Text
The Light c o m p a n y """'h l" ""d"' """ * ""i"8 ' ' ' ' " " " ' " " " " ' "
"""""h'l"*"'
llouston 1.ighting A l'ower December 16, 1992 ST-ilL-AE-4 2 8 5 File lio. :
G09.11 10CFR50.54 U.
S. 11uclear Regulatory Commission Attention:
Document Control Desk Washington, DC 20555 South Texas Project Units 1 and 2 Docket lios. STl1 50-498, ST14 50-499 Revised _Qppretions Ouplity Assurance Plan Pursuant to 10CFR50.4, llouston Lighting & Power Company (HL&P) submits the attached revised chapters of the Operations Quality Assurance Plan (OQAP).
A description of the incorporated changes is included with the revised chapters.
HL&P has reviewed this revision to the OQAP in accordance with 10CFR50.54 and 10CFR50.59 and determined that there is no reduction in effectiveness of the OQAP and there are no unreviewed safety questions.
If there are any questions, please contact either Mr.
P. L. Walker at (512) 972-8392 or me at (512) 972-8434.
Hall Group Vice President, 11uclear PLW/ag
Attachment:
1.
Changes to the OQAP 2.
Revised Operations Quality Assurance Plan Chapters b1hb1'8
}k l
HISC\\92-344.001 4 c.'bsidiary of Ilouston Industties ]ncorporated 9212220120 921216 l
DR ADOCK 0500 0
D
9 ST-HL-AE-4285 File No.:
G09.11 Page 2 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter
)
)
Houston Ligating & Power
)
Docket Nos. 50-498 Company, et al.,
)
.50-499
)
South Texas Project
)
Unit 1 and 2
)
AFFIDAVIT D.
P. Hall being duly sworn, hereby deposes and says that he is Group Vice President, Nuclear of Houston Lighting & Power Company; that he is duly authorized to sign and file with the Nuclear Regulatory Commission the attached revision to the operations Quality Assurance Plan; is familiar with the content thereof; and that the matters set forth therein are true and correct to the best of his knowledge a 1
D. PRiad Group Vice President, Nuclear-STATE OF TEXAS
)
)
)
Subscribed and sworn to before me, a Notary Public in and.
for The State of Texas this /rthday of _ Oece;$ W
, 1992.
z
\\.
lL "33",,,,
Ocdn'%Dm /
l u, commen tem 6 2t95 j
Notary Public 9n and fp the l
j-h State of Texas MISC \\92*-344.001
o Ilouston Lighting & Power Company ST-HL-AE-4 2 8 5 South Texas Project Electric Generating Station File No. I G09.11 Page 3 cc Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 400 Houston Lighting & Power Company Arlington, TX 76011 P. O.
Box 61867 Houston, TX 77208 George Dick, Project Manager U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway J.
I. Tapia Atlanta, GA 30339-3064 Senior Resident Inspector c/o U. S. Nuclear Regulatory Dr. Joseph M. Hendrie Commission 50 Bellport Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C.
Texas Department of Health 1615 L Street, N.W.
1100 West 49th Street Washington, DC 20036 Austin, TX 78756-3189 D. E. Ward /T. M. Puckett Central Power and Light Company P.
O. Box 2121 Corpus Christi, TX 78403 J.
C. Lanier/M. B. Lee City of Austin Electric Utility Department P.O.
Box 1088 Austin, TX 78767 K. J. Fiedler/M. T. Hardt City Public Service Board P.
O.
Box 1771 San Antonio, TX 78296 Revised 10/11/91 L4/NRC/
i r
ST-HL-AE-4285 Page 1 of 5 CHANGES TO THE OQAP Chapter 1.0, Revision 6, Organization Incorporated Change QA-004 Added " Nuclear Engineering," to paranraph 5.1.3.
Added paragraph 5.1.3.4 to define the position of
" Manager, Nuclear Engineering" and this position's reporting relationship.
Added " Nuclear Engineering" to Attachment I, Chapter 1.0, Nuclear Group - QA Functions.
NOTE This change was evaluated in USQE 91-0064.
The Nuclear Engineering Department was subsequently deleted as a departuent reporting to the Vice President of Nuclear Engineering. Its duties and responsibilities were reassigned as summarized in OQAP change QA-011.
Incorporated change QA-006 Deleted the responsibility for the Site Access Authorization Program from the Manager of Nuclear Security responsibilities, paragraph 5.1.2.2.
Changed the name of the " Site Access Authorization program" to the " Plant Access Authorization Program" and added the responsibility for this program to the Manager of Nuclear Licensing responsibilities, paragraph 5.1.6.
Deleted paragraph 5.1.7.
This paragraph defined the Human Resources - Nuclear's supporting function for the Site Access Authorization Program. Under the current organization this role is no longer defined or required.
Incorporated QA-006 organizational changes into Attachment I, Chapter 1.0, Nuclear Group - QA Functions.
NOTE This change was evaluated in USQE 92-0006.
l
l ST-HL-AE-4285 j
Page 2 of 5 CHANGES TO THE OQAP Incorporated Change QA-008 s
]
Deleted the responsibility for maintaining the Approved Vendors List from the Manager of Nuclear Purchasing and Materials Management, paragraph 5.1.3.1.
