Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Matls Engineering Branch Second Round Questions". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19350D371  + (Forwards Matls Engineering Branch Request for Addl Info Re Preservice Insp Program.Preservice Insp Plan Consistent W/Required Edition of ASME Code,Including Proposed Exceptions to Code Requirements,Should Be Submitted)
  • ML17209A947  + (Forwards Matls Engineering Branch Request for Addl Info Re Preservice Insp Program.Preservice Insp Plan Consistent W/Required Edition of ASME Code,Including Proposed Exceptions to Code Requirements,Should Be Submitted)
  • ML19350D370  + (Forwards Matls Engineering Branch Request for Addl Info Re Preservice Insp Program.Preservice Insp Plan Consistent W/Required Edition of ASME Code,Including Proposed Exceptions to Code Requirements,Should Be Submitted)
  • ML17194A990  + (Forwards Matls Engineering Branch Request for Addl Info Re Pressure Temp Limits Based on Limiting Fracture Toughness of Reactor Vessel to Determine Applicability Per 10CFR50, Apps G & H.Prompt Response Requested)
  • ML17212A308  + (Forwards Matls Engineering Branch Request for Addl Info Re Facility Fsar.Info Required Concerns Design Assembly & Operating Conditions of Low Pressure Turbine Discs)
  • ML18018B435  + (Forwards Matls Engineering Branch Request for Addl Info Based on Review of FSAR Re Preservice Insp/Exam Plan. Response Requested within 6 Months of Ltr Receipt)
  • ML17212A306  + (Forwards Matls Engineering Branch Request for Addl Info to Complete FSAR Review.Util Must Verify Ownership of All Mineral Rights & Easement to Facility Property)
  • ML17275B242  + (Forwards Matls Engineering Branch Request for Addl Info Re Facility FSAR by 811101 to Complete OL Application Review)
  • ML20213D511  + (Forwards Matls Engineering Branch Review of Engineering Evaluation for Sacrificial Shield Wall.Rationale for Accepting Defects Lacks Definition in Some Areas & Is Unacceptable in Others)
  • ML20128L669  + (Forwards Matls Engineering Branch SER Based on Util 850131 Alternative Plan for Preservice Exam of ASME Class 2 Piping. Methodology Acceptable)
  • ML20128L676  + (Forwards Matls Engineering Branch SER Based on Util 850131 Alternative Plan for Preservice Exam of ASME Class 2 Piping. Methodology Acceptable)
  • ML20213D621  + (Forwards Matls Engineering Branch SER Input Re FSAR Re Compliance of Reactor Containment Boundary Matls W/General Design Criterion 51.Util Must Provide Reheat Temp Prior to Final Sizing of Seamless Pipe)
  • ML19283A214  + (Forwards Matls Engineering Branch SER Input on Preservice Insp Program.Input Discusses Current Status of Review)
  • ML20136F283  + (Forwards Matls Engineering Branch SER Re FSAR Section 5.4.1.1, Pump Flywheel Integrity. Flywheel Matl & Design of Pump Motor Assembly Acceptable)
  • ML20197J080  + (Forwards Matls Engineering Branch SER Re Limiting Postulated Design Temp.Util Containment Pressure Boundary Matls in Compliance W/Gdc 51)
  • ML20136F140  + (Forwards Matls Engineering Branch SER Re Elimination of Large Primary Loop Ruptures as Design Basis.Util Has Provided Technical Justification for Not Providing Devices Against Dynamic Effects of Postulated Pipe Breaks)
  • ML20151K379  + (Forwards Matls Engineering Branch SER and Region I Input to SER Re Insp & Repairs to Isolation Condenser Sys Piping.All Piping Welds Outside Containment & 15 Inside Ultrasonically Inspected.Insp & Repair Satisfactory)
  • ML20198F856  + (Forwards Matls Engineering Branch Safety Evaluation of Util PSAR Through Amend 8)
  • ML20197G237  + (Forwards Matls Engineering Branch Safety Evaluation of Nuclear Project 2 Engineering Evaluation of Washington Nuclear Project 2 Sacrificial Shield Wall Suppl 3 - Final Rept. Acceptance of Rept Recommended)
  • ML19329C499  + (Forwards Matls Engineering Branch Safety Evaluation Approving Reactor Vessel Internals,Rcs & Connected Sys, Containment Heat Removal & ECCS Sys)
  • ML20209A984  + (Forwards Matls Engineering Branch Safety Evaluation Suppl Approving Util 801223 Request for Relief from Inservice Insp & Testing Requirements of 10CFR50)
  • ML20136F296  + (Forwards Matls Engineering Branch Safety Evaluation Re GDC 51 Compliance Review of RCPB Matls,Per 831215 Meeting W/Util in Bethesda,Md.Addl Confirmatory Info Will Be Provided by Applicant)
  • ML14192A608  + (Forwards Matls Engineering Branch Safety Evaluation Based on Review of 840629 & 1030 Submittals Re Reactor Vessel Matl Properties.Chemical Composition of Beltline Weld Matls Acceptable.Pressurized Thermal Shock Issue Unresolved)
