Forwards Rev 10 to Operational QA Program Description (WPPSS-QA-004). Rev Reflects Organizational Changes
ML20211D490
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/30/1986
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20211D493 List:
References
NUDOCS 8610220206
Download: ML20211D490 (2)


Text

-__. _ _ _ _ _ _ - _____ __ _ _ _ _ _ _ _ _

, WASHINGTON PUBLIC POWER SUPPLY SYSTEM "N P.O. Box 968

  • 3000 George \Yashirugtort \ Yay
  • Richiarsd, \Yashirugtt!r?593'f2

'l12:t.g

:i! ; y,,

September 30, 1986 Mr. J. B. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596

Dear Mr. Martin:

Subject:

OPERATIONAL QUALITY ASSURANCE PROGRAM DESCRIPTION (WPPSS-QA-004), REVISION 10 Enclosed for your use are two copies of revised pages of our Operational QA Program Description (WPPSS-QA-004), Revision 10. These are replacement pages and should be inserted in your copies of WPPSS-QA-004, Revision 9, as follows:

Remove Insert Cover Page, Rev. 9 Cover Page, Rev.10 List of Effective Pages,

~

List of Effect1.ve Pages, Page 111, Rev. 9 Page iii, Rev.10 Section 1: Pages 1-1 thru l-23, Section 1: Pages 1-1 thru l-23, Rev. 9 Rev. 10 Section 2: Pages 2-1 thru 2-4, Rev. 9 Section 2: Pages 2-1 thru 2-4, Rev.10 Section 13: Page 13-1, Rev. 5 SecL'on 13: Page 13-1, Rev.10 Section 18: Page 18-1, Rev. 5 Section 18: Page 18-1, Rev.10 The subject revision has been prepare <1 to riflect (a) organizational changes which have occurred since Revision 9 was issued, (b) clarification of msponsibilities for the positions Manager, Construction Quality Assurance (paragraph 1.3.2.2a) and the Plant Manager (paragraph 1.3.3.lh), (c) change of frequency for independent evaluations of the QA Program (paragraph 2.2.6) from

" biannually" to "once per two (2) years" - a typographical error which was not caught during the review process of Revision 9 draft, (d) editorial changes on Pages 1-4 thru l-6, 2-4, and 18-1, and (e) strengthened programmatic requirements for controlling storage (including shelf-life) of spare parts (paragraph 13.2.4),

7 7 e6102 g g 8g0 0 g PDR -

P I!/

'bM

kr. J. B. Martin, Regional Administrator

. U.S. NRC - Region V Page Two The above described changes have been evaluated and determined that they neither involve a reduction of commitments previously accepted by the Nuclear Regulatory Commission, nor do they involve a reduction of QA/QC responsi-bilities previously assigned to the Licensing and Assurance organization.

Should you have any questions regarding this transmittal, please contact Mr.

C. H. McGilton, Manager, Operational Assurance Programs at (509) 372-5143.

Very truly yours, G. C. Sorensen, Manager Regulatory Programs

Enclosure:

As stated.