ML20203M892

From kanterella
Jump to navigation Jump to search
Forwards Rev 10 to Physical Security Plan,Rev 2 to Security Personnel Training & Qualification Plan & Rev Summary.Revs Withheld (Ref 10CFR73.21)
ML20203M892
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/25/1986
From: Agosti F
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
VP-86-0104, VP-86-104, NUDOCS 8609050134
Download: ML20203M892 (2)


Text

'

a i, ~.

C' 2 *C" Nuclear Operations EdisonEE "

1k.

DetrOil r.mo g,.v_

SAFEBUARDS INFORMATION August 25, 198.6 VP-86-0104 ilr. James G. Koppler Regional Administrator Region III U. S. Nuclear Regulatory Conmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr. Keppler:

Referencen: (1)

Fermi 2 NRC Docket No. 50-341 URC License No. NPF-43 (2)

Inspection Report 85047 dated February 11, 1986.

(3)

Inspection Report 86014 dated June 23, 1986.

(4)

Letter, W. L. Axelson to F. E. Agosti da*.ed March 6, 1986.

(5)

Letter, W. L. Axelso, to F. E. Agosti dated April 3, 1985.

(f)

Letter, W. L. Axelson to F. E. Agosti dated April 9, 1986.

Subject:

Physical Security and Safeguards Contingency Plans (Revision 10) and Security Personnel Trainina and Qualification Plan (Revision 2)_

In accordence with 10CFR50.54(p), six (6) copies of the Physical Security Plan Revision 10 (including the Safeguards contingency Plan as Chapter 8), the Security Personnel Training and Qualification Plan Revision 2, and the revision summary describing the revisions are attached.

SAFEGUARDS INFORMATION 8

4 0

WHEN SEPARATED FROM ENCLOSURES, HANDLE pp f

' THIS DOCUMENT AS DECONTROLLED.

) g 8609050134 860825 PDR ADOCK 0500 1

~-

~

Mr. James'G. Keppler EfMS Inf0 MON August 25, 1986 VP-86-0104 Page 2-As discussed with Mr. Madeda, Mr. Knicely, and Mr. Kers of your of.fice, these changes do not decrease the safeguards effectiveness of the plans.

The plans are revised to enhance the operational effectiveness of the Security Program by eliminating redundancy and clarifying existing requirements.

The revisions also address NRC concerns identified in References 2 and 3 (item numbers 85047-01, 85047-20, 85047-22, and 86014-05).

Additionally, changes have been incorporated-into the Physical Security Plan to respond to URC comments (contained in References 4, 5, and 6) concerning previous revisions to the Physical Security Plan.

As-discussed most recently with Mr. Kers, these revisions are prepared and submitted pursuant to 10CPR50.54(p).

Detroit l

Edison is in the process of implementing these revisions to improve the security program and to address concerns identified E

in references 4 through 6; however, revision 10 will not be l

fully implemented pending your staff's concurrence.

If you need further information regarding these revisions or have any other questions regarding this matter please contact Mr. Joseph E. Conen at (313) 586-5083.

Sincerely,

/)

/

C"~- -W' [ /

,vV cc:

(* with attachment)

H.R. Denton*

M.D. Lynch

  • U.G. Rogers USNRC Document Control Desk Machington, D.C.

20555 SAFEGUARDS INf0RA! Ail 0N O 'f T O M I % W A 05%cMI07WC W SEPARATED FROM ENCLOSURES, HANDLE c,3...ygg.p00UMEllI AS DECONTROLLED 05 m @jf/Q9 y SEP 0 21986