316) 2616M I 4
F ATTACIIMDTP I to 100mC 86-106 Changes To WCGS Inservice Testing Program For Pumps and Valves
CHANGES 'IO WCGS INSERVICE TESTING PROGRAM FOR PUMPS AM) VALVES IT m 1:
Change: On the cover sheet the typed names of IST Engineer, Operations Coordinator - Projects & Planning and Superintendent of Operations were deleted.
Basis for Change: Unnecessary information.
IT m 2:
Change: On the LIST OF TABLES page and TABLE OF CONTENTS page, page numbers were changed to reflect new revision.
Basis for Change: New revisions added pages to program.
IT m 3:
Change: In the INTRODUCTION section, paragraph three, second sentence, the words " pumps and" were deleted.
Basis for Change: There are no pumps identified as nonclassed (NC).
IT m 4:
Change: In Table 1.1 M-02BM01, M-02EM01, M-02EN01 and M-02KC02 were changed to M-12BM01, M-12EM01, M-12EN01 and M-12KC02.
Basis for Change: P&ID's were renumbered to indicate site specific.
IT m 5:
Change: In Section 2.1.2, under ISI. REQUIREMENTS, ( AP) was deleted from the paragraph heading and the words "or observed" were added to the first sentence.
Basis for Change:
(AP) is unnecessary information. Certain test quantities will be observed not measured.
U IT m 6:
Change: In Section 2.1.4, the second half of the last sentence starting with the words "the possibility" were deleted and the words " corrective action per IWP-3230 shall be followed." were added.
Basis for Change: ASME Section XI requires action per IWP-3230 if measured test quantities fall outside the allowable ranges.
ITm 7:
Change: On RELIEF REQUEST No. PR-2 the BASIS FOR RELIEF was enhanced and the ALTERNATE TESTING was changed.
Basis for Change: Program enhancement.
m.
ITEM 8:
Oiange: RELIEF REQUEST No. PR-3 capitalized e, f, o, t; RELIEF REQUEST No. PR-4 capitalized e, f, o, t, d, o and deleted the word "are"; in Appendix B, for valve BG HV-8143, in the VALVE TYPE column a "Y" was added to "'IW"; in Appendix B, for valves BG ECV-459 and BG ICV-460, in the MAX STRK TIME column, the >15 was changed to >l5; in Appendix B, in the REMARKS column, NOTE has been replaced with Note and NOTES replaced with Note; in Appendix B, for valve EJ HV-8811B, the Q was deleted from the P&ID COOR column.
Basis for Change: Typos.
ITEM 9:
01ange: RELIEF REQUEST No. PR-6 was changed to request relief from the instrument accuracy requirement for measurement of pressure on the Emergency Fuel Oil Transfer Pumps.
Basis for Change: Program enhancement.
ITEM 19:
01ange: RELIEF REQUEST No. PR-7 was deleted.
Basis for Change: ASME Section XI allows for engineering evaluation of pump data and the flexibility to develop new acepetance criteria.
ITEM 11:
Change: The Motor Driven Aux. Feedwater Pumps and the Turbine Driven Aux. Feedwater Pump were deleted from RELIEF REQUEST No. PR-8.
Also, on PR-8 ALTERNATE TESTING was changed to "None".
Basis for Change: Flow rate is now being measured for the Aux.
Feedwater Pumps. There is no alternate testing being performed.
ITEM 12:
Change: On RELIEF REQUEST No. PR-10, under ALTERNATE TESTING, the "30 seconds" was changed to "one minute".
Basis for Change: It has been determined that sufficient time exists to observe / record measured test parameters after the pumps have run for one minute.
ITEM 13:
Change: Added RELIEF REQUEST No. PR-12 to obtain relief from IWP-4120 for vibration measurement.
Basis for Change: Program enhancement.
ITEM 14:
Change: In Section 3.1.2 the " MAX LEAKG:" and associated paragraph were deleted.
Basis for Qiange: Unnecessary information - not required to be a part of the program submittal.
ITEM 15:
Change: In Section 3.1.2, the REMARKS paragraph was changed to indicate that the Remarks Column contains any specific conments for a particular valve including notes.
Basis for Change: The REMARKS column may contain other conments besides notes.
