Forwards Rev 10 to Nine Mile Point Nuclear Station Unit 1 FSAR (Updated) Vols 1-4 & Annual 10CFR50.59 Safety Evaluation Summary Rept of Changes to Facility Design,Fsar (Updated),Procedures,Tests & Experiments
ML17056B922
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/29/1992
From: Firlit J
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17056B923 List:
References
NMP1L-0676, NMP1L-676, NUDOCS 9207020001
Download: ML17056B922 (10)


Text

ACCELERATED DISTMBUTION DEMONSTPA.TIQN SYSTEM REGULRTC:NFORYiATTON DIBTRTBUTTON+STEM

( RZDB

)

ACCES~sIC4 ~ABBR:9207020001 DOC.DATE: 92/06/29 NOTARIZED: YES FACIL:50~220- Nine Mile Point Nuclear Station, Unit 1, N'agara Powe AUTH.NAME AUTHOR AFFILIATION FIRLITFJ.F.

Niagara Mohawk Power Corp.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards Rev 10 to "Nine Mile Point Nuclear Station Unit 1

FSAR (Updated)" Vols 1-4 a annual 10CFR50.59 safety evaluation summary rept of changes to facility design,FSAR (updated),procedures, tests

& experiments.

A'I DISTRIBUTION CODE:

A053D COPIES RECEIVED:LTR ENCL SIZE TITLE: OR Submittal:

Updated FSAR (50.71) and endments I

mOVES: gWH g~>

DOCKET 4

05000220

+>illm S

RECIPIENT ID CODE/NAME PDl-1 LA BRINKi41AN,D.

INTERNAL: ACRS NRR/DST 8E2 RGNl EXTERNAL: IHS NSIC COPIES LTTR ENCL 1

0 1

1 2

2 1

0 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-1 PD OA IRB REG FILE 01 NRC PDR SAIC ATEFI,B.

COPIES LTTR ENCL 1

0 1

1 1

1 1

1 1

1

'D, D,

D NOTE TO ALL"RIDS" RECIPIENIS:

D' PLEASE HELP US TO REDUCE WAS'ONTACTTHE DOCUMENT CONTROL DESK.

ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISHUBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 13 ENCL 10

i'+

V MIIASA,IRK U 9g(ogg@5fK NIAGARAMOHAWKPOWER CORPORATION/301 PLAINFIELDROAD, SYRACUSE, N.Y. 13212/TELEPHONE (315) 474-1511 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.

20555 June 29, 1992 NMP1L 0676 Re:

Nine MilePoint Unit 1 Docket No. 50-220 DPR-Gentlemen:

SUBJECT:

SUBMITlALOF REVISION 10 TO THE NINE MILEPOINT NUCLEAR STATION UNIT 1 FINALSAFETY ANALYSISREPORT (UPDATED) AND THE ANNUAL10 C.F.R. 550.59 SAFETY EVALUATION

SUMMARY

REPORT.

Pursuant to the requirements of 10 C.F.R.

$50.71(e) and 10 C.F.R.

$50.59(b), Niagara Mohawk Power Corporation hereby submits Revision 10 to the Nine Mile Point Nuclear Station Unit 1 Final Safety Analysis Report (FSAR) (Updated) and the annual Safety Evaluation Summary Report.

One (1) signed original and ten (10) copies of the FSAR (Updated) Revision 10 are enclosed.

Copies are also being sent directly to the Regional Administrator, Region I, and the Senior Resident Inspector at Nine Mile Point.

The Unit 1 FSAR (Updated) has been reprinted double-sided and reassembled in new binders.

Allpages submitted to update, revise, or add pages to the report have been appropriately inserted into the report.

The updated and/or revised pages indicate Revision 10, June 1992, and are annotated by vertical bars placed in the page margin.

The FSAR (Updated) revision contains changes made since the submittal of Revision 9 in June 1991.

The certification required by 10 C.F.R.

$50.71(e)(2) is attached to this letter.

Niagara Mohawk's letter dated November 16, 1989 (NMP1L 0455) provided a response to Notice of Violation EA 89-70.

