Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17325B587 + (Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current ESRR Schedule Provided for Info Purposes,Reflecting Revised Target Dates)
- ML17325B588 + (Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates)
- U-602264, Forwards Current Revs to Apps Iii,Iv & V of Clinton Power Station ISI Program Manual + (Forwards Current Revs to Apps Iii,Iv & V of Clinton Power Station ISI Program Manual)
- ML20212E296 + (Forwards Current Roster of IIT Team Leaders & Members,Ofcs of Assignment & Qualification & Characteristics for IIT Members)
- ML20054H253 + (Forwards Current Rosters for Univ Committees Affected by State Licenses)
- ML19320C050 + (Forwards Current Rules of Practice.W/O Encl)
- ML20078M872 + (Forwards Current SBLOCA PCTs & Details on Model Errors & Changes)
- ML20059H332 + (Forwards Current SBLOCA PCTs for Facilities & Addl Details on Model Errors/Model Changes,Per 10CFR50.46(a)(3)(i))
- ML20116L579 + (Forwards Current SBLOCA PCTs for Units 1 & 2.Attachment 2 Provides Addl Details on Model Error & Changes)
- ML17250A632 + (Forwards Current SEP Topics 3-10.A,6-7.C.1,6-7.F & 3-3.B. Assessments Compare Facility W/Current NRC Licensing Criteria.Requests Proposed Tech Spec Change to Prevent Transfer of All Four Instrument Buses to Same Source)
- L-88-520, Forwards Current Schedule for Completion of SPDS Items,Per NRC 881027 Request + (Forwards Current Schedule for Completion of SPDS Items,Per NRC 881027 Request)
- ML18026A349 + (Forwards Current Schedule for Completion of Plant Procedures Review.Reviews Will Include Evaluation of Safety Sys Valves & Operability,Per TMI Action Plan Items II.K.1.5 & 10)
- ST-HL-AE-1155, Forwards Current Schedule for Harsh Environ Equipment Qualification Testing,Per 840609 Meeting.Related Correspondence + (Forwards Current Schedule for Harsh Environ Equipment Qualification Testing,Per 840609 Meeting.Related Correspondence)
- ML20054L849 + (Forwards Current Schedule for Installation of Qualified Electrical Equipment.Evaluation Worksheets & Test Repts Have Not Been Sent for Item II.D.3, Valve Position Indication, Since Five of Six Units Tested Failed)
- ML19282B539 + (Forwards Current Schedule for Remainder of Environ Review. Schedule Assumes Timely Receipt of EPA Input to Fes.W/Epa)
- ML20209D967 + (Forwards Current Schedule for Remaining Plants Subj to Multi-Plant Action B-82,Item 4.3, Actuations of Shunt Trip Attachment. All Related Correspondence Requested)
- B17589, Forwards Current Schedule for Submission of LARs Planned or Required in 1998 or 1999,as Committed to in Licensee .List Includes Amend Requests Required for RF06 + (Forwards Current Schedule for Submission of LARs Planned or Required in 1998 or 1999,as Committed to in Licensee .List Includes Amend Requests Required for RF06)
- ML20135J035 + (Forwards Current Schedule for Unit 1 Tech Spec Review. Marked-up Tech Specs Will Be Evaluated & Transmitted by 851021.Meeting W/Util Around 851021 to Discuss Review Planned)
- ML19257A485 + (Forwards Current Schedule of Info Re Recovery Program Repts in Response to NRC 791203 Request)
- ML20148J308 + (Forwards Current Schedule to Meet Requirements for Conversion from Highly Enriched U to Low Enriched U Fuel & Vr Ohlsson Informing Univ That Funding Available for Sept 1987 - Aug 1989 for Fuel Conversion)
- ML20082R348 + (Forwards Current Set of Effective Pages Through Rev 2 of Emergency Plan & Handmarked Pages Showing Each Correction, Per Statement at 831201 Prehearing Conference.Certificate of Svc Encl)
- ML20071L675 + (Forwards Current Staff Plans Re Advanced Std Plant Reviews. Info Consistent W/Responses to Congressman Bevill & Congresswoman Lloyd)
- ML20211J111 + (Forwards Current Startup Schedule for Timeframe & Activities Occurring 3 Wks Prior to Generator Synchronization & General Operating Instructions GOI-1,GOI-2 & GOI-5 for Startup & Power Escalation,In Response to 860922 Request.W/O Encls)
- ML19323F074 + (Forwards Current Status & Continuing Implementation Actions of Security Plan Per 800505 Immediate Action Ltr.Encl Withheld (Ref 10CFR2.790))
- ML20128K078 + (Forwards Current Status & Rev to 850311 Proposed HVAC Weld Testing Program & Response to Unknown Welder Issue,Per Insp Repts 50-456/83-09 & 50-457/83-09)
- ML19323B625 + (Forwards Current Status Inventory of Fuel Storage.Table Encl)
- ML20065J104 + (Forwards Current Status List of Emergency Preparedness NRC Appraisal App B Items)
- ML20049A439 + (Forwards Current Status Rept for TMI Action Plan Items,Per NUREG-0660 & NUREG-0737)
