Forwards Rev 5 to NMP2-IST-001, NMP Nine Mile Point Nuclear Station Unit 2,Pump & Valve First Ten-Yr Inservice Testing Program Plan, Per GL 89-04 & NUREG-1482
ML18040A244
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 09/26/1996
From: Terry C
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17059B292 List:
References
RTR-NUREG-1482 GL-89-04, GL-89-4, NMP2L-1664, NUDOCS 9610010295
Download: ML18040A244 (5)


Text

m~zaoar j.

REGULATle INFORMATION DISTRZBU4'IONSTEM (RIDE) f ACCESSION NBR 9610010295 DOC.DATE:,862'09(26 NOTARIZED: NO " DOCKET FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410

'AUTH. NAME AUTHOR AFFILIATION TERRY,C.D. Niagara Mohawk Power Corp.,

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk )

lSUBJECTS Forwards Rev 5 to NMP2-IST-001, "NMP Nine Mile Point Nuclear Station Unit 2,Pump 6 Valve First Ten-Yr Inservice Testing j

C Program Plan," per GL 89-04 6 NUREG-1482.

A DISTRIBUTION CODE: A047D TITLE: OR COPIES RECEIVED:LTR Submittal: Inservice/Testing/Relief ENCL ( SIZE: /4 from ASME Code GL-89-04 7S O T

NOTES: E RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 LA 1 1 PD1-1 PD 1 1 HOOD,D 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RAB 1 1 CENTER 1 1 NRR/DE/EMEB 1 1 N RACT 1 1 OGC/HDS3 1. 0 RES/DET/EMMEB 1 1 RES/DSIR/EIB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

U N

NOTE TO ALL URIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK/

ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION. LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14'NCL 13

IL l

NIAGARA MOHAWK C'E N E RAT I 0 N NINE MILE PDINT NUGLEAR sTATIQN/LAKERoAD, P.o. Box 63, LYCDMING,NEw YQRK 13093/TELEPHQNE (315) 349-7263 FAX (315) 349-4753 BUSINESS CROUP September 26, 1996 CARL D. TERRY NMP2L 1664 Vice President Nuclear Engineering U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Nine Mile Point Unit 2 Docket No. 50-410

Subject:

Pump and Valve Tn-Service Testing Program Plan Gentlemen:

Enclosed is the "Niagara Mohawk Power Corporation, Nine Mile Point Nuclear Station Unit 2

- Pump and Valve First Ten-Year Inservice Testing Program Plan," NMP2-IST-001, Revision

5. This revision supersedes the previous Revision 4 and incorporates changes made in accordance with Generic Letter 89-04, "Guidance on Developing Acceptable Inservice Testing Programs," 10CPR50.59, and various Commission Safety Evaluation Reports.

There are no ASME Code relief requests or deviations in this revision which require Commission evaluation or approval. This revision is being submitted in compliance with Generic Letter 89-04 and NUREG-1482, "Guidelines for Inservice Testing at Nuclear Power Plants."

Sincerely, C. D. Terry Vice President Nuclear Engineering CDT/JMT/kap Attachment xc: Regional Administrator, Region I (w/o attachment)

Mr. B. S. Norris, Senior Resident Inspector (w/o attachment)

Mr. D. S. Hood, Senior Project Manager, NRR (w/o attachment)

Records Management (w/ attachment)

A~AARA

'ttbi0010295 9b092b PDR ADOCK 050004i0 I 8 PDR

4 l

~ IV"'" 6 4r yi kC'r, ', 'jr:

c~~ , *I ~

sv@jp e >g $ T0g"'~>>

<<6I'v '

[R, T

~

~

5 ~>>

. p' UMP ANDIVALVE IN-SERVICE TESTING P OGRAM

~a I

Ir

'I;5,

". 119C'0 W/DTR D1D 9/26/96...9610010295

~, . " . 7 . ~r~ . A~'-Q5 kk .04%"~r PQ"i ..i'd&.s8 2" .',: - ~~. -; ~

'-..k

':"::;THE ATTACHED,FIL'ES ARE'OFpLF'ICj'A'j -"', .: I REC.ORDS OFTHE INFQ'RMAT'ION'jj;;;:"'"":

REC.'ORDS MANAGEMENT'fRA'IIICH

,.:;.',,; THEY,.HAVE BEEN CHARGED'TO-.yOU:",:.:

$FOR0A;i IMPUTED TlME. PE"RlOD'AN'"D:.'"'-':.'..;

- '.-'"; MUST:.BE RETURNED TO.THE" ":-.'p',,~-.,-i-

.',,'"".>RECORDS;8'ARCHlVES',SERVfCES;"-",";,'-;;,';;

...:.SEND,DOCUMENTS'CHARGED ~OUT~

'i',1:".'THROUGH'THE MAIL-';,

REMOI/ALOFT<,,'.

I",

'j.

~

)r.