Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203B726 + (Forwards Rev 10 to MP 703.3, CRD Replacement Using Nuclear Energy Services Tooling, Rev 3 to MP 703.6, CRD Housing Thermal Sleeve Replacement & Rev 1 to MP 770.14, Main Condensate Pump Motor Maint, Do Not Use Status)
- B14358, Forwards Rev 10 to Millstone Nuclear Power Station Suitability,Training & Qualification Plan.Plan Withheld (Ref 10CFR50.54(p)) + (Forwards Rev 10 to Millstone Nuclear Power Station Suitability,Training & Qualification Plan.Plan Withheld (Ref 10CFR50.54(p)))
- B10656, Forwards Rev 10 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 10 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20127B065 + (Forwards Rev 10 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML19336E329 + (Forwards Rev 10 to Monticello Security Training & Qualification Plan Per 10CFR50.54(p).Plan Withheld Per 10CFR73.21)
- ML17056B922 + (Forwards Rev 10 to Nine Mile Point Nuclear Station Unit 1 FSAR (Updated) Vols 1-4 & Annual 10CFR50.59 Safety Evaluation Summary Rept of Changes to Facility Design,Fsar (Updated),Procedures,Tests & Experiments)
- ML20237K190 + (Forwards Rev 10 to Northeast Utilities QA Program (Nuqap) Topical Rept. Wv Johnston Ack Receipt & Accepting Rev to Rept & Ej Mroczka Forwarding Rev Encl)
- ML20078M773 + (Forwards Rev 10 to Offsite Dose Calculation Manual for LaSalle & Quad Cities & Rev 9 to Offsite Dose Calculation Manual for Braidwood,Consisting of Chapters 7.2 & 8.0)
- ML20094K046 + (Forwards Rev 10 to Offsite Dose Calculation Manual)
- ML20211D490 + (Forwards Rev 10 to Operational QA Program Description (WPPSS-QA-004). Rev Reflects Organizational Changes)
- ST-HL-AE-4285, Forwards Rev 10 to Operations QA Plan + (Forwards Rev 10 to Operations QA Plan)
- ML20070F294 + (Forwards Rev 10 to Operations QA Plan)
- ML20236C181 + (Forwards Rev 10 to Physical Security & Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- ML20127L443 + (Forwards Rev 10 to Physical Security Plan Re Identification Badge Program.Rev Withheld (Ref 10CFR73.21))
- ML20214X303 + (Forwards Rev 10 to Physical Security Plan,Reflecting Amends to 10CFR50 & 73 & Summary of Changes.Rev Withheld (Ref 10CFR73.21 & 2.790))
- ML20203M892 + (Forwards Rev 10 to Physical Security Plan,Rev 2 to Security Personnel Training & Qualification Plan & Rev Summary.Revs Withheld (Ref 10CFR73.21))
- ML20151U545 + (Forwards Rev 10 to Physical Security Plan,Safeguards Contingency Plan & Security Training & Qualifications Plan. Plans Withheld (Ref 10CFR73.21))
- ML20137U690 + (Forwards Rev 10 to Physical Security Plan,Safeguards Contingency Plan & Security Training & Qualifications Plan. Rev Withheld (Ref 10CFR73.21))
- ML20206T559 + (Forwards Rev 10 to Physical Security Plan,Providing Chronology of Current Status of Revs 1-9.Rev Withheld (Ref 10CFR73.21))
- U-601778, Forwards Rev 10 to Physical Security Plan & Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21(c)(2)) + (Forwards Rev 10 to Physical Security Plan & Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21(c)(2)))
- ML20214P110 + (Forwards Rev 10 to Physical Security Plan,Incorporating Changes within Scope of 10CFR50.54(p) Which Do Not Decrease Effectiveness of Program & Changes Required by 860804 Rev to 10CFR73.55.Rev 10 Withheld (Ref 10CFR73.21))
- RBG-25093, Forwards Rev 10 to Physical Security Plan & Explanation of Changes.Encls Withheld (Ref 10CFR73.21) + (Forwards Rev 10 to Physical Security Plan & Explanation of Changes.Encls Withheld (Ref 10CFR73.21))
- AECM-84-0184, Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5) + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790 & 10CFR9.5))
- ML20012F647 + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d) & 73.21))
- ML20083D020 + (Forwards Rev 10 to Physical Security Plan Updating Procedure to Require Reporting Major Physical Security Events to NRC Operations Ctr No Later than 1 H Following Security Event.Rev Withheld (Ref 10CFR2.790))