- NRC-94-4117, Forwards Current Status of AP600 Testing Program Issues Identified in NRC ,Including Westinghouse Understanding of Mutual Conclusions Reached at 940407 Meeting + (Forwards Current Status of AP600 Testing Program Issues Identified in NRC ,Including Westinghouse Understanding of Mutual Conclusions Reached at 940407 Meeting)
- ML20012B359 + (Forwards Current Status of All Unimplemented Usis,Per Generic Ltr 89-21,including A-9 Re ATWS,A-26 Re Reactor Vessel Pressure Transient protection,A-44 Re Station blackout,A-46 & A-47)
- ML20054E099 + (Forwards Current Status of Applicable NUREG-0737 Items, Completing Response to Generic Ltr 82-05.Proposed Completion Dates Encl)
- ML19332D739 + (Forwards Current Status of Each State in Providing Disposal of Low Level Radwaste as of 890501 for Info.State,Local & Indian Tribe Programs Plans to Update Status on Periodic Basis.Corrections,Suggestions & Addl Info Requested)
- ML20051Z084 + (Forwards Current Status of Fuel Stored at Morris Facility in Mar & Apr 1982)
- ML19343D600 + (Forwards Current Status of Fuel Stored at Facility for Nov & Dec)
- ML20012E937 + (Forwards Current Status of Implementation of USI at Facility.Status Summary Based Upon Licensee Response to Generic Ltr 89-21,discussions W/Licensee & Review of Available NRC Records & Info)
- BSEP-84-0250, Forwards Current Status of Investigation Involving LER 2-83-95 Re Fire Penetration Seal Deterioration & Revised Dates for Submittal of Action Plan & Completion of Investigation + (Forwards Current Status of Investigation Involving LER 2-83-95 Re Fire Penetration Seal Deterioration & Revised Dates for Submittal of Action Plan & Completion of Investigation)
- ML20127B905 + (Forwards Current Status of Issues Needing Resolution Prior to Licensing Decisions Covering FSAR Review,Basemat & Insps)
- ML20106F383 + (Forwards Current Status of Maint Area Comprehensive Corrective Action Program Per Insp Rept 50-346/83-01. Performance Enhancement Program Updated on 840427,per Insp Rept 50-346/84-04 Request for Info)
- ML20154G599 + (Forwards Current Status of NRC Review of C-E Owners Group Repts,Per 880330 Request.Understanding That Only Four Repts of 10 Issues Discussed at Meeting Received by NRC Reviewers Stated)
- ML20092P562 + (Forwards Current Status of NUREG-0737 Items.Table 1 Includes Listing of NUREG-0737 Items NRC Considers Acceptable & Resolved.Table 2 Provides Target Dates of Planned Mods)
- ML20096D783 + (Forwards Current Status of Plant Through 840325 to Be Used for Updating NRC Const Status Rept (Yellow Book).Rept Reflects Present Const Plans & Approved Trends)
- B11185, Forwards Current Status of Procedures & Sys Review Branch Draft SER Open Items & Revised Responses for Open Items PSRB-13,15 & 18 + (Forwards Current Status of Procedures & Sys Review Branch Draft SER Open Items & Revised Responses for Open Items PSRB-13,15 & 18)
- ML18033A825 + (Forwards Current Status of Readiness of Plant for Restart Insps.Electrical Issues Insp to Be Confirmed on 890712. Startup Work Complete on Power Ascension Test Program Insp)
- ML20012C005 + (Forwards Current Status of Unimplemented USIs for Facility,Per Generic Ltr 89-21,including USI A-9 Re ATWS, USI A-44 Re Station Blackout,Usi A-46 Re Seismic Qualification of Equipment & USI A-47)
- ML19208B215 + (Forwards Current Status of Wi Radiological Emergency Response Plan & Recommendations on Protective Action Planning for Human Food & Animal Feeds)
- ML19330C312 + (Forwards Current Status of re-evaluation of Equipment Qualification for Seismic & Hydrodynamic Loads,In Response to NRC 800223 Request for Sqrt Info.Nsss Equipment Qualification Status Summary Encl)
- ML19330C313 + (Forwards Current Status of re-evaluation of Equipment Qualification for Seismic & Hydrodynamic Loads,In Response to NRC 800223 Request for Sqrt Info.Nsss Equipment Qualification Status Summary Encl)
- ML20073M159 + (Forwards Current Status,Integration Plan & Proposed Schedule for Completing Basic Requirements in 821217 Generic Ltr 82-33,Suppl 1 to NUREG-0737.Emergency Operating Procedures Will Be Checked for Compatibility W/Control Room Procedure)
- ML20133H664 + (Forwards Current Svc List for Committee to Bridge the Gap Re staff-generated Correspondence & Documents Concerning Facility)
- ML20137U904 + (Forwards Current Tables of Organization of Florida Bureau of Radiation Control)
- ML20128G081 + (Forwards Current Tech Spec Page 5-1 to Replace Page 5-1 Submitted w/850426 Request to Amend License DPR-71 Re Fuel Cycle 5 Reload)