  • ML17346A359  + (Forwards Matls Engineering Branch Safety Evaluation Re Reactor Vessel Matls Data Submitted by .Data Base Supports Values & Acceptable for Screening Criteria Calculations for Pressurized Thermal Shock)
  • ML20210S923  + (Forwards Matls Engineering Branch Safety Evaluation Input Re Info in PSAR Through Amend 14)
  • ML19209A837  + (Forwards Matls Engineering Branch Second Round Questions)
  • ML20214G479  + (Forwards Matls Engineering Branch Section of Ser.Applicant Should Provide Statement Re Compliance W/App G, Protection Against Non-Ductile Failure, to Establish Pressure & Temp Limitations During Operational Startup & Shutdown)
  • IA-86-280, Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments  + (Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments)
  • ML20197J423  + (Forwards Matls Engineering Branch Sser Input to Section 6.2.7 Re Fracture Prevention of Containment Pressure Boundary.Valves Will Comply W/Gdc 51 Based on Util 850312 Commitments)
  • ML20136F680  + (Forwards Matls Engineering Branch Sser Input Re Compliance W/Gdc 51 Re Fracture Prevention of Containment Pressure Boundary)
  • ML20033D826  + (Forwards Matls Engineering Branch Sser Re Actions to Mitigate Inergranular Stress Corrosion of Stainless Steel Piping Sys.Util Has Met Regulatory Requirements.Surveillance Program Adequate)
  • ML20040G084  + (Forwards Matls Engineering Branch Statement of Status of Review of Unresolved Preservice & Inservice Insp Programs. Proposes Meeting W/Nrc,Pnwl & Westinghouse)
  • ML20206G281  + (Forwards Matls Furnished by NRC for Work Under Task Order 3,under Area 3 of FIN J-5131.Task Order Issued with NRC Form 173,included.Without Encls)
  • ML20155J884  + (Forwards Matls Insp List for All Insps in State of Il.Each Inspector Requested to Complete 14 State Insps within Next 6 Months.Records of 860328 Telcon W/R Fonner & 860408 Telcon W/J Lubenau Encl)
  • ML20039H241  + (Forwards Matls Integrity Section of Matls Engineering Branch Safety Evaluation of Supplemental Sar,Including Amend 7)
  • ML20129H775  + (Forwards Matls License Package Containing Documents Supporting Issuance of License SNM-1949 to Util for Receipt, Possession,Insp & Storage of Snm.Related Correspondence)
  • ML20217P904  + (Forwards Matls License SNM-696 Amended to Delete Group Laboratories as Places of Authorized Use of Licensed Matls & to Allow Unrestricted Use)
  • ML20056A635  + (Forwards Matls Licensing Package to Amend 2 to License 50-23226-01.Control:571153)
  • ML20209A861  + (Forwards Matls Needed to Complete Assignment During Emergency Preparedness Exercise on 860916-19.W/o Encl)
  • ML20210T334  + (Forwards Matls Performance Section of Matls Engineering Branch Section of Safety Evaluation Re PSAR Through Amend 14.Integrity of Reactor Vessel Assured for Listed Reasons)
  • ML20210B126  + (Forwards Matls Prepared by Hayward Tyler Pump Co Re Insp & Investigation of Company.Matl Re Equipment Drain Pumps Should Be Replaced W/Encl.Supporting Documentation Encl)
  • ML20080C606  + (Forwards Matls Re Adequacy of Emergency Planning at Facility,Including IE Insp Rept 50-289/83-35 Which Sets Forth Findings & Conclusions of Staff Who Observed Exercise & INPO Re Findings)
  • ML20029E122  + (Forwards Matls Re CRGR Meeting 193 Not Previously Released Concerning Final Amend to PTS Rule (10CFR50.61),amend to 10CFR50.55a Endorsing Newer Versions of ASME Code & Addl Info on Amend to 10CFR50.55a, Codes & Standards)
  • ML19343A185  + (Forwards Matls Re General Public Utils Svc Corp Economic Measures.Sm Shanaman (PA Public Utils Commission) 800827 Statement to PA Congressional Delegation Encl)
  • ML20234E006  + (Forwards Matls Re Proposed Reactor at Bodega Head,Per Request.Press Release Has Encls Re ACRS Ltr Rept & Div of Reactor Licensing Hazards Analysis.W/O Encl)
  • ML20140B589  + (Forwards Matls Re Recently Filed Testimony of Nauman)
  • ML19319C395  + (Forwards Matls Re Review of Antitrust Case.W/O Encl)
  • ML20010F986  + (Forwards Matls Re Testimony to Be Prepared on Emergency Preparedness.W/O Encl)
  • W3P83-1815, Forwards Matls Received from Shell Oil & Chemical Co, Consisting of Ltr of Agreement,Affidavit & Updated Response to Questionnaire Re Facility.Updated Questionnaire Response Withheld (Ref 10CFR2.790)  + (Forwards Matls Received from Shell Oil & Chemical Co, Consisting of Ltr of Agreement,Affidavit & Updated Response to Questionnaire Re Facility.Updated Questionnaire Response Withheld (Ref 10CFR2.790))
  • ML20149D997  + (Forwards Matls Related to CRGR Meeting 198 Re Draft Final Amend to 10CFR50,App J Concerning Containment Leakage Testing)
  • ML17352B260  + (Forwards Matls Related to CRGR Meeting 199 Re Draft Final Amend to 10CFR50,App J on Containment Leakage Testing)