ITEN 16:
Change: In Section 3.1.3, the third sentence in the STROKE TIME paragraph was deleted.
Basis for Change: In the WCGS IST Program for Pumps and Valves stroke time is measured to the nearest hundredth of a second.
ITEM 17:
Chamje: In Section 3.1.3, words have been added to the SEAT LEAKAGE paragraph to indicate AT-1 and AT-2 leak rate testing will be performed via Appendix J (Type C) leak rate testing and Reactor Coolant System pressure isolation valve leak rate testing, respectively.
Basis for Qiange: Program enhancement.
ITPN 18:
Change: In Section 3.1.4, paragraph (a) under STROKE TIME, the "five" has been changed to "two".
Basis for Change: Program enhancement.
ITEN 19:
Change:
In Section 3.1.4, the POSITION INDICATION paragraph has been changed to state a more accurate definition of valve position indication.
Basis for Change: 'Ihe old definition was restrictive - Section XI requires valve movement to be accurately indicated by remote position indication and not necessarily in the fully open or fully closed position.
ITFM 29:
Otange:
In Section 3.1.4 the SEAT LEAKAGE paragraph was shortened as follows: Valve leakage rates shall not exceed the values specified by Wolf Creek Generating Station.
Basis for Change: All permissible valve leakage rates are specified by Wolf Creek Generating Station and not determined by IWV-3426 (a) or (b).
ITEN 21:
Change: In Table 3.1-2 a 1.SY test frequency was added.
Basis for Change: Program enhancement.
ITFM 22:
Change: In Table 3.1-2 the "72" in the paragraph designated with (2) was changed to a "48".
Basis for Change: Program enhancement.
ITEM 23:
Change: In Table 3.1-2 a note (3) was added to indicate operational conditions are defined in the specific surveillance test procedure.
Basis for Change: Program enhancement.
ITEN 24:
Change: In Table 3.1-2 under the FREQUENCY OF TESTING column for RR the wording was changed to indicate RR test frequency testing can only be acconplished each reactor refueling outage.
Basis for Change: Program enhancement.
ITEN 25:
Change: In Table 3.1-2, under the FREQUEBCY OF TESTING column for 5Y and 2Y, the second half of the entry starting after the word " years", was deleted.
Basis for Change: Unnecessary information.
ITtM 26:
Change: RELIEF REQUEST No. VR-2 was changed to indicate that quick-acting valves are valves stroking in two seconds or less and to clarify there will be no alternate testing.
Basis for Change: Program enhancement.
ITEM 27:
Change: On RELIEF REQUEST No.'s VR-3, VR-20 and VR-21, valve identification numbers were changed to comply with current format, CATEGORY A, C was changed to A/C to avoid confusion with other category listings, and the ALTERNATE TESTING paragraph was revised to clarify the test frequency.
Basis for Change: Program enhancement.
l l
t
ITFN 28:
Change: On RELIEF REQUEST No. VR-4, valve identification numbering format was updated, A, C was changed to A/C and the C category deleted, the BASIS FOR RELIEF was revised to request relief only for verifying closure via leakage testing, and the ALTERNATF TESTING paragraph was revised to clarify the method for verification of valve closure and to indicate that this includes all the valves listed.
Basis for Change: Program enhancement.
ITFM 29:
Change: On RELIEF REQUEST No. VR-5 the A, C was changed to A/C and l
the rest of the relief was revised to request relief for just IW-3426 and IW-3427(a) not all of IW-3420.
1 Basis for Change: Leakage testing is being performed in accordance with IW-3420 with the exception of IW-3426 and IW-3427 (a).
ITEN 30:
Change: RELIEF REQUEST No. VR-6 was changed to request relief for measurement of valve stroke times of the Diesel Generator Starting Air Inlet Valves.
Basis for Change: Program enhancement.
ITEN 31:
Change: RELIEF REQUEST No. VR-7 was deleted.
Basis for Change: Testing of these valves can be acconplished "during cold shutdown without affecting plant safety.
ITHi 32:
Change: On R.R. No. VR-8, CATEGORY "A and A, C" was changed to "A/C and A", another BASIS FOR RELIEF c) was added for AT-2 leak tested valves and the ALTERNATE TESTING was revised to indicate exceptions to IW-3427(a).
Basis for Change: Program enhancement.