Violation II.F identified specific instances in which the original FSAR was not revised to reflect changes to the facility, as required by 10 C.F.R.

$50.71(e).

Niagara Mohawk's response to this violation included a commitment to conduct a FSAR verification program.

The verification program is progressing and willcontinue under the direction of our Licensing Department.

Identified FSAR deviations are being documented and resolved in accordance with established procedures.

As this is a continuing verification program, our annual FSAR updates include any FSAR changes that result from this effort. The FSAR Verification Program is scheduled to be completed in November 1994.

+20&2~

9207020005 05000220

gDOC,

pQR Po~S~

r I

4

- Niagara Mohawk has also initiated a number of activities to improve the format, content and general ease of use of the Unit 1 FSAR (Updated).

These improvements willprovide an enhanced framework for the incorporation of future FSAR changes, thereby contributing to continued compliance with the requirements of 10 C.F.R.

$50.71(e).

Several of these improvements are reflected in Revision 10 of the FSAR (Updated):

1.

The report has been printed double-sided and reassembled in new binders to reduce the overall volume of each binder and to facilitate removal and insertion of pages.

2.

The Fire Hazards Analysis (FHA) and the Safe Shutdown Analysis (SSA),

previously published as separate documents that were incorporated into the FSAR (Updated) by reference, have been incorporated directly into the FSAR (Updated) as Appendices 10A and 10B, respectively.

This willpermit FHA and SSA changes to be made on a page replacement basis (rather than republishing the entire document as a new revision), and emphasizes to FSAR (Updated) users that the FHA and SSA are integral parts of the licensing basis documentation for Unit 1.

Other improvements under active development by NMPC include:

1.

Replacement of the current FSAR P&ID figures (which are unique to the FSAR) with improved figures that are derived directly from engineering P&IDs produced by computer-aided design methods.

2.

Reformatting the entire FSAR (Updated) using as guidance the standard format of Regulatory Guide 1.70, Revision 3.

These initiatives will: (1) establish a uniform report format; (2) assist FSAR (Updated) users in locating information within the report; and (3) help assure the completeness and consistency of the information presented.

The enclosed annual Safety Evaluation Summary Report contains brief descriptions of changes to the facility design, FSAR (Updated), procedures, tests, and experiments.

None of the Safety Evaluations involved an unreviewed safety question as defined in 10 C.F.R.

$50.59(a)(2).

In addition, none of the changes to the Fire Hazards Analysis and the Safe Shutdown Analysis (FSAR (Updated) Appendices 10A and 10B) resulted in a decrease in the effectiveness of the Fire Protection Program.

Very truly yours, Joseph F. Firlit Vice President Nuclear Support JJL/mls 002797GG Enclosure

4

- xc:

Regional Administrator, Region I Mr. R. A. Capra, Project Director, NRR Mr. D. S. Brinkman, Senior Project Manager, NRR Mr. W. L. Schmidt, Senior Resident Inspector Records Management

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of Niagara Mohawk Power Corporation (Nine Mile Point Unit 1)

Docket No, 50-220 CERTIFICATION Joseph F. Firlit, being duly sworn, states that he is Vice President, Nuclear Support of Niagara Mohawk Power Corporation; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this certification; and that, in accordance with 10 C.F.R.

$50.71(e)(2), the information contained in the attached letter and updated Final Safety Analysis Report accurately presents changes made since the previous submittal necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement and contains an identification of changes made under the provisions of $50.59 but not.

previously'submitted to the Commission.

Joseph F. Firlit Vice President Nuclear Support of Subscribed and sworn to before me, a Notary Public in and for the State of New York and County

, this 89 day of ~~~,

1992.

Notary Public in and for County, New York My Commission Expires:

. 2 l0't'l 40HN C. JDSH Nay Pubs 8tato ofNeeVb4 Na 48$7SOS OedShdto Coeehehe Ryhea SL CSKIN

~

~ ~

R t

I HGOLDNlO 5XVeeHh oef8 4t~kAym@4 QCTCCbaà el hCBae5 At,Q" eeAp8 rektierm5