ML17254A412
| ML17254A412 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 06/05/1985 |
| From: | Rober R ROCHESTER GAS & ELECTRIC CORP. |
| To: | Murley T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML17254A413 | List: |
| References | |
| NUDOCS 8506240367 | |
| Download: ML17254A412 (4) | |
Text
r REGULATORY It~RRATION OISTRI8UTIOR SYSTI(RIOR)
ACCESSIO~ NBR:850t 2<0367 DOC.DATE: 85/oe/05 NOTARIZED:
NO DOCKET FACIL:50-240 Robert Emmet Ginna Nuclear Planti Unit 1i Rochester G
05000204 AUTH.NAthE AUTHOR AFFILIATION ROBERgR ~
'I'le Rochester Gas L Electric Corp, REC IP. NAME RECIPIENT AFFILIATION 51URLEYiT ~ ED Region li Office of Director
SUBJECT:
Forwards Rev 10 to QA program for station operationr incorporating changes to corporate 8, Engineering Dept organization charts due to reestablishment of chief engineer
~
positio below vice president Position<
/I DISTRIBUTION C DE:
01 PIES RECEIVED:LTR ENCL SIZE:
TITLE: Qualit Assurance'ist
~ for Report Under Review NOTES:NRR/DL/SEP 1cy.
OL: 09/19/69 05000244 RECIPIENT ID CODE/NAME HILLERi C INTERNAL: ACRS IE COPIES LTTR ENCL 1
1 08 10 10 1
REC I P IENT ID CODE/NAPE ADM/LFMB IE/DQAVT/QAB COPIES LTTR ENCL 1
0 1
1 ILE 03 2
EXTERNAL: 2i~X NRC PDR NOTES:
02 LPDR 1
1 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20 ENCL 19
ill 1
al I
'I f
f P
t'
'I l
W r
t W
1I I
J A'
t ZZi(Zan j IIIIIIIII ZF7g(jZVZ ZznIII umzav ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 ROGER IN. KOBER VKC PRESIDENT ELECTRIC4 STCAM PRODUCTION TCLCPHONC ARcA coDc Tls 546.2700 June 5,
1985 Dr. Thomas E. Murley, Regional Administrator U. S. Nuclear Regulatory Commission Region 1
631 Park Avenue King of Prussia, Pennsylvania 19406
Subject:
Submittal of Quality Assurance Program R.
E. Ginna Nuclear Power Plant, Unit 1 Docket Number 50-244
Dear Dr. Murley:
Transmitted herewith and in accordance with 50.54 of 10CFR Part 50 is Revision 10 to the Quality Assurance Program for Station Operation.
This revision incorporates changes to the corporate and Engineering Department organization charts due to the re-establishment of the Chief Engineer position below the Vice President position.
Elevating the administrative link of the Manager, Quality Assurance from an Assistant Chief Engineer to the Vice President, Engineering and Construction was also accomplished.
This change which enhanced Quality Assurance independence from Engineering quality assurance activities, had no effect on the established reporting relationship of the Manager, Quality Assurance to the Vice President, Electric and Steam Production.
These changes have been previously submitted as a change to Technical Specifications.
Also included are some editorial changes which will clarify the comments identified in the NRC review of the Revision 9 submittal.
These changes do not reduce any of our previous commitments.
V y truly yours,
~d Roger W. Kober xc:
Enclosure HI:g (~
W. A. Cook, Resident Inspector
~I0/
(:Q(
~~
850b240367 850b PDR ADOCH, 0500024 P
I
~ ev E
~
g0
p
,l A
F I
'I P
p I su~
8