ITFM 33:
Change:
R.R. No. VR-9 was deleted.
Basis for Change: These valves perform no safety function in the closed direction.
ITai 34:
Change:
R.R. No VR-10 was added to request relief for post maintenance full stroke testing of various main steam and main feedwater valves.
Basis for Change: Program enhancement.
ITM 35:
Qunge:
R.R. No. VR-ll was changed to request relief for position indication testing of the Pressurizer Safety Relief Valves using actual valve position.
Basis for Change: Program enhancement.
i ITm 36:
Ounge:
R.R. No.'s VR-12, VR-14 and VR-22 were deleted.
Basis for O unge: Testing of these valves during cold shutdown may be accomplished without significantly affecting plant safety.
ITm 37:
Change: On R.R. No. VR-13 valve identification numbering format was updated, A, C was changed to A/C, valve EM-8815 was deleted and the ALTERNATE TESTING paragraph was revised to clarify the method for verification of valve closure.
Basis for Change: Program enhancement.
IT M 38:
Change: On R.R. No. VR-17 valve identification numbering format was updated.
Basis for Cunge: Program enhancement.
i.
ITEM 39:
Change: On R.R. No. VR-15 valve identification numbering format was updated and the rest of the relief was revised to request relief for testing open EN-V002, EN-V008, EN-V013 and EN-V017, and for testing close EN-V013 and EN-V017 in the normal manner.
i Basis for Change: Program enhancement.
IT m 40:
O mnge:
R.R. No. VR-16 was added to request relief for check valve testing in the closed direction, on a single valve, for the nuin steam to aux. feed pump turbine check valves.
Basis for Change: Program enhancement.
ITEM 41:
Qunge:
R.R. No.'s VR-18 and VR-19 were deleted.
Basis for Change: Plant safety would not be significantly affected upon testing these valves in the cold shutdown mode.
ITm 42:
Qungo: In Appendix A, in the FIIM RATE column for PALOlA, PAIDlB and PAtD2 the "PR-8" was changed to a "YES".
Basis for Qungo: Instrumentation is now being utilized to measure flow rate on these pumps.
-+-r-c--
u
-4, v
---wy 2
me-
--w
--e e
-w.
g.
ITEM 43:
Oiange: In Appendix A, in the VIBRA column for PBG02A and PBG02B the "PR-6" was changed to a "Yes".
Basis for Change: Vibration measurement as close to the bearings as possible will give indication of bearing degradation.
ITEM 44:
Change: In Appendix A, on page 1 of 2 a note 3 was added to indicate other relief requests on pump testing do exist and that the requests on pump testing do exist and that the request itself identifies the applicable pump.
Basis for Change: Program enhancement.
IT m 45:
Ounge: In Appendix A, in the REMARKS column, the PR-2's, and PR-7's were deleted ard replaced with " Note 2, 3".
Basis for Change: Program enhancement.
ITm 46:
Change: In Appendix A, on page 2 of 2, the M-02EM01's and the M-02EN01's were changed to M-12EM01 and M-12EN01, and the notes 1 and 2 were deleted.
Basis for Change: P&ID's were renumbered to indicate site specific. Notes 1 and 2 are already on page 1 of 2 of the same appendix.
IT m 47:
Ounge: In Appendix B, throughout the valve listing the headings have been changed:
Insignificant information has been deleted, P&ID numbers were changed, system designators were added and the MAX LEAKG column was deleted.
Basis for dunge: Program enhancculent.
ITEM 48:
Change: In Appendix B, the test frequency for valves AB W-1, AB W-2, AB W-3 and AB W-4 was changed from "CS" to "0" for BT-C, BT-0 and FST testing. Also, NOTE 1 was deleted.
Basis for Change: The valves can be isolated and therefore tested in any mode.
IT m 49:
dunge:
In Appendix B, the VR-2 in the RELIEF REQUEST column was changed to VR-10 for valves AB HV-ll, IIV-14, IIV-17 and liv-20.
Basis for Change: Program enhancement.
,.--,___-.__.--..c.,_,
.,_,_n
ITEN 50:
Change: In Appendix B, a VR-1 and VR-10 were added to the R.R.
column and a N(yrE 24 added to the REMARKS column for valves AB IN-12, HV-15, IN-18 and FN-21.
