ML20153E576
| ML20153E576 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 09/18/1998 |
| From: | Abney T TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9809280151 | |
| Download: ML20153E576 (3) | |
Text
Y SAFLUADb INFORMKflG LM Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609 September 18, 1998 10 CFR 50.54 (p)
U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentleman:
In the Matter of
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 BROWNS FERRY NUCLEAR PLANT - UNITS 1, 2, and 3 - UPDATE of l
PHYSICAL SECURITY / CONTINGENCY PLAN (PSP /CP) - REVISION 5 DATED AUGUST 31, 19951.
Pursuant to 10 CFR 50.54 (p), TVA has enclosed a revision to the subject PSP /CP.
TVA has determined that'these changes do not decrease the safeguards effectiveness of the plan and prior NRC approval is not. required.
Enclosed you will find the subject item and instructions for updating Nuclear Regulatory Commission (NRC) copies six (6) through eleven (11).
The Enclosure describes the details of this revision:
(1) security key and locks rotation, (2) re-approval of access list, (3) searching of guards on re-entering protected area,
(4) non-designated vehicle control, (5) contingency plan for security force strikes, (6) search requirements, and (7) administrative errors.
f The letter and the enclosed information is being sent by I
certified mail.
The signed receipt signifies that you have received this information and appropriate steps will be taken to update your controlled copies, and destroy superseded material.- This information contains safeguards material and should be withheld from public disclosure.
1/
9809280151 980918 PDR ADOCK 05000259 F
POR SAFEGUARD $ INFORMATION CLA5 SlfICATION DOES NoT APPt.Y TO THis PAGE WHEN SEPARATED FROM
^"^'"""'
SAFEGLARDS INFORVATDN
SAFEGUAR)S IN70RMATION U.S. Nuclear Regulatory Commission Pagd 2 1
l i
September 18, 1998 1
1 i
If you have any questions, please telephone me at (205) 729-2636.
Sine rely, eA W
, %anag. Abn E
M er of Site Licensitig and Industry Affairs cc (Enclosure):
Mr. A. W. De Agazio, Project Manager (w/o Enclosure)
U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852
~
Mr. H. O. Christiansen, Branch Chief (w/o Enclosure)
U.S. Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsyth Street S.W.
Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector (w/o Enclosure)
Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35611 U. S. Nuclear Regulatory Commission (w/ Enclosure) i ATTN: Mr. G. A. Belisle Special Inspection Branch P. O. Box 2257 Atlanta, Georgia 30301 l
SAFEGUARDS INFORMATlON CLAS.
( SIFICATION DOES NOT APPLY TO 1
THi$ PAGE WHEN SEPARATED FROM r ATTACHMENTS.
SAFIGUA13s IS?OxVATION
SA:iG _ AR JS N:0RMA"l0N TENNESSEE VALLEY AUTHORITY (TVA)
BROWNS FERRY NUCLEAR PLANT (BFN)
PHYSICAL SECURITY / CONTINGENCY PLAN September 18, 1998 l
1 1
Revision 0 Revised July 28, 1995 i
Revision 1 Revised October 19, 1995 Revision 2 Revised February 29, 1996 Revision 3 Revised May 13, 1996
' Revision 4 Revised February 2, 1998 Revision 5 Revised September 18, 1998 l
' M te Vi fesident Browns Ferry uclear Plant i
4 1
'Date WARNING:
UNAUTHORIZED DISCLOSURE IS SUBJECT TO ADMINISTRATIVE AND CRIMINAL PENALTIES ebm CLASSIFIED BY:
e a
- r TITLE:
Security Coordinator
' ORGANIZATION: Browns Ferry Site Security DATE:
9/18/98 l
SAFEGUARDS INFORMATION CLAS.
$1FICATION DOES NOT APPLY TO S A FEG U A R DS I N 0 R M AT O N
^HIS PAGE WHEN SEPA Tnac"~"u
-