- W3P86-2809, Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20042G650 + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- L-85-344, Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- RBG-28824, Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- L-85-462, Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 10 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20153G196 + (Forwards Rev 10 to Physical Security/Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- ML20245A340 + (Forwards Rev 10 to Physical Security/Contingency Plan.Rev Withheld (Ref 10CFR73.21))
- ML20066L414 + (Forwards Rev 10 to Pilgrim Nuclear Power Station Emergency Plan)
- B13331, Forwards Rev 10 to Plant Physical Security Plan.Explanation of Changes Also Encl.Encls Withheld (Ref 10CFR73.21(b) & 2.790(a)) + (Forwards Rev 10 to Plant Physical Security Plan.Explanation of Changes Also Encl.Encls Withheld (Ref 10CFR73.21(b) & 2.790(a)))
- ST-HL-AE-2391, Forwards Rev 10 to Plant Security Personnel Training & Qualification Plan,Including Changes Resulting from Aug 1987 Nuclear Training Assessment.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 10 to Plant Security Personnel Training & Qualification Plan,Including Changes Resulting from Aug 1987 Nuclear Training Assessment.Rev Withheld (Ref 10CFR73.21))
- ML20153D271 + (Forwards Rev 10 to Plant Training & Qualification Plan.W/O Encl)
- ML20125D109 + (Forwards Rev 10 to Prairie Island,Units 1 & 2 Security Training & Qualification Plan.Plan Withheld Per 10CFR73.21)
- ML13324A932 + (Forwards Rev 10 to Progress Rept on Ongoing Selected Regulatory Projects for Facility,Including long-term Svc Seismic Upgrade,Fire Protection & Environ Qualification Projects)
- ML20135B801 + (Forwards Rev 10 to Pump & Valve Inservice Testing Program for Incorporation Into Pump & Valve Inservice Testing Manual. Revs Will Be Implemented by 850901)
- ML20135B804 + (Forwards Rev 10 to Pump & Valve Inservice Testing Program for Incorporation Into Pump & Valve Inservice Testing Manual. Revs Will Be Implemented by 850901)
- 0CAN098808, Forwards Rev 10 to QA Manual Operations + (Forwards Rev 10 to QA Manual Operations)
- 0CAN098809, Forwards Rev 10 to QA Manual Operations. Rev Pertains Primarily to Organizational Changes & Changes to Reflect Current Practices in Implementing Manual Requirements + (Forwards Rev 10 to QA Manual Operations. Rev Pertains Primarily to Organizational Changes & Changes to Reflect Current Practices in Implementing Manual Requirements)
- ML20235V316 + (Forwards Rev 10 to QA Manual for Design,Const, Preoperational Testing & Operation. Rev Updates & Expands Organization Section to Reflect Changes in Unit 2 Project Organization & to Include Key Positions in Unit 1 Dept)
- ML20046A310 + (Forwards Rev 10 to QA Manual to Clarify 10CFR21 Reporting Procedures)
- ML20138E658 + (Forwards Rev 10 to QA Program Per 10CFR71.101,Paragraph (F), for Review & Approval Per 10CFR71.101)
- ML20138E662 + (Forwards Rev 10 to QA Program Per 10CFR71.101,Paragraph (F), for Review & Approval Per 10CFR71.101)
- ML20215C652 + (Forwards Rev 10 to QA Program Topical Rept, for Review & Approval.Fee Paid)
- ST-HL-AE-1201, Forwards Rev 10 to QA Program for Design & Const Phase.Rev Allows Compliance W/Ansi N45.2.6-1978 & Rev 1 to Reg Guide 1.58 + (Forwards Rev 10 to QA Program for Design & Const Phase.Rev Allows Compliance W/Ansi N45.2.6-1978 & Rev 1 to Reg Guide 1.58)
- ML17254A412 + (Forwards Rev 10 to QA Program for Station Operation, Incorporating Changes to Corporate & Engineering Dept Organization Charts Due to Reestablishment of Chief Engineer Position Below Vice President Position)
- ML17254A413 + (Forwards Rev 10 to QA Program for Station Operation, Incorporating Changes to Corporate & Engineering Dept Organization Charts Due to Reestablishment of Chief Engineer Position Below Vice President Position)
- ML20128K703 + (Forwards Rev 10 to QA Program.Safety Evaluation Also Encl)