Basis for Change: Program enhancement.
ITEM 51:
O mnge: In Appendix B, VR-2 was deleted in the R.R. column for valves AB IN-48 and IN-49.
Also, a VR-1 was added to R.R.
column for AB LV-7, LV-8, LV-9 and LV-10.
Basis for Change: Program enhancement.
ITEM 52:
Change: In Appendix B, for valves AE ECV-510, 520, 530, 540, 550, 560, 570 and 580, the following changes were made:
the "N" was changed to "NC" in the IST CLASS column; a BT-P was added to the TEST RQMT column; a "Q" was added to the TST FRE column; and the VR-2 was repalced with a VR-10 in the RELIEF REQUEST column.
Basis for Change: Program enhancenent/A partial stroke test can be performed during normal operation.
ITEN 53:
O mnge: In Appendix B, for valves AE FV-39, 40, 41 and 42, the VR-2 was changed to VR-10 in the RELIEF REQUEST column.
Basis for Change: Program enhancement.
ITIM 54:
dunge: In Appendix B, for valves AE FV-43, 44, 45 and 46, a BT-C, FST and PIT were as added in the TEST RQMT coltann, a 0, Q, and 2Y were added in the TST FRE column, a 5 was added in the MAX STRK TIME column, and a VR-1 was added to the R.R.
column.
Basis for Change: These valves are not always in their safety position and therefore not passive.
ITEM 55:
O nnge: In Appendix B, valves AL IN-5, IN-7, IN-9 and IN-11 were deleted along with their associated entries in other columns.
Basis for Change: These valves are exenpt from the program.
ITEM 56:
Ounge: In Appendix B, for valves AL IN-30, IN-31, IN-32 and IN-33, the 15 in the MAX STRK TIME column was changed to 18.
Basis for Omnge: An Engineering Analysis determined that the maxinum allowable stroke time for these valves to open can be increased to 18 seconds without affecting the safety, function of the valve.
ITEN 57:
Change: In Appendix B, the leakage entries in the MAX LEAKG column were deleted for all valves having a test requirement of either AT-1, AT-2 or AT-3.
Basis for Change: Unnecessary information - not required to be part of the program sutxnittal.
ITFM 58:
Change: In Appendix B, for all valves with an IST category of A, C the A,C was changed to A/C in the IST CAT column.
Basis for Change: Program enhancement.
ITFM 59:
Change: In Appendix B, for all valves with a test requirement of AT-2 the associated RR in the TST FRE column was changed to 1.5Y.
Also, for valves with AT-2 and a CVT-C test requirement, the CVT-C associated RR in the TST FRE column was changed to 1.5Y.
Basis for Change: Testing is being performed every 18 months.
ITEN 69:
O nnge:
In Appendix B, for valves BB-8948A, B, C, D, 8949A, B, C, D and BB PV-8702A and B, the VR-6 was changed to VR-8 in the RELIEF REQUEST column. Also, in the RELIEF REQUEST column the VR-6 was deleted for valves BB-V001, V022, V040 and V059.
Basis for Change: Program enhancement.
ITFM 61:
Change: In Appendix B, for valves BB-8010A, 80108 and 8010C, a PIT was added in the TEST RQMT column, a 2Y added to the TST FRE column and a VR-11 added in the RELIEF REQUEST column.
Basis for Change: These valves have remote position indication.
ITFM 62:
Change: In Appendix B, for all valves with a test requirement of AT-1, not including valves GT HZ-4, HZ-5,11Z-11 and HZ-12, the associated RR in the TST FRE column was changed to 2Y.
Also, for valves with AT-1 and a CVT-C as a test requirement, the CVT-C associated RR in the TST FRE column was changed to 2Y.
Basis for Change: Testing is being performed every two years.
ITFM 63:
Change:
In Appendix B, for valves BB HV-8026 and BB HV-8027, the VR-8 was deleted from the RELIEF REQUEST column.
Basis for Change: Program enhancement.
ITEM 64:
Change: In Appendix B, for valves BB !!V-8157A and B, a VR-1 was added to the RELIEF REQUEST column.
Basis for Change:. Program enhancement.