NOTE This task has been assumed by the Nuclear Assurance Department; however, the task definition is below the level of detail for the responsibilities of the General Manager Nuclear Assurance provided in the OQAP and thus not included.
j Incorporated Change QA-009 i
Changed the words " Quality Engineering" to "QA Reviews" in Attachment II, Chapter 1.0, Nuclear Assurance Responsibilities.
NOTE This change was directed by Nuclear Assurance Management to eliminate any confusion which might have occurred from the Quality Assurance Department reorganization which eliminated the Quality Engineering Section and reassigned committed functions to other sections within Quality Assurance.
Incorporated Change QA-010 Changed paragraphs 5.1.4 and 5.1.4.1 to delete'the Vice President Nuclear Support and reflect the General Manager of Information Resources as a Direct Report to the Group Vice President Nuclear.
Incorporated QA-010 organizational changes into Attachment I, Chapter 1.0, Nuclear Group - QA Functions.
ST-HL-AE-4285 Page 3 of 5 c
CHANGES TO THE OQAP Incorporated Change QF-011 NOTE This change deletes the Nuclear Engineering Department as a reporting department to the Vice President of Nuclear Engineering. Its duties and responsibilities-were reassigned as summarized below.
Changed paragraph 5.1.3 to specify "... 'overall' responsibilities...
I Identified the General Manager Nuclear Engineering and defined his responsibilities and reporting relationship in paragraph 5.l.3.1.
Identified the Nuclear Fuel Manager and-defined his j
responsibilities and reporting relationsnip in l\\
paragraph 5.1.3.2.
Identified the Plant Analysis Manager and defined his responsibilities and reporting relationship in paragraph 5.1.3.3.
Changed paragraph 5.1.3.4 to specify "... ' issuance' of equipment and materials."
Added the administration of tha Nuclear Fuel Contract and the Nuclear Fuel Design Interface between Westinghouse and STPEGS to the responsibilities-v? che Manager of Plant Engineering la paragraph 5.1.3.6.
Changed the: reporting relationship of the Manager of Nuclear Purchasing and Materials Management (paragraph 5.1.3.4), the Manager 13f Design Engineering (paragraph 5.1.3.5), and'the Manager of Plant Engineering (paragraph 5.1.3.5)- from the Vice President of Nuclear-
-Engineering to the General Manager.of Nuclear Engineering.
Deleted." Nuclear Engineering" as a department-reporting te.the Vice President of Nuclear Engineering in Attachment I, Chapter 1.0, Nuclear Group - QA Functions.
J 4
ST-HL-AE-4285 r
Page 4 of 5 CHANGES TO THE OQAP
)
NOTE Editorial change to Chapter 1.0, paragraph 5.1.6, change Manager of Nuclear Licensing to General Manager Nuclear Licensing.
This reflects a position upgrafe with no change in OQAP related responsibilities Editorial change to chapter 1.0, paragraph 5.1.L..,
change Managar of Nuclear Licensing to General Manager Nuclear Licensing.
This reflects P. position upgrade with no change in OQAP related reaponsibilities.
Editorial change to Chapter 1.0, paragraph 5.1, change j
" Nuclear Support" to "Information Resources".
2 4
i Chapter 2.0, Pevision 8, Program Description Incorporated Change QA-005 as follows:
Changed paragraph 2.0 to read, and Station Blackout (SBO) systems and equipment."
Add new reference "4.5 10CFR50.63, Loss of All Alternating Current Power."
Incorporated Change QA-007 Deleted paragraphs 5.9.2, 5.9.4 & Attachment'II.
Revised paragraph 5.9.3 and renumbered it 5.9.2.
This paragraph's intent was to reduce. existing confusion in 1
procedure definition and to accommodate the impending change to the Station's procedure program.
j Incorporated Change QA-009 Changed the words " Quality Engineering" to "QA Reviews" in paragraph 5.4.3.
4 NOTE This change was directed by Nuclear Assurance Management to eliminate any confusion which might have occurred from the Quality Assurance Department reorganization which eliminated the Quality Engineering Section and reassigned committed functions to other sections within Quality Assura:
e.
i'-
t, a
4 ST-HL-AE-4285 l
Page 5 of 5
. CHANGES TO THE OQAP l
Chapter 6.0, Revision 6, Design and Modification Control l
Incorporated Change QA-012 l
j Changed paragraph 5.2.4 to delete,
" Procedures shall identify design documents-which require-'an inline QA review.-This review is--for seismic.and quality _ group -
classification, selection of quality standards, and any-j deviation from-quality standards, i
NOTE
]
This change was evaluated in USQE 92-0036.
i 4
4 d
1 I
i 4
I I
i i
)
i l
l-J I
Y 1
l w
w
-+
w w,,
.y-
,--e v
,wn.~
e- -e v v., y
.,wy yy,..v,,
,--~i,--w<-
4 i
i 4
4 4
1 i
i 1
4 i
l t
1
,