ITM 65:
Change: In Appendix B, for all valves with a valve size of < 6 inches and having a test requirement of AT-1, VR-8 was deleted from the RELIEF REQUEST column.
Basis for O nnge:
Program enhancement.
ITPM 66:
Ounge:
In Appendix B, valves BG-V019, BG IW-8146, BG IW-8147, BG ICV-123, BG-V154, BG ECV-110A, EG-V124, EG-V129, EM-V014, EM-V017 and EC-V999 were deleted along with their associated entries in other columns.
Basis for Change: These valves are exempt from the program.
ITPM 67:
Change: In Appendix B, for valve BG !!V-8143, the "0" was changed to "NA" in the NORM POS column.
Basis for Change: Normal position for a three way valve is not defined.
ITEN 68:
Oiange: In Appendix B, for valves BG IEV-459 and ICV-460, the ">
OR = TO 15" was deleted from the REMARKS coltann.
Basis for O unge: Redundant information; > 15 is already listed in MAX STRK TIME column.
ITEM 69:
Change: In Appendix B, for BG-V591, the "C" was changed to an "O" in the NORM POS column.
Basis for Change:
This valve is inline to the Reactor Coolant Pump Seals.
ITFM 70:
Change: In Appendix B, for valves BM IW-1, HV-2, ilV-3 and HV-4, the " NOTE 20" was deleted fran the REMARKS coltann.
Basis for Change: Program enhancement.
ITIN 71:
Change:
In Appendix B, for valves BM IN-19, !!V-20, HV-21, HV-22, HV-35, !!V-36, IIV-37, ifV-38, IIV-65, IIV-66, !!V-67 and IIV-68, the VR-2 was deleted from the RELIEF REQUEST coltrnn.
Basis for O unge Program enhancement.
ITPM 72:
Change: In Appendix B, for valves BN ICV-8800A and BN ICV-8800B, a BT-C, FST and PIT were added to the TEST RQMT column, a Q, O, and 2Y were added to the TST FRE column, a 10 was added to the MAX STRK TIME column and a VR-1 was added to the RELIEF REQUEST column.
Basis for Change: -These valves are not always in their safety position and therefore are not passive.
ITFN 73:
Change: In Appendix B, for valves EF-V241 and EF-V242, the CVT-C was deleted in the TEST RQMT column, the RR was deleted from the TST FRE column, and VR-9 was deleted from the RELIEF REQUEST column.
Basis for Change: These valves perform no safety function in the closed direction.
ITFN 74:
Change: In Appendix B, for valves EF IN-44 and IN-43, the VR-2 was deleted in the RELIEF REQUEST column.
Basis for Change: Program enhanconent.
ITEN 75:
Change: In Appendix B, for valves EF IN-31, IN-32, IN-33, IN-34,
!!V-45, liv-46, IIV-49 and !!V-50, a BT-0 was added to the TEST RQm' column, a Q was added to the TST FRE column, and a 30 was added to the MAX STRK TIME column.
Basis for Change: Program enhancement.
ITFN 76:
Change: In Appendix B, for valves EF IIV-37 and liv-38, the BT-C was changed to BT-O in the TEST ROMT column.
Basis for Change: Program enhancement.
ITFN 77:
Change: In Appendix B, for EF llV-88 and EF IIV-87, the VR-2 was changed to VR-1 in the RELIEF REQUEST column.
Basis for Change: Program enhancement.
ITtM 78:
Qunge:
In Appendix B, the VR-2 was deleted in the RELIEF REQUEST column for the following valves: EG RV-9, EG RV-10, EJ liv-21, EJ IIV-22, EJ !!V-23, EJ IN-24, EJ IIV-25, EJ llV-26, EC FV-310, GS IIV-3, GS !!V-4, GS IN-5, GS IIV-8, GS IIV-9, GS IIV-12, GS IIV-13, GS IIV-14, GS IN-17, GS !!V-18, GS IIV-31, GS IIV-32, GS IIV-33, GS IIV-34, GS liv-36, GS IN-37, GS !!V-38, GS IIV-39, LF FV-96, SJ !!V-12, SJ IN-13, SJ IN-18, SJ IN-19, SJ IIV-131 and SJ IIV-132.
Ilasts for Change: Program enhancement.
ITEM 79:
Changa: In Aopendix B, for valves EG-V130, EG-V131, EG IN-15 and EG IN-16, the CS was changed to Q in the TST FRE column and Note 24 was deleted from the REMARKS coltznn.
Basis for Change: Progra:n enhancement.
ITPM 89:
Change: In Appendix B, for valves EG IN-53 and EG IN-54, PAS was deleted and BT-C, PIT were added to the TEST RQMT column, NA was deleted and Q, 2Y were added to the TST FRE coltunn, a 60 was added to the MAX STRK TIME column, and a Note 36 was added to the REMARKS coltunn.
Basis for Change: These valves are not always in their safety position and therefore not passive.
ITIM 81:
Change: In Appendix B, for valves EG IN-69A, IN-69B, IN-70A and IN-708, the /C from O/C was deleted in the NORM POS column.
Basis for Change: Program enhancement.
ITtN 82:
Change: In Appendix B, for valves EJ-8730A and B, a CVP-0 was added to the TEST ROMT column, a Q was added and the existing Q was changed to CS in the TST FRE column and a Note 33, 37 was added to the REMARKS column.
Ihsis for Change: Full stroke exercising these valves quarterly would pose a threat to plant safety.
ITPM 83:
Change: In Appendix B, for valves EJ-8841A and B, the C was replaced with an A/C in the IST CAT column, the VR-6 was replaced with VR-8 in the RELIEF REQUEST column, the Note 37 was deleted and a Note 45 added to the REMARKS coltunn.
Basis for Change: Program enhancanent/ System characteristics allow only full stroke exercising during cold shutdown.
ITPM 84:
Change: In Appendix B, for valves EJ-8958A and B, a CVP-0 was added to the TEST RQtfr coltrnn, a Q was added and the existing Q was changed to CS in the TST FRE column and a Note 33 was added to the REMARKS column.
Basis for Change: Program enhancement /Systen characteristics allow only full stroke exercising during cold shutdown.
'f 1
ITEN 85:
Change: In Appendix B, for valves EJ-8969A and B, the Note 26 was deleted and a Note 32 was added to the REMARKS column.
Basis for Change: Program enhancement.
ITFN 86:
Change: In Appendix B, for valves EJ IN-8701A and B, the VR-6 was changed to VR-8 in the RELICP REQUEST column.
Basis for Change: Program enhancement.
ITIN 87:
01ange: In Appendix B, for valves EJ IIV-8811A and B, the RR was changed to CS in the TST FRE column, the 18 was changed to 17 in the MAX STRK TIME column, the VR-ll was deleted from the RELIEF REQUEST column and a "34," was added to the REMARKS column.
Basis for Change: Program enhancement.
ITFM 88:
Ounge: In Appendix B, for valves EJ ECV-610 and FCV-611, a BT-O was added to the TEST ROMT column, a o was added to the TST FRE column and a 10 was added to the MAX STRK TIME column.
Basis for Change: Program enhancement.
ITEM 89 Cha p: In Appendix B, for valves EM-V001, V002, V003, V004, the RR was changed to CS in the TST FRE column, VR-6 and VR-12 woro deleted from the RELIEF REQUEST column and a Note 42 was added to the REMARKS coltm).
Basis for Chango: Program enhancement.
ITEM 90:
Chinger In Appendix B, for valves EM IN-8802A and B, the Q's Wero changed to CS's in the TST FRE column and a "28," was added to the REMARKS column.
Ikisis for Chango: System characteristics will allow testing only in cold shutdown.
ITtN 91:
Changer In Appendix B, for EM !!V-8888, the VR-2 was changed to VR-1 in the RELIEF REQUEST column.
Basis for Chmjo:
Program enhancement.
1 ITtM 92:
Chango: In Appendix B, for EM-8815 the RR was changed to CS in the TST FRE column, the VR-13 was doloted from the RELIEF l
REQUEST column and a Note 44 was added to the REMARKS column.
thisis for Change: Projram enhancement.
I
i i
ITEN 93:
O nnge: In Appendix B, for valves EN-V002 and EN-V008, the RR was changed to CS in the TST FRE column and a Note 1 was added to the REMARKS column.
1 Bas h f.r Change: Program enhancement.
ITEM 94:
Oiange: In Appendix B, for valves EN-V013 and EN-V017, a CVT-C was added to the TEST RCMT column, RR was changed to CS and a CS was added to the TST FRE colmn, and a Note 1 was added to the REMARKS column.
Basis for Change: Program enhancement.
ITDM 95:
01ange: In Appendix B, for valves EN !!V-15 and IN-16, a BT-C was added to the TEST RCMT column, CS was changed to Q and a 0 was added to the TST FRE column, a 5 was added to the MAX STRK TIME column and "33," was deleted from the REMARKS column.
i Basis for Omnge: Program enhancement.
ITtN 96:
Change: In Appendix B, for valves EN IN-1 and EN IN-7, the RR's I
were changed to CS's in the TST FRE column, the VR-16 was deleted in the RELIEF REQUEST column, and a "35," was added to the REMARKS column.
]
R3 sis for Charwy): Program enhancement.
t l
ITPM 97:
Oiange: In Appendix B, for valves EP-8818A, B, C, D, the RR was j
changed to CS in the TST FRE column, the VR-6 was changed to VR-8 in the RELIEF REQUEST column and a Note 45 was added to the REMARKS column.
i Basis for Qiange: Program enhancement.
ITPM 98:
Change:
In Appendix B, for valves EP-8956A, B, C and D, the RR was changed to CS in the TST FRE column and a Note 26 was added to the RELIEF REQUEST column.
j Basis for Change: Program enhancement.
ITtM 99:
Ounge: In Appendix B, for valves EP-V010, V020, V030, V040, the RR was changed to CS in the TST FRS column, the VR-6 was l
deleted in the RELIEF REQUEST column and a Noto 45 was added in the REMARKS column.
l.
Basis for Qunge: Program enhancement.
e
~., - _. - - -
,,-r...m..,
-,,----,yy-
,~..%-,
,-~re e_-.---..-,
..w--,_e.~,
ITFM 199: Onange: In Appendix B, for valves EP HV-8950A, B, C, D, E and F, the FL's were changed to CS's in the TST FRE column, the VR-18 was deleted in the RELIEF REQUEST colunn and a Note 39 was added to the REMARKS column.
Basis for Change: Program enhancemerit.
ITFM 101: Change: In Appendix B, for EP IN-8880, the VR-2 was changed to VR-1 in the RELIEF REQUEST column.
I Basis for Change: Program enhancement.
ITEN 192: Change: In Appendix B, for valves K-V001, FC-V002, FC-V024 and FC-V025, a CVT-C was added to the TEST ROMT column, a O was added to the TST FRE column, and a VR-16 to the RELIEF REQUEST column.
Basis for Change: Program enhancement.
ITFM 193: Change: In Appendix B, for valves GS IIV-30 and GS HV-35, a BT-0 and PIT were added to the TEST RQMT column, a Q and 2Y were added to the TST PRE column, and a 5 was added to the MAX STRK TIME colunn.
Ihsis for Ounge: Program enhancement.
ITPM 104: Change: In Appendix B, for valves GS-V054 and GS-V059, a CVT-0 was added to the TEST ROMT column and a Q was added to the TST FRE colunn.
Ibsis for Change: Program enhancement.
ITFM 195: Change: In Appendix B, for valves GT HZ-4, I!Z-5,11Z-11, and 11Z-12, the RR was changed to 0 in the TST FRE column and VR-2, VR-5 were deleted fran the RELIEF REQUEST colurrn.
Ihsis for Change: Program enhancement.
ITFN 196: Change: In Appendix B, for valves GT 11Z-6, HZ-7,112-8 and HZ-9, a VR-1 was added to the RELIEF REQUEST column.
Ibsis for Change: Program enhancement.
ITFN 197: Ch ego: In Appendix B, for KA FV-29, the RR's were changed to CS's in the TST FRE column, VR-19 was deleted from the RELIEF REQUEST colunn and a Note 40 was added to the REMARKS column.
thals for Change: Program enhancement.-
ITEN 198: Chan y: In Appendix B, for KA HV-30, the RR was changed to CS in the TST FRE column, VR-19 was deleted from the RELIEF REQUEST column and a,41 was added to the PIMARKS column.
Basis for Change: Program enhancement.
ITFM 199: Gange: In Appendix B, for valves KA-V648, KA-V649, FA-V650, KA-V651, KJ-V712A, KJ-V711A, KJ-V711B and KJ-V712B, the RR's were changed to 2Y's in the TST FRE colonn.
Ibsis for Change: Testing is performed every 2 years.
ITFM 119: Change: In Appendix B, for valves KJ W-1A, W-1B, W-101A and W-101B, the PIT was deleted from the TEST RQMT column, the 2Y was deleted from the TST FRE column, the 5 was deleted from the MAX STRK TIME column and VR-1 was changed to VR-6 in the RELIEF REQUEST column.
Basis for Change: These valves do not have remote position indicators.
ITEM 111: Change: In Appendix B, valves KJ-V716A, V717A, V716B and V717B, along with other associated information were added to the valve listing.
Ibsis for Charyjo: Program enhanceimnt.
ITPM 112: Change: In Appendix B, for valves SJ-V100, V101 and Vil6, the PAS was changed to CVT-O in the TEST RQMT column and the NA was changed to Q in the TST FRE column.
Basis for Change: Program enhancement.
ITFM 113: Change: In Appendix B, for valves SJ !!V-3, IN-4 and IN-20, deleted the PAS and added a BT-0, PIT in the TEST ROMT column, deleted the NA and added a Q, 2Y in the TST FRE column and added a 5 in the MAX STRK TIME coltunn.
tusis for Change: Program enhancanent.
ITtM 114: Change:
In Appendix B, for valves SJ IIV-5, llV-6, IN-127, IN-128,
!!V-129 and !!V-130, a BT-O was added to the TEST RQPfr column, a Q was added to the TST FRC colunn, a 5 was added to the MAX STRK TIME column and VR-2 was deleted fran the RELIEF REQUEST column.
tunis for Change Program en'.iancement.
4
ITtN 115: Change:
In Appendix B, for valves BB-8948A, B, C, D, BB-8949A, B, C, D and BB-V001, V022, V040, V059, the RR was changed to CS in the TST FRE column and a Note 45 was added to the REMARKS column.
Basis for Omnge: Program enhancement.
ITEN 116: Change: In Appendix B, for valves BG-8546A and B, a CVP-O was added to the TEST RCMT column, a 0 was added and the RR chancyx1 to CS in the TST FRE column, the VR-7 was deleted from the RELIEF REQUEST column and a Note 7 was added to the REMARKS column.
Basis for Change: Program enhancermnt.
ITFM 117: Change: In Appendix B, for valves EM-8922A and B, a CVP-O was added to the TEST RQMT column, a 0 was added and the RR changed to CS in the TST FRE column, the VR-12 was deleted from the RELIEF REQUEST column and a Note 42 was added to the REMARKS column.
Basis for Change: Program enhancement.
ITEN 118: Change: In Appendix B, for valves EM-8926A and B, the RR was changed to CS in the TST FRE column, the VR-14 was deleted in the RELIEF REQUEST column and a Note 43 was added to I
the REMARKS column.
l l
Basis for Change: Program enhancement.
ITtN 119: Qungo: In Appendix B, for valves IN-V240 and V241, the RR was changed to 0 in the TST FRE column and the VR-22 was deleted from the RELIEF REQUEST column.
Ikisis for Change: Program enhancement.
ITFM 129: Qunge: In Appendix B, the wording of notes 1, 24, 26 and 33 was revised due to the notes now being applicable to different valves than previously intended.
Ikisis for Change Program enhancement.
l l
ITPM 121: Qungo:
In Appendix B, Note 13 was revised clarifying and providing more reason that valves should be tested during cold shutdown.
Ikisis for Omnge: Program enhancement.
+
w
ITF21 122: d unje: In Appendix B, words were addel to Note 16 to provide information on valve stroke time requirements.
Basis for Change: Program enhancement.
ITFM 123: Change: In Appendix B, Notes 7 and 32 were revised to provide reasons for valve testing in cold shutdown.
Basis for cunge: Program enhancement.
ITFM 124: Ounge: In Appendix B, Notes 34, 35, 39, 40, 41, 42, 43, 44 and 45 were added to provide reasons for testing valves in cold shutdown.
Basis for dianje: Program enhancement.
F2CESURE TO 10ifMC 86-106 Inservice Testing Program For Pumps and Valves
.